REG NASA-LLIS-0859-1999 Lessons Learned Facilities Complete Contract Specs Requirements.pdf
《REG NASA-LLIS-0859-1999 Lessons Learned Facilities Complete Contract Specs Requirements.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-0859-1999 Lessons Learned Facilities Complete Contract Specs Requirements.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 0859Lesson Info:a71 Lesson Number: 0859a71 Lesson Date: 1999-08-23a71 Submitting Organization: GRCa71 Submitted by: Joe MorrisSubject: Facilities, Complete Contract Specs. Requirements Description of Driving Event: A water line coming into a building was being increased in siz
2、e to accommodate a new building sprinkler system. The excavation was done, but the compaction that should have been done was not.The specification of backfilling was not part of the contract documents.Lesson(s) Learned: There is more to filling up a hole that just throwing the dirt back into it. Com
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS08591999LESSONSLEARNEDFACILITIESCOMPLETECONTRACTSPECSREQUIREMENTSPDF

链接地址:http://www.mydoc123.com/p-1018505.html