REG NASA-LLIS-1058--1999 Lessons Learned - Space Shuttle Program Operations-Processing Workforce.pdf
《REG NASA-LLIS-1058--1999 Lessons Learned - Space Shuttle Program Operations-Processing Workforce.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-1058--1999 Lessons Learned - Space Shuttle Program Operations-Processing Workforce.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 1058Lesson Info:a71 Lesson Number: 1058a71 Lesson Date: 1999-02-01a71 Submitting Organization: HQa71 Submitted by: David M. LengyelSubject: Space Shuttle Program/Operations-Processing/Workforce Description of Driving Event: Loss of Core Competencies Due to Budget and Personnel
2、 Ceiling ConstraintsLesson(s) Learned: Budget and personnel ceiling constraints on the hiring of engineers, scientists, and technical workers are moving NASA toward a crisis of losing the core competencies needed to conduct the Nations space flight and aerospace programs in a safe and effective mann
3、er.Recommendation(s): Provide NASAs human space flight Field Centers, particularly KSC, JSC, and MSFC, with the budgetary resources and administrative flexibility needed to strengthen their human resource capabilities. Evidence of Recurrence Control Effectiveness: NASA concurs with the recommendatio
4、n; and, we fully recognize the near heroic efforts at each of our installations that have brought us within striking distance of our downsizing targets. At the beginning of fiscal year 1993, the NASA employment level was 24,900 FTE. As a result of the March 1993 Executive Order to reduce Federal Civ
5、ilian FTE by 100,000, the NPR recommendations and additional OMB directed cuts in 1994, NASA received an out-year target of 20,906. Additional budget reductions occurred that required us to initiate the Zero Base Review, which was completed in 1995.The ZBR recommended an FY 2000 FTE level of 17,488.
6、 Since that time we have carefully managed an FTE reduction to a planned 18,545 FTE for FY 99 and 17,970 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-for FY00. Our final “go to“ target is now 17,574 FTE for FY 04. Currently 7 of our 10 Centers are
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS10581999LESSONSLEARNEDSPACESHUTTLEPROGRAMOPERATIONSPROCESSINGWORKFORCEPDF

链接地址:http://www.mydoc123.com/p-1018703.html