1、Best Practices Entry: Best Practice Info:a71 Committee Approval Date: 2000-03-30a71 Center Point of Contact: GSFCa71 Submitted by: Wilson HarkinsSubject: End-To-End Compatibility and Mission Simulation Testing Practice: End-to-End Compatibility and Mission Simulation testing are conducted on all por
2、tions of the Ground Data Systems (GDS). These tests are performed to fully demonstrate the operational compatibility and the ability of the entire system to perform as expected during the flight mission.Programs that Certify Usage: This practice has been used on all flight programs managed by the Go
3、ddard Space Flight Center (GSFC). They are required to use this practice.Center to Contact for Information: GSFCImplementation Method: This Lesson Learned is based on Reliability Practice Number PT-TE-1437 from NASA Technical Memorandum 4322A, NASA Reliability Preferred Practices for Design and Test
4、.Benefits:This testing significantly enhances flight reliability by ensuring that all portions of the flight operational system work together as expected. This includes the proper flow of data to the end users.Implementation Method:Provided by IHSNot for ResaleNo reproduction or networking permitted
5、 without license from IHS-,-,-The GSFC Mission Operations and Data Systems Directorate (MO&DSD) develops, maintains, and operates a worldwide Ground Data System (GDS) to support a wide range of flight missions. Various organizational units within the MO&DSD such as branches, sections, and mission re
6、adiness test teams collaborate with the Flight Project and the Flight Assurance Directorate in planning and performing a wide range of mission readiness testing. The purpose of this readiness testing is to verify the performance and to demonstrate the readiness of the integrated GDS to support speci
7、fic flight missions. This practice is implemented by the MO&DSD in the following three basic phases.Phase A: Acceptance and Interface Testing of Individual Elements of GDSAcceptance and Interface testing is performed on each element of the GDS for each flight mission. This testing is particularly ap
8、plicable to those hardware and software elements in the GDS that have been updated, modified, or added to meet specific requirements of a mission.The acceptance and interface testing is followed by a formal Project Integration and Test Program. The Project Integration and Test Program verifies that
9、the GDS can meet all of the project mission support requirements and documents the systems operational readiness. After all requirements have been verified, all discrepancies have been resolved, and all corrective actions have been completed, the verification process through Integration and Test is
10、complete. The GDS is now ready to participate in Phase B, Compatibility Testing.Phase B: Compatibility TestingCompatibility testing is conducted on all portions of the operational system including the payload, the operational software, and the ground systems. The ground systems include the Space and
11、 Ground Networks, the Mission Operations Control Center (MOCC), and the data processing facilities. When the mission scenario calls for electrical operation of the payload aboard the STS or in conjunction with it, compatibility of the operational system is demonstrated with the use of the appropriat
12、e elements of the STS, such as the Orbiter Payload Data Handling System and the Mission Control Center. After completion of compatibility testing, the GDS is ready to participate in Phase C, Mission Readiness and Mission Simulations Testing.Phase C: Mission Readiness And Mission Simulation TestingMi
13、ssion Readiness Testing is conducted to verify that system design specifications are being routinely met, to ascertain the level of operational proficiency being maintained throughout the networks, and to evaluate the networks abilities to meet or exceed design specifications in response to project
14、requirements. An evaluation phase follows in which all Discrepancy Reports (DRs) are reviewed by a DR Review Board.Mission Simulation Testing includes data flow tests performed on the total system in a realistic mission timeline. When practical, external stimulus of the spacecraft instruments and at
15、titude control Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-sensors are used.Mission Readiness and Mission Simulation Testing is carried out in accordance with formal test plans prepared and approved by the MO&DSD with concurrence by the flight pr
16、ojects. These test plans define test coordination, system requirements, test procedures, problem resolution procedures, and reporting requirements. In order to ensure an integrated testing effort, testing and planning is coordinated through a Mission Readiness Test Team comprised of project and MO&D
17、SD development, test, and operations representatives.Test Facilities and Systems Used for Compatibility and Simulations TestingThis section on test facilities and systems used for compatibility and simulation testing provides a description of the major elements of the GDS and how they are used in th
18、ese test programs.The Simulations Operations Center (SOC) located at the GSFC provides support and test tools that can emulate the spacecraft, the MOCC, the Network Control Center, and the Ground and Space Networks. System evaluations and validation test and simulation programs are also conducted to
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS07262000LESSONSLEARNEDENDTOENDCOMPATIBILITYANDMISSIONSIMULATIONTESTINGPDF

链接地址:http://www.mydoc123.com/p-1018372.html