REG NASA-LLIS-1063-1998 Lessons Learned International Space Station (ISS) Program Caution and Warning (C&W) Systems Engineering.pdf
《REG NASA-LLIS-1063-1998 Lessons Learned International Space Station (ISS) Program Caution and Warning (C&W) Systems Engineering.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-1063-1998 Lessons Learned International Space Station (ISS) Program Caution and Warning (C&W) Systems Engineering.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 1063Lesson Info:a71 Lesson Number: 1063a71 Lesson Date: 1998-02-01a71 Submitting Organization: HQa71 Submitted by: David M. LengyelSubject: International Space Station (ISS) Program/Caution and Warning (C&W)/Systems Engineering Description of Driving Event: Lack of Systems Eng
2、ineering in ISS Caution and Warning (C&W) System DesignLesson(s) Learned: Although considerable progress has been made during this past year in ISS Caution and Warning (C&W) system design, systems engineering is still not sufficiently evident in the whole spectrum of alarm and warning, situation ass
3、essment, and damage control and repair.Recommendation(s): Initiate a high-priority systems engineering review of the C&W system to define a path for development and implementation of fully integrated alarm, situation assessment, countermeasure functions, and crew actions. Finalize and document C&W s
4、ystem design requirements. Evidence of Recurrence Control Effectiveness: The ISS Program concurs with these concerns and has instituted a C&W Systems Integration Team (CWSIT) to provide direction and management of all C&W development activities, design reviews, C&W display development, event definit
5、ion, and International Partner (IP) integration. Since the last ASAP review, the strength of the CWSIT has grown substantially. Four dedicated engineers were added to support systems engineering, design development, and verification activities. These engineers add to the existing team of mission ope
6、rations, flight crew, Program Office, sub-system representatives, human factors, safety, and independent assessment representatives and meet at least weekly to ensure integration of the C&W system, procedures, and display and controls. Provided by IHSNot for ResaleNo reproduction or networking permi
7、tted without license from IHS-,-,-To finalize system engineering and integration associated with the C&W system design requirements, response procedure development, and display and controls design, the CWSIT conducted a program wide C&W System Integration Review (SIR). The C&W SIR was held between O
8、ctober and December of 1997, and included participants from across the Program and International Partner Communities. This review consisted of two phases, one geared specifically towards SSP 50005, Flight Crew Integration Standards, and another dedicated to identifying integration and design issues
9、within the fault detection, isolation, and recovery display development, audio interfaces, flight rules/procedures, and IP development areas. The C&W review resulted in a total of 35 issues requiring resolution. These issues ranged from editorial comments against the C&W Description Document to the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS10631998LESSONSLEARNEDINTERNATIONALSPACESTATIONISSPROGRAMCAUTIONANDWARNINGCWSYSTEMSENGINEERINGPDF

链接地址:http://www.mydoc123.com/p-1018708.html