1、Lessons Learned Entry: 0923Lesson Info:a71 Lesson Number: 0923a71 Lesson Date: 2000-11-28a71 Submitting Organization: KSCa71 Submitted by: Charles G. StevensonSubject: Quick Release Pin Causes Shuttle Launch Scrub Description of Driving Event: On 10 October 2000, during the STS-92 launch countdown T
2、-3 hour Final Inspection, a 4-inch long and 3/16-inch diameter “T-handle“ Quick Release Pin (QRP) and tether were discovered laying between the External Tank (ET) LO2 Feedline and the in-board Feedline Support Bracket.Provided by IHSNot for ResaleNo reproduction or networking permitted without licen
3、se from IHS-,-,-Quick Release Pin (QRP) with tether laying between ET LO2 Feedline and In-board Feedline Support BracketPhoto 1 - Quick Release Pin found on inboard side of the ET LO2 Feedline support bracketThe inspection team was unable to retrieve the QRP. The launch team was notified and launch
4、was scrubbed at T-20 minutes. Removal of the QRP and tether was completed at 0226 hours on 11 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-October 2000. The QRP had only caused minor damage to the LO2 Feedline Support Bracket foam insulation. STS-
5、92, the 100th Space Shuttle Mission, was launched successfully at 1917 hours on 11 October 2000.During a follow-up investigative walkdowns of the Vehicle Assembly Building (VAB) and Pad A, a VAB High Bay (HB) 3 “B Roof“ kickplate attachment for platform F-9 was discovered to be missing a 3/16-inch d
6、iameter QRP. The F-9 platform is located 73.6 feet directly above the found QRPs resting location on the LO2 Feedline Support Bracket.Removed QRP w/tether evidenceProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Photo 2 - 2VAB HB-3 Integration Cell Pl
7、atform configuration in relation to pin locationThe kickplate was routed to the Malfunction Lab on 16 October 2000 and the Lab confirmed a match between the paint over spray found on the QRPs T-handle and the paint on the kickplate.The Investigative Board concluded that the QRP most likely fell just
8、 prior to or during the “B Roof“ Level F-9 platform retraction, which occurred approximately 3 hours after the pre-rollout inspection of the D-2 Level platform. The parallel task sequencing, of the platform inspections and retractions, was not constrained by current procedures.Lesson(s) Learned: 1.
9、Maintenance practices, for the proper use, stowage, inspection and repair of QRPs and tethers, were not conveyed, monitored, or reinforced.2. Previously assigned QRP and tether corrective actions were not implemented.3. The VAB HB-3 “B Roof“ F-9 platform modifications final acceptance inspection fai
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS09232000LESSONSLEARNEDQUICKRELEASEPINCAUSESSHUTTLELAUNCHSCRUBPDF

链接地址:http://www.mydoc123.com/p-1018568.html