    REG NASA-LLIS-2051-2009 Lessons Learned CAD environment could not handle drawing and model size on the project ARES 1-X Upper Stage Simulator (USS).pdf

    • 资源ID:1019355       资源大小:14.80KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-2051-2009 Lessons Learned CAD environment could not handle drawing and model size on the project ARES 1-X Upper Stage Simulator (USS).pdf

    1、Lessons Learned Entry: 2051Lesson Info:a71 Lesson Number: 2051a71 Lesson Date: 2009-4-30a71 Submitting Organization: GRCa71 Submitted by: Carl Blasera71 POC Email: carl.m.blasernasa.govSubject: CAD environment could not handle drawing and model size on the project ARES 1-X Upper Stage Simulator (USS

    2、) Abstract: Transferring into 2 D assembly drawings became difficult to complete in a timely fashion. Engineering change orders would stack up thus resulting in fragmented as-built configuration. Many drawings did not incorporate the change orders.Description of Driving Event: Pro-Engineer CAD softw

    3、are and Windchill configuration management software were used in combination to create and manage CAD files. We migrated to Windchill half way through the project and later found that Windchill uses a large amount of computer memory to track files. The design team also lacked large assembly file man

    4、agement skills. We needed more powerful computers; however, only some of the employees received them in a timely manner. On ARES 1-X USS, model and drawing file sizes grew very fast after the conceptual stage passed. Designers struggled to complete assembly drawings. Computer power and file manageme

    5、nt techniques were lagging as the schedule pressure continued. Much time was spent waiting for frozen computers to update so the next change could be made. Internal CAD support was insufficient to address our productivity issues. Additional CAD support was not funded.Lesson(s) Learned: The design an

    6、d drawing team needs adequate training and expert consultation to deal with problems that arise. While the project was successfully completed, the CAD environment caused undue stress, loss of productivity and low morale. The problem was addressed by learning new techniques the hard Provided by IHSNo

    7、t for ResaleNo reproduction or networking permitted without license from IHS-,-,-way and by hiring more temporary designers.Recommendation(s): Capabilities of all Centers CAD environments must be understood prior to securing new work. The CAD environment setup, hardware, software and network should

    8、be thoroughly evaluated to ensure capability to handle very large file sizes such as assembly drawings necessary for future flight projects. This assessment should be conducted by utilizing large system level drawings typical of the new work that NASA is currently involved in, especially Constellati

    9、on. In addition, the designers need to be involved in the process of setting up the CAD environment, including requirements such as: knowledgeable parties, expertise, infrastructure, equipment, softwareetc. This assessment can be used as a guide to evaluate the current CAD environment capability to

    10、meet future work needs. For example, 060213MFA000 is a USS top level drawing that exemplifies the difficulties GRC had with large drawings. This is primarily a system level drawing, typical of future work, such as ARES V. It is recommended that this drawing be used to assess the current GRC CAD envi

    11、ronment.Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): a71 Exploration SystemsAdditional Key Phrase(s): a71 0a71 0a71 1.Simulators and Training Systemsa71 0.Engineering design and project processes and standardsa71 0.Configuration control and

    12、 data managementa71 1.“a71 0.“a71 0.Computer-Aided Design/Manufacturing/Engineeringa71 0.“Additional Info: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a71 Project: ARES 1-X Upper Stage SimulatorApproval Info: a71 Approval Date: 2009-12-10a71 Approval Name: mbella71 Approval Organization: HQProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-2051-2009 Lessons Learned CAD environment could not handle drawing and model size on the project ARES 1-X Upper Stage Simulator (USS).pdf)为本站会员(eventdump275)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开