REG NASA-LLIS-1210--1999 Lessons Learned - Procedural Control (Deviation from Approved Procedures).pdf
《REG NASA-LLIS-1210--1999 Lessons Learned - Procedural Control (Deviation from Approved Procedures).pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-1210--1999 Lessons Learned - Procedural Control (Deviation from Approved Procedures).pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 1210Lesson Info:a71 Lesson Number: 1210a71 Lesson Date: 1999-08-30a71 Submitting Organization: JSCa71 Submitted by: Jim Kohlbrand/ Ronald A. MontagueSubject: Procedural Control (Deviation from Approved Procedures) Description of Driving Event: During the performance of closed
2、hatch environmental control / life support system (ECLSS) test, Boeing Engineering authorized a deviation to the pre-approved hazardous procedure. The task and procedure to configure the oxygen supply system was to be performed by a subtask document written by a Boeing ground contractor. The subtask
3、 document specifically performed the setup, leak check, oxygen supply and shutdown of oxygen systems. The deviated procedure failed to utilize the steps from the subtask document and could have potentially subjected an in-line flex hose lined with Polytetrafluoroethylene to adiabatic compression cau
4、sed by pneumatic impact. Teflon-lined flex hoses can ignite from pneumatic impacts from tremendous heat build-up. The subtask documents written steps avoid this potential by specific valve configurations and slow system pressurization rates. The written deviation did however; specify the slow delive
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS12101999LESSONSLEARNEDPROCEDURALCONTROLDEVIATIONFROMAPPROVEDPROCEDURESPDF

链接地址:http://www.mydoc123.com/p-1018849.html