REG NASA-LLIS-0917-2000 Lessons Learned Inadequate Project Line Interaction Throughout Mars Climate Orbiter-s Project Life Cycle (1999).pdf
《REG NASA-LLIS-0917-2000 Lessons Learned Inadequate Project Line Interaction Throughout Mars Climate Orbiter-s Project Life Cycle (1999).pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-0917-2000 Lessons Learned Inadequate Project Line Interaction Throughout Mars Climate Orbiter-s Project Life Cycle (1999).pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 0917Lesson Info:a71 Lesson Number: 0917a71 Lesson Date: 2000-04-14a71 Submitting Organization: JPLa71 Submitted by: D. OberhettingerSubject: Inadequate Project/Line Interaction Throughout Mars Climate Orbiters Project Life Cycle (1999) Abstract: MCOs emphasis on lean, fast res
2、ponding, project teams led to less oversight by the technical line organizations that might have detected the omissions and errors that led to mission loss. Early in the formulation phase of each project, appropriate individual project/line organization work agreements should be established and impl
3、emented throughout the project life cycle. Appropriate technical expertise external to flight project teams should be available to the projects for problem solving and peer review. Employees should be trained on all aspects of project/line organization interactions.Description of Driving Event: The
4、JPL requirement for concurrent development of many small spaceflight missions has led to the emergence of lean, fast responding project teams. To accommodate these many projects, JPL has created a process called “soft projectization“ (Reference 3) which tends to blur the roles and responsibilities o
5、f the traditional JPL matrixed project/line organizations. This process can result in far less oversight by the technical line organizations. In addition, constrained project resources and schedule pressures may lead to problems being quickly prioritized and dispositioned without recourse to JPL exp
6、ertise external to these teams. This lack of interaction with management and technical experts within JPL line organizations increases the risk of omissions and the potential for errors. For the Mars Climate Orbiter (MCO) mission operations, the timely involvement of the highly experienced experts i
7、n the JPL navigation line organization would likely have revealed the erroneous delta-Vs generated by the software that compensated for small forces effects. (These errors were identified by the JPL and NASA Review Boards as the direct result of a file incompatibility that was the root cause of the
8、MCO mission failure (References 1 and 2). Such involvement would at least have recognized the large targeting uncertainty, which could have been corrected prior to Mars Encounter. In addition, the “soft projectization“ approach led to the Project perception that line Provided by IHSNot for ResaleNo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS09172000LESSONSLEARNEDINADEQUATEPROJECTLINEINTERACTIONTHROUGHOUTMARSCLIMATEORBITERSPROJECTLIFECYCLE1999PDF

链接地址:http://www.mydoc123.com/p-1018562.html