REG NASA-LLIS-6496-2012 Lessons Learned - Integrate Earned Value Management Tools With the Project Management System.pdf
《REG NASA-LLIS-6496-2012 Lessons Learned - Integrate Earned Value Management Tools With the Project Management System.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-6496-2012 Lessons Learned - Integrate Earned Value Management Tools With the Project Management System.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Public Lessons Learned Entry: 6496 Lesson Info: Lesson Number: 6496 Lesson Date: 2011-12-13 Submitting Organization: JPL Submitted by: David Oberhettinger Subject: Integrate Earned Value Management Tools With the Project Management System Abstract: For EVM to apply timely and effective corrective ac
2、tion to minimize cost overruns, it must be fully integrated with the project management systems that supply up-to-date budget, schedule, and cost data. EVM pilot exercises performed on two NASA projects were constrained by the inability to adequately “feed” the automated EVM analysis tool with the d
3、ata needed to generate EVM products. The financial and scheduling systems for managing the NASA project and providing configuration control must be sufficiently mature to support the integration of an EVM process into the project. Description of Driving Event: Although NASA projects with funding of
4、over $20 million are required to use Earned Value Management (EVM) techniques to measure and assess project performance (Reference (1), EVM systems and processes are not well established throughout NASA. The NASA EVM Capability Project was established by the NASA Office of Chief Engineer (OCE) to de
5、velop and pilot an agency-wide, in-house, EVM capability that will meet NASAs project management requirements and ensure compliance with the federal Office of Management and Budget (OMB) mandates. The NASA Program Management Council (PMC) approved the NASA EVM Capability Project on December 16, 2009
6、. There are three primary objectives of the EVM project: 1. Establish a NASA EVM process, along with the supporting documentation, that can be used as a model for all NASA projects that must implement EVM. 2. Demonstrate the NASA-wide EVM capability process on two projects (1) the Extravehicular Act
7、ivity (EVA) Systems Project and (2) the Ice, Clouds, and Land Elevation Satellite II (ICESat-2) Project. The purpose of these two EVM pilot exercises is to test and modify the process as needed to ensure the most effective implementation of a NASA-wide EVM capability. Sponsored by the Exploration Sy
8、stems Mission Directorate (ESMD) and managed by NASA Johnson Space Center, the EVA Systems Project seeks to protect humans while operating outside the pressurized spacecraft environment and while exploring other planetary bodies. Sponsored by the Science Mission Directorate (SMD) and managed by NASA
9、 Goddard Space Flight Center, ICESat-2 is the second generation of the orbiting laser altimeter ICESat scheduled for launch in early 2016. 3. Enhance NASA management insight into project performance by employing an effective EVM capability. For EVM to detect variances between the work planned and th
10、e work performed, data inputs from the target project are required. Primary EVM data elements include, for example, the Budgeted Cost for Work Scheduled (i.e., the projected cost or labor hours for the scheduled work to be performed) and the Budgeted Cost for Work Performed (i.e., the actual cost or
11、 labor hours for the actual work performed). Such primary data elements are then used to calculate derived data elements, such as Budget At Completion (i.e., the total cost of the project). However, the value assigned to each data element is associated with a particular date, and the value will chan
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS64962012LESSONSLEARNEDINTEGRATEEARNEDVALUEMANAGEMENTTOOLSWITHTHEPROJECTMANAGEMENTSYSTEMPDF

链接地址:http://www.mydoc123.com/p-1019541.html