1、Lessons Learned Entry: 1619Lesson Info:a71 Lesson Number: 1619a71 Lesson Date: 2005-08-08a71 Submitting Organization: JPLa71 Authored by: Ron Welcha71 POC Name: Ron Welch, David Oberhettinger, Richard Payntera71 POC Email: Ronald.T.Welchjpl.nasa.gova71 POC Phone: 818-354-7096Subject: Mate/Demate, Ve
2、rify, and Document Connectors One-at-a-Time (2003) Abstract: An integration and test failure was traced to an unmated flight connector that was registered as “mated” in the mate/demate log. The root cause was attributed to the failure of a technician/engineer to pause after each mate/ demate operati
3、on to enter it in the log, and to obtain QA verification. Flight connectors located in crowded or constrained areas (as well as those in more visible areas) must be mated or demated one-at-a-time under QA supervision, and accurate documentation of the connector status must be maintained. Description
4、 of Driving Event: When the navigation camera (Navcam) power was switched on during integration and test (I&T) of the Mars Exploration Rover (MER) spacecraft, voltage measurements showed no power or data signals within the Navcam circuits. The Navcam had worked properly when tested prior to an earli
5、er removal and re-installation of the Rover Power Distribution Unit (RPDU). An investigation revealed an un-mated connector on the Nonvolatile Memory and Camera Interface Board (NVMCAM) within the Rover Electronics Module (REM) (Figure 1). The assembly procedure called for the mating of this connect
6、or, and the mate/demate log indicated that the connector had been mated. The root cause of the workmanship error was attributed to the failure of a technician/ engineer to pause after each mate/demate operation to enter it in the log, and to obtain Quality Assurance (QA) verification. A high connect
7、or density and an obstructed view within the REM make it difficult to verify the status of a single connector once multiple connectors Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-have been mated. MER also has other high-density connection areas s
8、uch as the Rover bulkheads (Figure 2). Fig 1. The unmated connector was located beneath the flex cable shown in this photo of the REM, and the mating operation is conducted with the flex cable in place. Fig 2. Example of high density cabling and connections along the MER bulkheads.Although the impac
9、t of this error was minor, de-integration and rework to re-mate a connector in a highly integrated system like MER can pose a major risk to flight hardware. After this incident, the Assembly, Test, and Launch Operations (ATLO) manager mandated a “one at a time” practice of QA verification after ever
10、y MER connector mate/demate, and it did not permit mate/demate of multiple connectors prior to obtaining QA support. References:1. JPL Problem/Failure Report No. Z79107, January 20, 2003.2. “Crimping, Interconnecting Cables, Harnesses, and Wiring,” NASA-STD-8739.4, February 9, 1998. 3. “Magellan Bat
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS16192005LESSONSLEARNEDMATEDEMATEVERIFYANDDOCUMENTCONNECTORSONEATATIME2003PDF

链接地址:http://www.mydoc123.com/p-1019242.html