欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-1612--2005 Lessons Learned - Cost Estimating Assessing the Human Capital and Facilities Required for New Moon-Mars Missions.pdf

    • 资源ID:1019235       资源大小:16.82KB        全文页数:4页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-1612--2005 Lessons Learned - Cost Estimating Assessing the Human Capital and Facilities Required for New Moon-Mars Missions.pdf

    1、Lessons Learned Entry: 1612Lesson Info:a71 Lesson Number: 1612a71 Lesson Date: 2005-08-19a71 Submitting Organization: ARCa71 Authored by: Donald R. MendozaSubject: Cost Estimating: Assessing the Human Capital and Facilities Required for New Moon-Mars Missions Abstract: A senior individual with exper

    2、ience in many space flight projects, including several X-vehicles, had several observations regarding the readiness of the Agencys human capital and facilities to support the new moon-Mars missions. Description of Driving Event: A senior individual with experience in many space flight projects, incl

    3、uding several X-vehicles, had several observations regarding the readiness of the Agencys human capital and facilities to support the new moon-Mars missions: The majority of the Agencys current scientists and engineers have not had the benefit of working on a major space flight development program;

    4、the last major manned space flight vehicle development (the shuttle) was 30 years ago and most of those people are now retired. The X-vehicle programs aimed at space flight that have occurred over the last few decades have been cancelled prematurely due to schedule and budget overruns and/or signifi

    5、cant technical failures and thus havent provided the same level of training and experience for personnel that worked on programs running trough completion (flight). Many of the Agencys engineers have never experienced a flight test. The facilities used in the development and testing of major space m

    6、issions have not seen much use in recent years and have deteriorated. The competence of the operators of these facilities has also deteriorated from disuse; many of the people with operating experience and knowledge are gone. Work on the NASP (National Aerospace Plane) indicated the agency had to ma

    7、ke a significant Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-investment in facilities in order to be successful and yet during the Programs run and 20 years later, the investments have not been made. Lesson(s) Learned: 1. Without sustaining work,

    8、 the Agency has lost the expertise required for developing the types of systems needed for manned space exploration.2. Scientists and engineers learn the most from completing a project.a. Bad habits (those contributing to failures) are not “un-learned” if personnel are not involved in thorough postm

    9、ortem reviews of failed projects. 1. Most missions ignore developing people and facilities.a. Paper studies and cancelled projects do not address this issue and can mask the real state of Agency health. b. Lack of qualified people can result in unexpected project slowdowns due to the required time t

    10、o climb up the learning curve or in assembling knowledgeable participants for review teams. 1. Inadequately experienced scientists and engineers will still rely on old rules of thumb for design margins and factors of safety.2. If knowledge capture and transfer is not explicitly part of a plan, and p

    11、rovided with adequate resources, it will not happen.a. The existing Agency culture does not value knowledge management and it is not a priority. b. Because planned knowledge capture usually occurs during the end stages of a project, it is one of first items cut when budgets are tight at the end of a

    12、 project. Recommendation(s): 1. The Agency should hold reunions of the alumni of the major space missions (Gemini, Apollo and Shuttle) to capture their experience and lessons learned.a. The successes and failures of more recent missions, such as all the X vehicle programs and planetary exploration m

    13、issions (such as MER), should be reviewed. In particular, understanding the successes should be a priority. 1. The Agency should consider the training value and long-term investment before canceling projects.a. However, for those projects that warrant cancellation, the existing project team should b

    14、e required Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-to perform a postmortem review and document all lessons learned. 1. All projects and missions should be required to develop a training and facilities plan, which includes how the people and f

    15、acilities that are developed will address the long-term goals of the Agency as well as support the project.a. All current decisions with regard to maintaining and developing facilities should be reconsidered to take into account the requirements of the new Moon-Mars mission. 1. Design philosophies t

    16、hat are based on probabilistic failure rates should be emphasized in new designs and need to be supported by simulation and testing. Some projects should be carried through failure, as long as adequately instrumented and safe.a. The Agency needs to work with the academic community to develop curricu

    17、lum aimed at space missions. 1. Projects and missions should be required to include knowledge management in their plans and should be given the budget and schedule to accomplish it.a. The Agency should consider putting a hold on an employees promotion or reassignment until they have accomplished the

    18、ir assigned knowledge management tasks. Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: NPR 7120.5Mission Directorate(s): a71 Exploration Systemsa71 Sciencea71 Aeronautics Researcha71 Space OperationsAdditional Key Phrase(s): a71 Policy & Planninga71 ProcurementProvided

    19、 by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a71 Small Business & Industrial Relationsa71 Program and Project Managementa71 Risk Management/Assessmenta71 Safety & Mission AssuranceAdditional Info: Approval Info: a71 Approval Date: 2006-04-18a71 Approval Name: dkruhma71 Approval Organization: HQProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-1612--2005 Lessons Learned - Cost Estimating Assessing the Human Capital and Facilities Required for New Moon-Mars Missions.pdf)为本站会员(rimleave225)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开