1、Lessons Learned Entry: 1716Lesson Info:a71 Lesson Number: 1716a71 Lesson Date: 2004-10-1a71 Submitting Organization: JSCa71 Submitted by: Ron Montaguea71 POC Name: Shelia Powella71 POC Email: shelia.k.powellnasa.gova71 POC Phone: 281-483-3142Subject: Configuration control of electrical conductors du
2、ring facilities installations Abstract: Power cables in tight power cabinets are susceptible to damage from penetrating fasteners.Description of Driving Event: An electrician suffered burns from an electrical arc when a pre-existing condition in a power distribution panel ultimately led to a ground
3、fault in a 3-phase 480-volt power supply. The pre-existing condition was believed to be an access panel fastener that had penetrated conductor insulation. Power distribution panel designs must allow sufficient internal space within the panel enclosure to route the conductor cables away from fastener
4、s. In the case of this mishap, it appeared that the conductor cables were routed close to the front access panels and dead front where there are multiple fasteners capable of penetrating the cable insulation. A combination of too small a panel plus overcrowded cabling ultimately resulted in fastener
5、 penetration of conductor insulation. Control of the cables was complicated further by the sinuous, unrestrained routing of the cables from the floor to the breaker connections (see picture). Periodic power surges (such as by operating high-voltage breakers or by operating pre-programmed power line
6、surge control devices such as reclosures) can physically jar cables (much like a water or air hose experiencing a sudden pressure increase), moving them incrementally closer to fasteners. Short and straight runs of unrestrained cables would not experience this type of response. Repeated removal and
7、reinstallation of the fasteners for panel access due to construction and maintenance activity may have jeopardized the integrity of the electrical cable insulation. Each Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-removal and reinstallation cycle
8、 may have further penetrated the insulation. Lesson(s) Learned: Ensure that design and acceptance criteria are adequately developed and implemented to route conductors in panel enclosures away from fasteners and sharp edges.Recommendation(s): 1. Ensure that adequate design and inspection criteria ar
9、e developed to provide for sufficient cable clearance within an enclosure. Implement the inspection criteria in both acceptance and preventative maintenance inspections. 2. Conduct a site-wide survey and identify all panels meeting the following criteria: a. Locations between the building transforme
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS17162004LESSONSLEARNEDCONFIGURATIONCONTROLOFELECTRICALCONDUCTORSDURINGFACILITIESINSTALLATIONSPDF

链接地址:http://www.mydoc123.com/p-1019258.html