1、Lessons Learned Entry: 0196Lesson Info:a71 Lesson Number: 0196a71 Lesson Date: 1992-11-04a71 Submitting Organization: KSCa71 Submitted by: Lisa L. MusgraveSubject: Launch Processing Workload Description of Driving Event: An unusually high workload at the time of the STS 51-L ground processing caused
2、 manpower limitations, and some areas where particular skills were required, were in short supply. The major cause was the necessity of processing four orbiters, while also completing the launch complex 39B activation. Original planning called for OV-103 to be shipped to Vandenberg AFB in September
3、1985. The shipment was delayed in order to fly OV-103 on an additional flight from KSC. The need to delay the movement of OV-103, in turn, was caused by major work on OV-102 that had traveled to KSC. This resulted in a long processing flow prior to the STS 61-C launch. Problems in processing both or
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS01961992LESSONSLEARNEDLAUNCHPROCESSINGWORKLOADPDF

链接地址:http://www.mydoc123.com/p-1017847.html