欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PPT文档下载
    分享到微信 分享到微博 分享到QQ空间

    Boiler Safety.ppt

    • 资源ID:379056       资源大小:57.50KB        全文页数:16页
    • 资源格式: PPT        下载积分:2000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要2000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    Boiler Safety.ppt

    1、,Boiler Safety,Safety Appurtenances In Boiler,Pressure gauge & Test connectionSafety Valves (Drum & Super-heater)Blow down valveDrum Level Water Gauge GlassesStop Valve in Steam lineStop & Check Valves in Feed Line,Necessity of Safety valve,It prevents the boiler pressure from going above a safe pre

    2、-determined pressure, by opening, to allow the excess steam to escape into the atmosphere when the set point is reached. This guards against a possible explosion from excessive pressure.Each Boiler must have one S.V, the minimum size being a inch valve for miniature boilers & a inch valve for others

    3、. A Boiler with more than 500 Sq.ft of heating surface & an electric boiler with a power input of over 500 KW should have two or more Safety valves.,Capacity of Safety valve,In any case , SV capacity must be such as to discharge all the steam the boiler can generate without allowing pressure to rise

    4、 more than 6 % above the highest pressure at which any valve is set & in no case more than 6 % above the maximum allowable working pressure.All the Safety valves used on Steam boilers must be of Direct Spring Loaded type.,Definition of Safety Relief valve,It is an automatic pressure-relieving device

    5、 actuated by the pressure upstream of the valve & which opens by pop action, with further increase in lift of the valve, when pressure increases over popping pressure.It thus combines the feature of pop action & further lift with pressure increase.,Terminology of Safety Relief valves,Blow down :It i

    6、s the difference between the opening & closing pressure of the Safety valve.Ex- A safety valve that pops at 200psi & seatsat 195 psi has a blow down of 5 psi.Code rule for determining SV relieving capacity :SV capacity on a boiler must be such that the SV or valves willdischarge all the steam that c

    7、an be generated by the boiler (this is assumed to be the max. firing rate) without allowing the pressure to rise more than 6 % above the highest pressure at which any valve is set & in no case more than 6 % above the max allowable pressure.,ASME markings required on High Pressure Safety Valves:,Name

    8、 or identifying trade mark of manufacturerManufacturers design or type numberSize in inches, Seat Diameter in inches( i.e the pipe size of valve inlet )Pressure in lbs/ sq.ft or Kg / sq.cm (Steam pressure at which it is to blow)Blow down in Kgs or lbs ( BD is the difference between the opening & clo

    9、sing pressure )Capacity in lbs / hr or kg / hrCapacity lift in inches. It is the distance the valve disc rises under the action of steam when the valve is blowing under a pressure of 3 % above the set pressure.,Number of Safety Valves requirement,Each Boiler requires at least one SV, but if the heat

    10、ing surface exceeds 500 Sq.ft, the boiler must have two or more Safety relief valves.When not more than two valves of different sizes are mounted singly on the boiler, the smaller valve must not be les than 50 % in relieving capacity of the larger valve.Every super-heater attached to a boiler with n

    11、o intervening valves between the super-heater & boiler requires one or more safety valves on the super-heater outlet header.With no intervening stop valves between the super-heater & boiler, the capacity of the safety valves on the super-heater may be included in the total required for the boiler, p

    12、rovided the safety valve capacity in the boiler is at least 75 % of the aggregate SV capacity required for the Boiler. Ex- If a boilers steaming capacity is 100 tons, a minimum of two valves are required on Boiler with a total relieving capacity of 75 % of (100 Tons) I.e 75 tons. The super-heater wo

    13、uld then require a SV with a capacity of (100 75) tonsi.e 25 Tons.,Important Points,Heating Surface :That side of the boiler surface exposed to the products of combustion, exclusive of super-heating surface.The areas to be considered for this purpose are tubes, fire-boxes, shells, tube sheets & the

    14、projected area of the headers.Sequence of Safety valves Blowing:The super-heater safety valves should always be set at a lower pressure than the drum safety valve ,so as to ensure steam flow through the super-heater at all times. If the drum safety valve blows first, the super-heater could be starve

    15、d of cooling steam, leading to possible super-heater tube overheating & rupture.,Important Points,Re-heater Safety valves :The capacity of re-heater safety valves can not be included in the total safety valve capacity required for the boiler & super-heater.The relieving capacity of re-heater safety

    16、valve must not be less than 15 % of the required total on the header. The total capacity on the re-heater must be at least equal to the maximum steam flow for which the re-heater is designed . One SV must be on the re-heater outlet.Installation of Safety valves:Every safety valve shall be connected

    17、so as to stand in an up-right position with spindle vertical.,CASE STUDY OF A MAJOR DISASTER IN THERMAL STATION,Explosion in Boiler of Unit No.1 of Bongaigaon TPS ( 4 x 60 MW) on 23.6.91Bongaigaon TPS consists of 4 units of 60 MW each commissioned during the period 1981-1986. A severe explosion was

    18、reported on the Boiler of Unit No.1 on 23.6.1991 at 5.15AM a voltage dip was observed at that time and it was learnt that the Unit No.1 had tripped. It was noticed that there was no AC or DC supply available in the Unit 1 Control Room. The reserve AC supply did not come automatically. The Boiler Att

    19、endant was instructed to close the oil supply valves to cut off the oil supply to the boiler. At the time of the incidence , one oil gun at CD level and three at AB level were in operation. The attendant put closed the AB level oil guns and while going to close the CD level oil gun the boiler explod

    20、ed. The Operator ran under a state of shock and fell down from 12 metre to 8 metre level Another Boiler Operator was found unconscious laden with dust and coal on the 12 metre level near the boiler . DG set was started manually , in spite of the fact that station AC supply was available . The 6.6 Kv

    21、 switchgear was reported to be under water making it difficult to approach; However all the 6.6 Kv breakers were manually tripped and the reserve supply was established. contd.,CASE STUDY OF A MAJOR DISASTER IN THERMAL STATION,Observations:During the investigation it was found: Explosion residue tak

    22、en out from the furnace bottom was very rich inun-burnt oil and pulverized coal. Furnace wall from inside had oil sticking to the surface. Boiler operating floor was full of coal / ash/ dust and even the local BMS panel was fully covered with dust. BMS panel was never used for operating the trip val

    23、ves Flame scanners were inoperative for many years and also the igniters wereNon-functional. Oil used to be ignited manually by Flame Torch (Mashal ). Whenever the unit tripped the cause of tripping was never analyzed. Contd ,SOME MAJOR DISASTER IN THERMAL STATIONS,Following damages had taken place

    24、:i) Boiler furnace corners 1 & 4 got completely ripped open above CD elevation up to thefurnace top.ii) Front and left water walls got bulged outward and the buck-stays were damaged.iii) Economiser duct from the boiler bank outlet up to the economiser opened out and had blown .Contd ,CASE STUDY OF A

    25、 MAJOR DISASTER IN THERMAL STATION,Causes of the explosion: i) Flame failure took place prior to boiler trip.ii) Flame failure was not detected since the flame scanners were not in operation.iii) Due to sudden grid fluctuation, the boiler tripped on loss of air flow protection.iv) The generator brea

    26、ker and UAT breaker tripped. v) There was no AC or DC supply available on the generator board. The automatic change over to 6.6 Kv reserve supply from station did not take place. This resulted in failure of supply in 6.6 Kv 1A bus. Since the battery was not available, the DCsupply had failed resulti

    27、ng in non-operation of all the controls.vi) Situation further aggravated inside the furnace since the draft fans were also not available. vii) The fuel oil supply continued to go inside the furnace since the fuel oil pumps were on station supply and the oil trip valves could not be closed manually c

    28、ausing boiler explosion.,CASE STUDY OF A MAJOR DISASTER IN THERMAL STATION,Suggested remedial measures:i) Boiler local BMS panel should be made fully operational.ii) Practice of operating the fuel trip valves by shorting of the contacts should bedispensed with. iii) All the boiler auto controls shou

    29、ld be made functional and must be maintained.iv) The DC battery and other connected system should be maintained in perfect condition.v) All the interlocks of auxiliaries like FD fans, ID fans, etc should be made operative. Theflame scanners and igniters are also to be made operational. contd,CASE ST

    30、UDY OF A MAJOR DISASTER IN THERMAL STATION,Suggested remedial measures:vi) The use of oil should be discontinued beyond 40% unit load and stable operation should be achieved with coal firing after 40% load.vii) A systematic preventive maintenance procedure for various equipment should be evolved.viii) Procedure of Annual inspection and overhaul of boiler as per Indian Boiler Regulationshould be regularly followed.ix) O&M staff should be augmented and adequate number of trained personnel should beposted for operation and maintenance.,


    注意事项

    本文(Boiler Safety.ppt)为本站会员(proposalcash356)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开