REG NASA-LLIS-1312-2002 Lessons Learned The Effects of a Project-s Culture on Risk Management Success.pdf
《REG NASA-LLIS-1312-2002 Lessons Learned The Effects of a Project-s Culture on Risk Management Success.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-1312-2002 Lessons Learned The Effects of a Project-s Culture on Risk Management Success.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 1312Lesson Info:a71 Lesson Number: 1312a71 Lesson Date: 2002-01-01a71 Submitting Organization: ARCa71 Submitted by: DR Mendoza/M. SumichSubject: The Effects of a Projects Culture on Risk Management Success Description of Driving Event: The Project was responsible for developin
2、g and operating a flight vehicle that would demonstrate several new technologies and capabilities. While the new technologies and capabilities being incorporated into the vehicle had been tested and analyzed independently and separately using wind tunnel and computational methods, it would be the fi
3、rst time they would be integrated together. Therefore, the Project had a significant level of risk characteristic of flight demonstration/test activities. However, several factors that can best be described as a “risk and safety culture“ ensured the Project addressed risks appropriately. These facto
4、rs were: 1. The Project team had lots of experience with high-risk flight test programs.2. The Project decided to build two fully functional test vehicles as opposed to one with built in redundancy (note: those items deemed critical to safe operation were redundant) but treated each vehicle like it
5、was a unique irreplaceable asset. The Project took pride in delivering two fully functional vehicles and sought risk mitigation solutions independent of having two vehicles prior to solutions dependant on a two asset Project. Thus, in terms of developing risk mitigation strategies, the solution for
6、loosing some or all capability in the first vehicle, namely “having a backup or second vehicle,“ was considered last.3. To further reduce risk, as well as cost and schedule, the Project elected to control the vehicles remotely. However, the team took great pride in demonstrating the new flight new t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS13122002LESSONSLEARNEDTHEEFFECTSOFAPROJECTSCULTUREONRISKMANAGEMENTSUCCESSPDF

链接地址:http://www.mydoc123.com/p-1018951.html