1、Lessons Learned Entry: 1041Lesson Info:a71 Lesson Number: 1041a71 Lesson Date: 2001-10-15a71 Submitting Organization: MSFCa71 Submitted by: Robert B. GossSubject: Gravity Probe-B Nitrogen Contamination Mishap Investigation Final Report Description of Driving Event: At approximately 10:30 a.m. on Aug
2、ust 26, 2001, gaseous nitrogen (GN2) was erroneously connected to the Gravity Probe-B (GP-B) guard tank vent line as the GP-B Science Payload (Figure 1) was readied for transport from Stanford University (SU) to Lockheed Martin (LM) in Palo Alto, California. At approximately 2:30 p.m. (after the GP-
3、B Science Payload arrived at LM), the error was recognized and the GN2 was disconnected. Gaseous helium (GHe) was the intended gas to be connected instead of GN2. Since the guard tank is at a much lower temperature than the freezing point of GN2, concerns arose over the possible detrimental effects
4、of frozen nitrogen (N2) in the vent line and/or the guard tank itself.The purpose of the move was to transfer the GP-B Science Payload from SU to LM for later integration with the spacecraft. The move was uneventful except for the discovery of the connection of the incorrect gas to the guard tank. T
5、he immediate cause of the incident was the inadvertent connection of the GN2 to the guard tank instead of utilizing the required GHe.A procedure to check the guard tank vent line impedance was executed on September 15, 2001. The data showed significant but not total blockage of the vent line with fr
6、ozen N2. The procedure added heat to the guard tank and flowed gas through the vent line until there was no further indication of N2 in the tank or line. There is no reason to believe that damage to the hardware had occurred since the vent line was only partially blocked. There was an impact on the
7、schedule due to the recovery time, and there will be an associated cost based on the schedule impact.Lesson(s) Learned: 1. All operations and modifications to flight hardware and its interfacing GSE should always have comprehensive and well reviewed written procedures.Provided by IHSNot for ResaleNo
8、 reproduction or networking permitted without license from IHS-,-,-2. Schedule pressure can cause even top performers to make mistakes and/or take short cuts.3. Gas K-bottles or other sources of gases should be readily identifiable in safety critical and contamination critical programs.4. Gases shou
9、ld be positively verified in safety critical and contamination critical programs.5. Gases should be segregated by species. Controls should be in place to avoid inadvertently placing a different gas in a rack or storage location designated for another species of gas.6. All personnel supervising or wr
10、iting procedures for transportation activities should be trained on DOT HAZMAT regulations.7. In addition to the need for a positive identification of gases, the traceability and accountability must be maintained to ensure that no changes have occurred.8. Lessons learned should be widely disseminate
11、d and appropriate follow-through on appropriate actions from the lessons must occur.9. It is important to maintain configuration control on GSE that interfaces with flight hardware and diligently verify its configuration and functions, especially if repairs or modifications are being incorporated.10
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS10412001LESSONSLEARNEDGRAVITYPROBEBNITROGENCONTAMINATIONMISHAPINVESTIGATIONFINALREPORTPDF

链接地址:http://www.mydoc123.com/p-1018686.html