1、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-850b4 13 777770b 0363559 7 MIL-S-85064 (AS) DRAW I NGS NAVAL AIR SYSTEMS COMMAND (Code Ident 30003) DL 695493 DL 695494 DL 1332255 DL 2116941 DL 2116973 DL 2127915 DL 3261252 69681 9 OTHER PUBLICA
2、TIONS NAVAL SEA SYSTEMS COMMAND (Code Ident 53711) WR 54/131 WR 54/167 Signal, Underwater Sound, Mk 82 Mod O, Assembly, Loaded Arming and Firing Mechanism, Mk 39 Mod O, Loaded Pack, Shipping and Storage (For Six or Eight Signals, Underwater Sound) Explosive Section, Underwater Sound Signal, Mk 4 Mod
3、 O, Loaded Explosive Section, Underwater Sound Signal, Mk 8 Mod O, Loaded Pack, Shipping and Storage (For Six Signals, Underwater Sound) Signal, Underwater Sound, Mk 128 Mod 1, Assembly, Loaded Arming Wire Assembly Weapons Requirement, Palletizing, Fleet Issue Unit Load, Signals, Underwater Sound We
4、apons Requirement, Pal 1 eti zing , Fleet Issue Unit Load, Signals, Underwater Sound (Copies of specifications, standards, drawings, and pub1 ications required by contractors in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contra
5、cting officer. ) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-85064 13 m 7777706 0363561 7 m 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility
6、 for inspection. - Unless otherwise specified in the contract or order, the supplier is responsible for the perform- ance of all inspection requirements as specified herein. otherwise specified in the contract or order, the supplier may use his or any other facilities suitable for the performance of
7、 the inspection requirements specified herein, unless disapproved by the Government. In addition, the Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure suppl ies and services conform to prescribed requ
8、irements . 4.2 Classification of inspections. - The inspection requirements specified herein are classified as follows. (a) First article inspection (see 4.3). (b) Quality conformance inspection (see 4.4). Except as *- k I 4.3 First article inspection. - Unless otherwise speci ied in the The sample
9、will be subjected by the Government contract or order, a first article sample of 80 signals sha 1 be sub- mitted for evaluation. to any or all of the examinations and tests specified in 4.5.1 and 4.5.2 of this specification and any or all requirements of the applicable drawings. The first article sa
10、mple shall be manufactured using the same methods and materials prepared for production. Any production prior to acceptanceof the first article sample shall be at the risk of the supplier. 4.3.1 First article performance test sampling. - Of the sample submitted, 20 each shall be tested under each Co
11、ndition of Table II. Two defective units in any one of the samples of 20 shall reject the total first article sample for MAJOR characteristics. One CRITICAL defect shall reject the first article sample. 4.4 Quality conformance inspection. - The quality conformance inspection shall verify that all ch
12、aracteristics of Section 3, Require- ments, and Section 5, Packaging, have been met. 4.4.1 Inspection lot. - The inspection lot shall be as defined in MIL-STD-105, shall not exceed 3200 signals, and shall not be less than 1201 except in start-up and in final lots. Lot sizes shall be in mu1 tip1 es o
13、f pal 1 et 1 oads pl us samples for destructive tests. 4.4.2 Inspection lot sample. - The inspection lot sample shall be selected and examined to the data package in accordance with MIL-STD-105, Inspection Level II, with an Acceptable Quality Level (AQL) of 1 .O de- fects per hundred units for MAJOR
14、 characteristics and 2.5 defects per hundred units for MINOR Characteristics, except as specified in 4.4.3. One CRITICAL defect shall reject the lot. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1 Shall ow 300 2 Deep 300 3 Shallow 10,000 4 Deep 1
15、o ,000 300 300 190 I90 4.4.3.1 Performance lot sample inspection. - Prior to conducting the performance tests, 100 percent of the sample shall be visually examined to verify the fol lowing, with an AQL of i .O defects per hundred units for MAJOR characteristics and 2.5 defects per hundred units for
16、MINOR characteristics (not annotated). One CRITICAL defect shall reject the lot. (a) The container marking is legible and correct. (b) The container is not deformed in a manner hat would adversely affect sealing or removal of the contents. or permanent deformation. * (c) The lid gasket shall not be
17、damaged or exhibit deterioration (d) The presence of eight desiccant units, and one each humdiity indicator, instruction sheet and ammunition data card. (e) The Styrofoam trays are anti-static treated (C3). (f) There is no evidence of TNT exudate from the tail and the plastic closure plug is securel
18、y in place (C4). This applies to the SUS Mk 82 only,) (Note: 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-850b9 13 797770b 0363563 O W (9) The arming wire assembly is properly assembled and not free (h) The explosive section is not damaged
19、 (C6). (i) The signal marking and color coding are legible and correct (C7). (j) The depth setting wire is properly installed (M105). (k) The four screws holding the A&F mechanism to the explosive to fall out by gravity (C5). section are tightened to flatten the lockwashers (M106). (1) There is no e
20、vidence of corrosion of the metal parts. (m) The tail shroud is not loose (M107). 4.5 Test and inspection methods. 4.5.1 Time from water entry to detonation. - The signal shall be launched from a suitable aircraft and the time from water entry to detonation measured to an accuracy of 1.0 percent of
21、the mean specified times. 4.5.2 Detonation. - The detonation first bubble period shall be 4.5.3 Packaging. - Prior to shipment, the pallet loading shall be measured to n accuracy of 2.5 percent of the mean specified times. inspected to ensure the assemblage is complete, that markings for identity an
22、d shipping are in accordance with the applicable drawings and Section 5. 5. PACKAGING 5.1 Packing. - The signal shall be packed in ammunition boxes in accordance with the drawings and specifications 1 isted on either DL 2127915 or DL 1332255. cordance with the requirements specitied on either WK 54/
23、13l or WK 54/1b/, contract or order, each exterior container shall be marked ii ance with MIL-STD-129. 6. NOTES launching from aircraft or surface vessels to provide a powerrui of underwater acoustic energy. position fixing, communication, bottom mapping, sound transmission studies, etc. fi _ source
24、 I It may be used f b - 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-5064 13 9 7777706 0363565 4 9 6.5 Precedence - When the requirements of
25、the contract, this specification, or applicable subsidiary specifications are in conflict, the following precedence shall apply: (a) Contract - The contract shall have precedence over any specifications. (b) This Specification - This specification shall have precedence over all applicable subsidiary
26、 specifications. (c) Referenced Specification, Standards, and Requirements - Any referenced specification shall have pzecedence over all:-applicable subsidiary specifications referenced therein. All referenced specifi- cations shall apply to the extent specified. (d) Drawings - Drawings or lists of
27、drawings referenced herein shall have precedence over all subsidiary drawings. enced drawings shall apply to the extent specified thereon. All refer- 6.6 Changes from previous issue - Asterisks are not used in this revision to identify changes with respect to the previous issue due to the extensiven
28、ess of the changes. 6.7 This specification is under the cognizance of AIR-53301G. Cus todian : Navy (AS) Preparing Activity : Navy (AS) (Project No. 1361-NO12 U. S. GOVERNMENT PRINTING OFFICE1 1977-703-020/4354 8 _ - . - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-