REG NASA-LLIS-1055--1998 Lessons Learned - International Space Station (ISS) Program Shuttle-Mir Lessons Learned.pdf
《REG NASA-LLIS-1055--1998 Lessons Learned - International Space Station (ISS) Program Shuttle-Mir Lessons Learned.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-1055--1998 Lessons Learned - International Space Station (ISS) Program Shuttle-Mir Lessons Learned.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 1055Lesson Info:a71 Lesson Number: 1055a71 Lesson Date: 1998-02-01a71 Submitting Organization: HQa71 Submitted by: David M. LengyelSubject: International Space Station (ISS) Program/Shuttle-Mir/Lessons Learned Description of Driving Event: Shuttle-Mir Lessons Learned Analysis
2、and ApplicationLesson(s) Learned: The ISS Phase I Shuttle-Mir program has reaffirmed what was learned on Skylab: that a manned space station can be surprisingly resilient in emergency situations. Much has been learned from the operations on Mir to date and much more may be learned from continued ana
3、lysis of joint operations on Mir.Recommendation(s): The ISS team should continue to examine the Shuttle-Mir program carefully for examples from which ISS operations can benefit and to provide policies and procedures to implement effective action should similar events occur on the ISS. The effort sho
4、uld be expanded beyond Mir to focus as well on possible weaknesses in the ISS design and operations. ISS should assemble a special team including, persons with system-level perspectives as well as with design, operations, and human factors experience, to address these issues. Evidence of Recurrence
5、Control Effectiveness: The ISS Program (ISSP) has benefited greatly from the Phase I Program experiences in the areas of operational feasibility and validation, procedures development and logistics manifesting, and in some cases, hardware modifications. A more rigorous process for evaluating Shuttle
6、/Mir lessons learned has been implemented and will Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-assure that ISS realizes maximum benefit from Shuttle/Mir lessons learned. Phase I management screens and prioritizes lessons learned from each Shuttle
7、/Mir flight increment to document significant and applicable lessons to ISS. These lessons are thoroughly reviewed by ISS Lessons Learned Screening Panel. For each lesson, actionee(s) are assigned to analyze ISS applicability and possible implementation or rationale for nonimplementation. The Lesson
8、s Learned Screening Panel and ISSP management will assure that the proposed implementation is appropriate. This screening process includes representatives from numerous organizations to ensure that all these issues are adequately addressed. This same process is used to incorporate lessons learned wh
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS10551998LESSONSLEARNEDINTERNATIONALSPACESTATIONISSPROGRAMSHUTTLEMIRLESSONSLEARNEDPDF

链接地址:http://www.mydoc123.com/p-1018700.html