1、Lessons Learned Entry: 1211Lesson Info:a71 Lesson Number: 1211a71 Lesson Date: 2002-01-01a71 Submitting Organization: JSCa71 Submitted by: Randy Willhite/ Ronald A. MontagueSubject: Establishing formal handling, packaging, and shipping processes Description of Driving Event: A contractor reported th
2、at there had been some discrepancies with the shipment of the Robotic Work Stations (RWS). The preliminary discrepancies were lack of shock indicators, improper Electrostatic Discharge (ESD) packaging, and improper packaging of the shipment. A formal investigation was conducted to determine the root
3、 cause and corrective actions.Root cause: The following root causes were identified by the investigation: 1. Packaging instructions for the RWS assemblies were not being followed, as noted through review of the documentation which showed the personnel handling RWS assemblies several times (to correc
4、t packaging discrepancies) prior to being accepted by customer. Specifically, the units were not disassembled into components and the cables were not properly coiled and secured. Adequate packaging interface data, information, and description of hardware was not provided in the packaging instruction
5、s. Packaging engineering was not informed of names of authorized personnel for coordinating the activities related to packaging engineering, plus the instructions from the vendor were not provided to the packaging engineer.2. No formal process was established for the organization having custody of t
6、he hardware/software to maintain the Acceptance Data Packages (ADP) for the contractor-furnished equipment (CFE) and government-furnished equipment (GFE) in its possession, although the data required to maintain the ADP was generated in this case.3. The packaging instructions were subject to interpr
7、etation by the user. For example a contractors receiving inspection documented that temperature monitoring equipment and shock recording equipment were not present upon opening the container. Per the contractors packaging procedure, these items are not required in the shipping containers but were as
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS12112002LESSONSLEARNEDESTABLISHINGFORMALHANDLINGPACKAGINGANDSHIPPINGPROCESSESPDF

链接地址:http://www.mydoc123.com/p-1018850.html