REG NASA-LLIS-0918-2000 Lessons Learned Evolution of Mission Requirements for Support Equipment.pdf
《REG NASA-LLIS-0918-2000 Lessons Learned Evolution of Mission Requirements for Support Equipment.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-0918-2000 Lessons Learned Evolution of Mission Requirements for Support Equipment.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 0918Lesson Info:a71 Lesson Number: 0918a71 Lesson Date: 2000-10-17a71 Submitting Organization: JSCa71 Submitted by: Ronald A. MontagueSubject: Evolution of Mission Requirements for Support Equipment Description of Driving Event: During installation of the Thermal Micrometeorit
2、e Guard (TMG), the Short Extravehicular Mobility Unit (EMU) #3018 fell from the EMU ground test fixture (EGTF) to the floor. The primary cause of the mishap was that the EGTF was not used in a manner for which it was designed or assessed. The EGTF was designed and certified for 4-pin operations. The
3、 design of the TMG required a 3-pin operation during installation (one pin had to be removed.) The existing procedure for installation of the TMG on the SEMU did not address how the SEMU is to be handled or positioned, nor was there a procedure for the use of the EGTF. During this particular mishap,
4、 the TMG installation was being conducted with the front of the SEMU down. With the front of the SEMU facing up, this type of mishap would probably never occur because of the design of the pin receptacles. Proper procedures for installation of the TMG with the SEMU in an EGTF could have prevented th
5、is incident. Even thought this potential for mishap has existed since the EGTF was introduced in 1983, its presence was either recognized and not documented in a hazard analysis or not recognized at all. No formal training plan or objectives exist for personnel who handle flight equipment in the EMU
6、 laboratory. While OJT apprenticeship was implemented for these operations, there are neither measurable requirements nor documentation to support successful completion of training.Lesson(s) Learned: Equipment at all phases of processing and buildup must be used in the manner it was designed and tho
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS09182000LESSONSLEARNEDEVOLUTIONOFMISSIONREQUIREMENTSFORSUPPORTEQUIPMENTPDF

链接地址:http://www.mydoc123.com/p-1018563.html