    REG NASA-LLIS-1095-2001 Lessons Learned Construction Site Safety Coordination of Requirements Power Compatibility Design Review Submittal Review.pdf

    • 资源ID:1018734       资源大小:14.71KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-1095-2001 Lessons Learned Construction Site Safety Coordination of Requirements Power Compatibility Design Review Submittal Review.pdf

    1、Lessons Learned Entry: 1095Lesson Info:a71 Lesson Number: 1095a71 Lesson Date: 2001-08-27a71 Submitting Organization: DFRCa71 Submitted by: Roy TryonSubject: Construction Site Safety: Coordination of Requirements, Power Compatibility, Design Review, Submittal Review Description of Driving Event: The

    2、 Center has an existing campus complex of modular buildings fed by a main distribution panel (MDP) with 120-208 volt/3 phase power output. A recent project added 3 more buildings to the complex, each having its own 120-208 volt/3 phase power panel. The mechanical engineer specified HVAC units by spe

    3、cific brand name and numeric catalog number, “or approved equal“. Embedded in that catalog number was a letter code that denoted the specific voltage for the HVAC equipment motors. In this case it denoted 480 volt power. The electrical drawings and specifications (provided by NASA) showed 120-208 vo

    4、lt power supply. Therefore, the mechanical subcontractor furnished and installed exactly what NASA specified and approved during product submittals. It was only when the HVAC equipment was actually installed in the field, and the electrical subcontractor tried to connect up the 208 volt circuit feed

    5、er that anyone realized that there was insufficient voltage to power the specified 480 volt HVAC motors.NASA had several options: (1) Remove the 480 volt equipment and replace them with new 208 volt equipment. (2) Run new 480 volt circuits back to the campus main switchgear. (3) Install new addition

    6、al step-up transformers for each of the 3 HVAC units. Due to constructability, cost and schedule impacts, option #3 was selected.Lesson(s) Learned: 1. The design Project Manager must coordinate mechanical equipment with electrical power service.2. The mechanical designer should not rely on very prec

    7、ise and specific brand name catalog order numbers when specifying long-lead, high cost equipment. When using more generic descriptions the designer should include an actually specification of the available power Provided by IHSNot for ResaleNo reproduction or networking permitted without license fro

    8、m IHS-,-,-supply.3. This mistake could have been caught and corrected during the submittal review process. Catching it there would have saved the additional contract cost or time. Submittal reviewers need to do more than just compare similar catalog numbers. They should also double check on all util

    9、ity service connection requirements for major equipment.Recommendation(s): 1. In the course of the submittal review process ensure that construction reviews substantiate both mechanical equipment with electrical power service requirements for major equipment during the design phase. Key point for be

    10、tter construction reviews is to focus on electrical and other utility service requirements for major equipment items.2. Provide careful submittal reviews during construction. Make sure that the reviewer understands what every one of those specific model code numbers and letters means.3. Avoid specif

    11、ic brand/model # specifications without also adding more generic and descriptive requirements to tell the contractor/supplier exactly what is needed.Evidence of Recurrence Control Effectiveness: 1. Enter this problem/mistake into the NASA Lessons Learned Data Base.Documents Related to Lesson: N/AMis

    12、sion Directorate(s): a71 Exploration Systemsa71 Aeronautics ResearchAdditional Key Phrase(s): a71 FacilitiesAdditional Info: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Approval Info: a71 Approval Date: 2002-02-12a71 Approval Name: John Marcruma71 Approval Organization: DFRCa71 Approval Phone Number: 661-276-2825Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-1095-2001 Lessons Learned Construction Site Safety Coordination of Requirements Power Compatibility Design Review Submittal Review.pdf)为本站会员(Iclinic170)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开