1、Public Lessons Learned Entry: 5957 Lesson Info: Lesson Number: 5957 Lesson Date: 2011-06-29 Submitting Organization: KSC Submitted by: Amber Porter Subject: Sensor Package 1 (SP1) Pan/Tilt Unit Damage Abstract: On July 31, 2007, a Sensor Pack 1 (SP1) was found damaged during placement into a shippin
2、g container following a successful Integrated Verification Test (IVT). IVT is an electrical functional verification of the SP1 while integrated to the Canadian Orbiter Boom Sensor System (OBSS). The test was performed on the Level 13 platforms in the Orbiter Processing Facility (OPF) OPF-3, in prepa
3、ration for later installation into the OV-103 (Discovery) payload bay. Description of Driving Event: On the day of the incident, two Orbiter mid-body technicians were tasked to remove SP1 S/N 1003 from its test fixture (called an L-Bracket) and stow it into a shipping container for movement to anoth
4、er part of the Orbiter mid-body. After rotating the sensor and its mounting base several times while attempting to find the proper orientation in the container, one of the technicians noticed a small piece of the sensor, later identified as a rotation stop, lying in the bottom of the container. The
5、technicians notified their supervisor who, in-turn, notified the OPF-3 Bay Manager and USA Safety Management of the broken stop. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Figure 1: SP1 Transport Container Showing Foam That Was Removed The techn
6、icians that originally removed the SP1 and installed it on the L-Bracket removed the foam from the container. As a result of inadequate direction in the procedure, the technicians on first shift, perceived the need to remove the foam from the container to act as a support to prevent toppling of the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS59572012SENSORPACKAGE1SP1PANTILTUNITDAMAGEPDF

链接地址:http://www.mydoc123.com/p-1019511.html