1、MIL-I-L30LB (1) b3 9 9999906 OU?O?b9 3 m - MIL-I-l73OlB(SHIPS) AMENDMENT 1 11 March 1991 MILITARY SPECIFICATION INDICATOR, SHIPS DISTANCE-SPEED This amendment forms a part of MIL-I-l7301B(SHIPS), dated 7 April 1965, and is approved for use by the Naval Sea Systems Command, Department of the Navy and
2、 is available for use by all Departments and Agencies of the Department of Defense. PAGE 2 3.1: Delete and substitute: “3.1 First article. When specified (see 6.2), a sample shall be subjected to first article inspection (see 6.3) in accordance with 4.2.“ PAGE 7 4.2: Delete and substitute: “4.2 Firs
3、t article insnection. First article inspection shall consist of the examinations and tests as specified in table.1.“ PAGE 8 Table I, title: Delete “Qualification tests“ and substitute “First article tests“. AMSC N/A FSC 6320 PISTRIBUTION STATEMENT B. Approved for public release; distribution is unli
4、mited 1 of 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-I-L73DLB (1) b3 D 9999906 0970370 3 d MIL-I-17301B(SHIPS) MENDHENT 1 PAGE 11 6.3: Delete and substitute: “6.3 Firs t articl e. When first article inspection is required, the contracting
5、 officer should provide specific guidance to offerors whether the item(s) should be a preproduction sample, a first article sample, a first production item, a sample selected from the first production items, a standard production item from the contractors current inventory (see 3.1), and the number
6、of items to be tested as specified in 4.2. include specific instructions in acquisition documents regarding arrangements for examinations, approval of first article test results, and disposition of first articles. right to waive the requirement for samples for first article inspection to those bidde
7、rs offering a product which has been previously acquired or tested by the Government, and that bidders offering such products, who wish to rely on such production or test, must furnish evidence with the bid that prior Government approval is presently appropriate for the pending contract. submit alte
8、rnate bids unless specifically requested to do so in the solicitation.” The contracting officer should also Invitations for bids should provide that the Government reserves the Bidders should not 6.4: Delete in its entirety. Preparing activity: (Project 6320-N033) Navy - SH 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-