    AASHTO HB-17 DIVISION II SEC 2-2002 Division II Construction - Removal of Existing Structures《现有结构的移除》.pdf

    • 资源ID:417586       资源大小:163.69KB        全文页数:2页
    • 资源格式: PDF        下载积分:2000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要2000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    AASHTO HB-17 DIVISION II SEC 2-2002 Division II Construction - Removal of Existing Structures《现有结构的移除》.pdf

    1、Section 2 REMOVAL OF EXISTING STRUCTURES 2.1 DESCRIPTION This work shall consist of the removal, wholly or in part, and satisfactory disposal, or salvage, of all bridges, retaining walls and other major structures which are des- ignated on the plans or in the special provisions to be re- moved. The

    2、work also includes, unless otherwise speci- fied, any necessary excavation and the backfilling of trenches, holes or pits that result from such removal. 2.2 WORKING DRAWINGS Working drawings showing methods and sequence of removal shall be prepared: (1) when structures or portions of structure are s

    3、pecified to be removed and salvaged, (2) when removal operations will be performed over or adja- cent to public traffic or railroad property, or (3) when called for by the plans or special provisions. At least 10 days prior to the proposed start of removal operations, the working drawings shall be s

    4、ubmitted to the Engineer for approval. Removal work shall not begin until the draw- ings have been approved. Such approval shall not relieve the Contractor of any responsibility under the contract for the successful completion of the work. When salvage is required, the drawings shall clearly indicat

    5、e the markings proposed to designate individual segments of the structure. 2.3 CONSTRUCTION 2.3.1 General Except for utilities and other items that the Engineer may direct the Contractor to leave intact, the Contractor shall raze, remove and dispose of each structure, or por- tion of structure, desi

    6、gnated to be removed. All concrete and other foundations shall be removed to a depth of at least 2 feet below ground elevation or 3 feet below sub- grade elevation, whichever is lower. Unless otherwise specified, the Contractor has the option to either pull piles or cut them off at a point not less

    7、than 2 feet below ground line. Cavities left from structure removal shall be back- filled to the level of the surrounding ground and, if within the area of roadway construction, shall be compacted to meet the requirements of the contract for embankment. Explosives shall not be used except at locatio

    8、ns and under conditions cited by the project specifications. All blasting shall be completed before the placement of new work. 2.3.2 Salvage Materials which are designated to be salvaged under the contract, for reuse in the project or for future use by the Department, shall remain the property of th

    9、e Depart- ment and shall be carefully removed in transportable sec- tions and stockpiled near the site at a location designated by the Engineer. The Contractor shall restore or replace damaged or destroyed material without additional com- pensation. Rivets and bolts that must be removed from steel s

    10、truc- tures to be salvaged shall be removed by cutting the heads with a chisel, then punched or drilled from the hole, or by a method that will not injure the members for reuse and will meet the approval of the Engineer. All members or sections of steel structures shall be match-marked with paint in

    11、 accordance with the diagram or plan approved by the Engineer prior to dismantling. All bolts and nails shall be removed from lumber deemed salvageable by the Engineer as part of the salvage of timber structures. 2.3.3 Partial Removal of Structures When structures are to be widened or modified and o

    12、nly portions of the existing structure are to be removed, these portions shall be removed in such a manner as to leave the remaining structure undamaged and in proper condition for the use contemplated. Methods involving the use of blasting or wrecking balls shall not be used within any span or pier

    13、 unless the entire span or pier is to be removed. Any damage to the portions remaining in ser- vice shall be repaired by the Contractor at his or her ex- pense. 48 1 482 HIGHWAY BRIDGES 2.3.3 Before beginning concrete removal operations involv- ing the removal of a portion of a monolithic concrete e

    14、lement, a saw cut approximately 1-inch deep shall be made to a true line along the limits of removal on all faces of the element which will be visible in the completed work. Old concrete shall be carefully removed to the lines designated by drilling, chipping, or other methods ap- proved by the Engi

    15、neer. The surfaces presented as a re- sult of this removal shall be reasonably true and even, with sharp straight corners that will permit a neat and workmanlike joint with the new construction or be satis- factory for the purpose intended. Where existing rein- forcing bars are to extend from the ex

    16、isting structure into new construction, the concrete shall be removed so as to leave the projecting bars clean and undamaged. Where projecting bars are not to extend into the new construc- tion, they shall be cut off flush with the surface of the old concrete. During full depth removal of deck concr

    17、ete over steel beams or girders which are to remain in place, the Con- tractor shall exercise care so as not to notch, gouge, or dis- tort the top flanges with jackhammers or other tools. Any damage shall be repaired at the Contractors expense. Re- pairs will be done as directed by the Engineer and

    18、may in- clude grinding, welding, heat straightening, or member replacement, depending on the location and severity of the damage. 2.3.4 Disposal Any material not designated for salvage will belong to the Contractor. Except as provided herein, the Contractor shall store or dispose of such material ou

    19、tside of the right of way. If the material is disposed of on private property, the Contractor shall secure written permission from the property owner and shall furnish a copy of each agree- ment to the Engineer. Waste materials may be disposed of in Department-owned sites when such sites are describ

    20、ed in the special provisions. Unless otherwise provided in the special provisions, removed concrete may be buried in adjacent embank- ments, provided it is broken into pieces which can be readily handled and incorporated into embankments and is placed at a depth of not less than 3 feet below finishe

    21、d grade and slope lines. The removed concrete shall not be buried in areas where piling is to be placed or within 10 feet of trees, pipelines, poles, buildings, or other perma- nent objects or stuctures, unless permitted by the Engi- neer. Removed concrete may also be disposed of outside the right-o

    22、f-way as provided above. 2.4 MEASUREMENT AND PAYMENT The work as prescribed for by this item shall be mea- sured as each individual structure, or portion of a struc- ture, to be removed. Payment will be made on the basis of the lump sum bid price for the removal of each structure, or portion of stru

    23、cture, as specified. The above prices and payments shall be full compen- sation for all work, labor, tools, equipment, excavation, backfilling, materials, and incidentals necessary to com- plete the work, including salvaging materials not to be reused in the project when such salvaging is specified

    24、and not otherwise paid for. Full compensation for removing and salvaging materi- als that are to be reused in the project shall be considered as included in the contract prices paid for reconstructing, relocating or resetting the items involved, or in such other contract pay items that may be designated in the contract, and no additional compensation will be allowed therefore.


    注意事项

    本文(AASHTO HB-17 DIVISION II SEC 2-2002 Division II Construction - Removal of Existing Structures《现有结构的移除》.pdf)为本站会员(appealoxygen216)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开