REG NASA-LLIS-2216-2009 Lessons Learned - Ban Nonessential Infrastructure Support Services That Could Disrupt Critical Mission Operations.pdf
《REG NASA-LLIS-2216-2009 Lessons Learned - Ban Nonessential Infrastructure Support Services That Could Disrupt Critical Mission Operations.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-2216-2009 Lessons Learned - Ban Nonessential Infrastructure Support Services That Could Disrupt Critical Mission Operations.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 2216Lesson Info:a71 Lesson Number: 2216a71 Lesson Date: 2009-08-18a71 Submitting Organization: JPLa71 Submitted by: David Oberhettingera71 POC Name: Joseph Guinn; Ronald D. Sharpa71 POC Email: Joseph.R.Guinnjpl.nasa.gov; Ronald.D.Sharp-104583jpl.nasa.gova71 POC Phone: 818-354-
2、0425 (Guinn); 818-393-7919 (Sharp)Subject: Ban Nonessential Infrastructure Support Services That Could Disrupt Critical Mission Operations Abstract: Contractors arrived at the Phoenix Navigation Mission Support Area during a mission-critical Mars Phoenix project event, and they continued to perform
3、disruptive repairs to a badge reader despite a declared facility freeze. Establish and maintain institutional procedures for coordination of nonessential infrastructure services with scheduled configuration control freezes instituted at the request of flight projects during critical mission operatio
4、ns.Description of Driving Event: Eight days before the May 2008 arrival of Mars Phoenix Lander at the north polar region of Mars, the Phoenix Project at the NASA/Caltech Jet Propulsion Laboratory (JPL) was preparing a final trajectory correction maneuver (TCM-5) to guide the spacecraft on its naviga
5、ted course. A final TCM is a mission-critical event in which an error, or non-performance of the maneuver, can result in mission loss (Reference (1). Due to the criticality of this spacecraft command sequence and the limited time available to prepare it, the Phoenix Mission Manager imposed a Level 2
6、 facility freeze for the Phoenix Navigation Mission Support Area (MSA) on the 6th floor of Building 264. A Level 1 configuration control freeze is requested by a flight project, and it restricts changes to the configuration of multiple JPL facilities during a critical event. In contrast, the restric
7、tions associated with a Level 2 freeze are limited to a specific facility or service. The project notifies a facility manager of the Level 2 freeze, and a printed tag is placed at the facility entrance. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,
8、-Access to the MSA is restricted by an electronic badge reader that operates the door lock. An upgrade to the badge reader system in Building 264 was scheduled for May 2008, which happened to be on a Saturday during the Level 2 freeze for TCM-5 sequence development (Reference (2). Contractors arrive
9、d during the freeze, and started work on the reader even though the Phoenix Mission Manager explained that there was a critical event in progress. The upgrade work involved removal of ceiling tiles directly above the MSA and work in the crawl space without regard for the computer equipment directly
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS22162009LESSONSLEARNEDBANNONESSENTIALINFRASTRUCTURESUPPORTSERVICESTHATCOULDDISRUPTCRITICALMISSIONOPERATIONSPDF

链接地址:http://www.mydoc123.com/p-1019366.html