1、VIL-STD-1323 -404 9999911 0498344 O69 H - MILITARY STANDARD MIL-STD-1323404 (NAVY) UNIT LOAD FOR UNDERWAY REPLENISHMENT NULKA ELECTRONIC DECOY CARTRIDGE ( EDC ) MK 234 MODS O AND 1 IN CONTAINER, SHIPPING AND STORAGE, MK 779 MOD O 15 MAY 1997 UNIT LOAD DATA LONTAINER DIMENSIONS: CINGLE LENGTH . 103.6
2、6 WIDTH 17.24 HEIGHT . 18.66 NUMBER OF EDCS PER CONTAINER 1 NUMBER OF CONTAINERS PER UNIT LOAD 1 NUMBER OF EDCS PER UNIT LOAD . 1 WEIGHT OF STEEL STRAPPING O GROSS WEIGHT CUBE . 19.3OCU FT I DO NOT USE FOR SHIPPING WEIGHT. 324 LBS OR HAZARD CLASSIFICATION SEE W020-AC-SAF-010102OIO30. OR UNIT LOAD QU
3、ALIFICATION FEE NWSE TEST REPORT NO. 9701 2. 2-PACK 103.66 17.24 37.32 1 2 2 2 LBS 650 LBS 38.60 CU FT 4-PACK 103.66 34.48 37.32 1 4 4 9 LES 1,305 LBS 77.20 CU.FT AMSC NO.4 UOTES: I. 2. UNLESS OTHERWISE SPECIFIED, DIMENSIONS ARE IN INCHES. FOR CROSS REFERENCE TO ASSOCIATED TRUCKLOADING, CONTAINERLOA
4、DING, AND CARLOADING MILITARY STANDARDS, REFER TO INDEX TO STANDARDS, MIL-HDBK-236 PISTRIBUTION STATEMENT A APPROVED FOR PUBLIC RELEASE DISTRIBUTION IS UNLIMITED. R SHIPPING, HANDLING, THIS UNIT LOAD SHALL CONSIST OF THIS MENT IN COMPLIANCE DA1 PAGE 1 O1 /- ORIGINATOR / DATE NAVAL WEAPONS STATION EA
5、RL COLTS NECK, NEW JERSEY Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-STD-1323 -404 m 9999911 04915145 TT5 MIL-STD-1323. DEUNITIZING PROCEDURE: (A) CUT AND REMOVE ALL STRAPPING. B) SEPARATE CONTAINERS. MIL-STD-1323-404 (NAVY) 3 4 SPACER WOOD
6、lX3X37 6 3 STRAPSEAL STEEL 3/4“ SIZE 2 2 STRAPPING, 4-PACK STEEL 314 X .O35 X 14 FT 3/4 X .O35 X 11 FT 2 1 STRAPPING, 2-PACK STEEL DESCRIPTION MATLIDWG DIMENSIONS REQD ITEM UNITIZING PROCEDURE FOR 2 CONTAINERS. (A) STACK TWO CONTAINERS AS SHOWN. BE SURE TO ALIGN THE STACKING FEATURES. (B) POSITION S
7、TRAPPING, ITEM 1, THROUGH FORK POCKETS OF LOWER CONTAINER AND OVER TOP OF UPPER CONTAINER. STRAPS SHALL BE POSITIONED IN SLOTS ON COVER OF UPPER CONTAINER AS SHOWN. IC) TENSION AND SECURE EACH STRAP WITH ONE DOUBLE NOTCHED SEAL, ITEM 3. MARKING: IN ADDITION TO ANY SPECIAL MARKING REQUIRED BY CONTRAC
8、T OR ORDER, THE UNIT LOAD SHALL BE MARKED IN ACCORDANCE WITH MIL-STD-129-1 (NAVY). UNITIZING PROCEDURE FOR 4 CONTAINERS (A) POSITION TWO 2-CONTAINER UNIT LOADS, UNITIZED AS DETAILED ABOVE, SIDE BY SIDE WITH SPACERS, ITEM 4, BETWEEN THEM TO PROTECT HANDLES. (8) POSITION STRAPPING, ITEM 2, THROUGH SLO
9、T UNDER BOTTOM OF LOWER CONTAINER AND THROUGH SLOT ON COVER OF UPPER CONTAINER AS SHOWN. IC) TENSION AND SECURE EACH STRAP WITH ONE DOUBLE NOTCHED SEAL, ITEM 3. MARKING: IN ADDITION TO ANY SPECIAL MARKING REQUIRED BY CONTRACT OR ORDER, THE UNIT LOAD SHALL BE MARKED IN ACCORDANCE WITH MIL-STD-129-1 (NAVY). SLOTS, TOP AND BOTOM. 2 PL POSrION STRAP IN REVIEW ACTIVITY NAVY-OS PAGE 2 PREPARING ACTIVITY NAVY - OS (PROJECT NO. 814GN1139) I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-