欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-6796-2012 Lessons Learned TRaiNED Deployment Failure Was Traced to Design Flaws and Process Escapes [Export Version].pdf

    • 资源ID:1019552       资源大小:315KB        全文页数:4页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-6796-2012 Lessons Learned TRaiNED Deployment Failure Was Traced to Design Flaws and Process Escapes [Export Version].pdf

    1、 Public Lessons Learned Entry: 6796 Lesson Info: Lesson Number: 6796 Lesson Date: 2012-08-28 Submitting Organization: JPL Submitted by: David Oberhettinger Subject: TRaiNED Deployment Failure Was Traced to Design Flaws and Process Escapes Export Version Abstract: A payload door failed to deploy on a

    2、 sounding rocket mission intended to advance the technology for autonomous navigation. In addition to several design flaws, an anomaly investigation board identified several process escapes. Several rigorous mechanical design practices are recommended, along with processes to verify that the specifi

    3、ed materials are used, wiring harnesses are not mis-mated, and key knowledge is retained upon personnel rotations. Description of Driving Event: The Terrain-Relative Navigation and Employee Development (TRaiNED) project was a Class D (i.e., low cost, high risk) mission employing a sounding rocket to

    4、 capture exoatmospheric and low-altitude imagery. Using the imagery to refine navigation algorithms, the payload developed by the NASA/Caltech Jet Propulsion Laboratory (JPL) for the 41.087 mission (Dr. Martin Heyne, Principal Investigator) was intended to advance the technology for autonomous terra

    5、in-relative navigation and hazard detection, providing aerial and surface access to key sites in the solar system. The launch of the 41.087/Heyne Terrier-Improved Orion sounding rocket (Figure 1) from White Sands Missile Range (WSMR) on December 6, 2010 was nominal, but no data was received from the

    6、 JPL-furnished cameras located in the exoatmospheric section. The camera field of view was blocked by a blow-off door, which did not release early in the flight as planned. The sounding rocket for the “Heyne“ mission employed a legacy design in which the door (Figure 2) is held in place by tabs and

    7、by a single brass screw that is severed in flight by a pyrotechnic guillotine cutter. Rotational acceleration forces then act on the released door, which rotates away from the payload. . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Figure 1. Heyne

    8、 mission sounding rocket just prior to flight at WSMR Figure 2. Close-up of the sounding rocket, with an Exoatmospheric Camera Door clearly visible on the left Review of telemetry records, inspection of the remaining door hardware, and material analysis, established that the blow-off door release (F

    9、igure 3) was actuated at the proper time in flight, but the deployment screw was only partially severed by the cutter (Reference (1). A more common industry practice is to use high strength fasteners with an extremely high pre-load, so that the cutter only need weaken the screw to the point that the

    10、 tensile load induces failure in the remainder of the material. Figure 3. A detailed diagram of the blow-off door mechanism has been redacted for International Traffic in Arms Regulations (ITAR) compliance. Although the Heyne mission failed to capture camera imagery at 120 km altitude from its exoat

    11、mospheric experiment section, the JPL payload did succeed in capturing the requisite descent imagery. References: 1. “41.087/Heyne Terrier-Orion Anomaly Investigation Board Final Report,“ NASA Sounding Rocket Program Office, May 10, 2011. 2. Donald R. Sevilla, e-mail with subject “Re: TRaiNED AIB Fi

    12、nal Report - Bolt Cutter Failure,” July 7, 2011. 3. “Mate/Demate, Verify, and Document Connectors One-at-a-Time,“ NASA Lesson Learned No. 1619, NASA Engineering Network, August 8, 2005. Portions of the following text have been redacted, as indicated, for ITAR compliance. “U.S. Persons“ may obtain a

    13、copy of the complete lesson learned by contacting the JPL Office of the Chief Engineer (David Oberhettinger at davidonasa.gov). Lesson(s) Learned: In-flight failures are not unexpected on low cost, high risk, projects like the Phaeton projects that provide a learning experience for junior engineers.

    14、 Nevertheless, the following TRaiNED lessons learned are applicable to any class of flight project: 1. The anomaly report for the Heyne mission (Reference (1) identified several design flaws. This paragraph, which describes inherent weaknesses with the design of the door assembly for the Heyne missi

    15、on, has been redacted for ITAR compliance. 2. The material traceability and control processes for the fabrication and assembly of critical flight hardware were deficient. This paragraph, which explains the flight hardware material traceability and control process deficiencies, has been redacted for

    16、ITAR compliance. 3. The wiring harnesses for the two pyrotechnics were indistinguishable and could have been inadvertently swapped. This paragraph, which reports a hardware feature that could result in mis-wiring of pyros, has been redacted for ITAR compliance. 4. Long delays in missions that interr

    17、upt the typical mission timelines can be a complicating factor in both pre-launch mission assurance and post-flight collection of information. This paragraph, which discusses the effect of changes in payload team staffing upon proper disassembly of the blow-off door, has been redacted for ITAR compl

    18、iance. Recommendation(s): 1. The Heyne design flaws can be addressed by such measures as reverting to the heritage blow-off door design and assessing the suitability of the selected pyrotechnic cutter. However, more rigorous mechanical design practices may prevent such design flaws (Reference (2): o

    19、 Avoid identical electrical connectors in close proximity. This paragraph, which recommends a practice to prevent mis-mating, has been redacted for ITAR compliance. o Select reliable electro-mechanical devices. This paragraph, which advocates use of a particular type of part, has been redacted for I

    20、TAR compliance. o Adjust microswitches. This paragraph, which proposes a switch adjustment measure, has been redacted for ITAR compliance. o Verify pyrotechnic device functional margin. This paragraph, which suggests performing a Provided by IHSNot for ResaleNo reproduction or networking permitted w

    21、ithout license from IHS-,-,-mechanism test, has been redacted for ITAR compliance. o Select screw material, target diameter, and preload. This paragraph, which recommends criteria for developmental testing, has been redacted for ITAR compliance. 2. Implement a process to verify that parts being manu

    22、factured for critical payload systems, such as mission success-critical deployment mechanisms, utilize the materials specified on the drawings. Review the adequacy of processes for the control of critical flight hardware during fabrication and assembly. 3. Establish assembly processes that assure th

    23、at critical flight wiring harnesses are not mis-mated (see Reference (3), especially on flight projects where there may be frequent changes in the payload team. 4. Flag anticipated changes in payload team personnel during the mission as an additional risk. Implement a process to assure retention of

    24、critical payload team knowledge. Plan for launch delays/scrubs by implementing and witnessing appropriate disassembly procedures. Evidence of Recurrence Control Effectiveness: JPL has referenced this lesson learned as additional rationale and guidance supporting Paragraph 6.3.9 (“Managed Margins: Fl

    25、ight System Technical Resource Margins - S/C Mechanisms Functional Margins”) in the JPL standard “Design, Verification/Validation and Operations Principles for Flight Systems (Design Principles),” JPL Document D-17868, Rev. 6, October 4, 2012. Documents Related to Lesson: N/A Mission Directorate(s):

    26、 Science Additional Key Phrase(s): Engineering Design (Phase C/D).Spacecraft and Spacecraft Instruments Manufacturing and Assembly Safety and Mission Assurance.Quality Additional Categories.Flight Equipment Additional Categories.Spacecraft Additional Categories.Industrial Operations Additional Categ

    27、ories.Launch Vehicle Additional Categories.Parts, Materials, & Processes Additional Categories.Hardware Additional Info: Project: Terrain-Relative Navigation and Employee Development (TRaiNED) Year of Occurrence: 2011 Approval Info: Approval Date: 2012-11-28 Approval Name: mbell Approval Organization: HQ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-6796-2012 Lessons Learned TRaiNED Deployment Failure Was Traced to Design Flaws and Process Escapes [Export Version].pdf)为本站会员(cleanass300)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开