1、 Public Lessons Learned Entry: 6416 Lesson Info: Lesson Number: 6416 Lesson Date: 2012-2-3 Submitting Organization: GRC Submitted by: Ralph Zerick Subject: SpaceWire Cable Fabrication and Installation Abstract: This lessons learned addresses handling, fabrication, integration and test issues identif
2、ied during the use of Gore SpaceWire cable, part number GSC-05-82730-00, size AWG26. This wire was used in flight hardware intended for deployment on the International Space Station. Specific problems experienced with this wire as well as recommendations to avoid similar problems are discussed herei
3、n. Description of Driving Event: Preparation and execution of CoNNeCT Comm Performance and TVAC System Level Testing involved Gore SpaceWire cable, one cable stopped functioning after the flight enclosure was shipped to the vibration lab in preparation for system level vibration testing. Another cab
4、le stopped functioning after it was installed in the flight hardware, however, it had passed all tests performed during fabrication. Lesson(s) Learned: Cable EFA517-001, SpaceWire Cable #3 This cable stopped functioning after the flight enclosure was shipped to the vibration lab in preparation for s
5、ystem level vibration testing. Prior to final tie wrap installation to secure all the internal cable bundles and the movement to the vibe lab this cable was functioning properly. After extensive trouble shooting at GRC indicated a probable short or open, the cable was taken to the Naval Research Lab
6、oratory in Washington DC for further evaluation. Time Domain Reflectometry tests identified the conductor and location in the cable where an intermittent short existed. Destructive Physical Analysis confirmed the location of the short. Lack of detailed instructions in the process plan resulted in th
7、e omission of shrink tubing around the wires for protection when the backshell was installed. The technician who had been assembling the SpaceWire cables was away and his replacement was not aware the shrink tubing had to be installed as part of the assembly process. It was also very apparent the ex
8、panded Teflon insulation on the individual wires was very soft and susceptible to damage under even very light point compression. Cable EFA518 -002, SpaceWire Cable #4 This cable stopped functioning after it was installed in the flight hardware. It had passed all functional tests during assembly. Af
9、ter extensive troubleshooting it was determined alcohol used during the post solder cleaning process was absorbed by the expanded Teflon insulation, wicked its way up the cable, caused an insulation breakdown, and ultimate failure of the cable. Lack of drawing detail on the cable assembly drawing sh
10、owing the Micro-D connector face in relation to a right angle backshell resulted to the connector being incorrectly oriented during assembly. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Figure 1: Connector side by side with a dime Figure 2: Wires
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS64162012LESSONSLEARNEDSPACEWIRECABLEFABRICATIONANDINSTALLATIONPDF

链接地址:http://www.mydoc123.com/p-1019537.html