REG NASA-LLIS-1212-1998 Lessons Learned Contingency Planning for Control of Test Hardware During Anomalous Episodes.pdf
《REG NASA-LLIS-1212-1998 Lessons Learned Contingency Planning for Control of Test Hardware During Anomalous Episodes.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-1212-1998 Lessons Learned Contingency Planning for Control of Test Hardware During Anomalous Episodes.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 1212Lesson Info:a71 Lesson Number: 1212a71 Lesson Date: 1998-12-07a71 Submitting Organization: JSCa71 Submitted by: N. O. Gaspar/ Ronald A. MontagueSubject: Contingency Planning for Control of Test Hardware During Anomalous Episodes Description of Driving Event: During functio
2、nal test of the Qualification Model of the Mobile Transporter (MT) Linear Drive Unit (LDU), mounted on the Functional Test Fixture (FTF) a power surge followed by a facility power outage occurred. A sequence of events began that resulted in two incidents.Incident #1: When power was restored, the Spe
3、cial Test Equipment (STE) console and data acquisition systems (computers) were restarted. For the STE, the operator selected the appropriate program to power up the fixture motors to warm them up, in preparation for the start of the Fixture Characterization Procedure. Unexpectedly the X-axis motor
4、started, raising the carriage until the screw securing the load cell contacted the lower end of the motor ball screw, causing the flexible coupling to be sheared off. Investigating of the uncommanded movement revealed that several Test Console electrical/electronic components were defective, most li
5、kely as a result of the power surge. The fixture motor controller PMAC card, the X-axis motor servo amplifier and the Y-axis motor relay were removed and replaced. The flexible coupling was also removed and replaced.Incident #2: Under the assumption that the motor was still disconnected from the X-a
6、xis ball screw, the system check-out was started. The motor drove the X-axis to the lower end of travel at which point the kill switch was activated to disable the unit. During the uncontrolled motion the LDU qualification unit bogie wheels contacted the lower flange of the test rail and became load
7、ed (no damage found, only superficial scratch) but damage was incurred by the STE X-axis load cell and related hardware. Root cause: Incident #1: Primary Cause: Failure to properly check out the electronic equipment following a known power surge/power outage. Contributing Causes: Provided by IHSNot
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS12121998LESSONSLEARNEDCONTINGENCYPLANNINGFORCONTROLOFTESTHARDWAREDURINGANOMALOUSEPISODESPDF

链接地址:http://www.mydoc123.com/p-1018851.html