1、Lessons Learned Entry: 1338Lesson Info:a71 Lesson Number: 1338a71 Lesson Date: 2002-04-15a71 Submitting Organization: SSCa71 Submitted by: Michael E. McDaniel, Boeing-SSC Manager S&MASubject: Stennis Space Center Near-Miss/Ground Support Equipment Description of Driving Event: On Monday, April 15, 2
2、002 at approximately 5:45 PM the following incident occurred on the Stennis Space Center A1 test stand, level 5 upper engine work deck.Subsequent to the removal and replacement of a High Pressure Fuel Pump the upper engine deck extension piece was rolled away from the main upper engine deck with the
3、 pump lifting/handling device still on the upper engine deck extension piece. The pump lifting device fell off the upper engine deck pinning a quality inspector between it and the upper engine deck handrail. The arm of the pump lifting/handling device was moved enough for the employee to be moved aw
4、ay and the deck was cleared. The device was secured in the as-rested position and the deck was cordoned off. The employee was able to walk on his own to inside the test stand. The employee was transported to a local hospital for an examination as a precaution. Photographs were taken of the area and
5、equipment involved (contact Michael McDaniel, 228-688-2233).An investigation/preventive action team was formed by management on the morning of Tuesday, April 16, 2002 to investigate, find the root cause, and make corrective action recommendations.The A1 test stand had been recently reconfigured from
6、 a previous test program to a different test program after a 5 year period. The test team had moved from the A2 test stand to the A1 test stand. The test team did not feel this was a factor due to the similarities between the two test stands. The normal configuration for all pump removals is to use
7、a roll-around work deck extension piece secured to the main work deck via turnbuckles.Lesson(s) Learned: The extension deck mover left the main engine deck and proceeded to the position of the secured Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-e
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS13382002LESSONSLEARNEDSTENNISSPACECENTERNEARMISSGROUNDSUPPORTEQUIPMENTPDF

链接地址:http://www.mydoc123.com/p-1018977.html