欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    ITU-R QUESTION 2784-2009 Use of operational facilities to meet power flux-density limitation under Article 21 of the Radio Regulations《使用业务设施以满足《无线电规则》第21条规定的功率通量密度限制》.pdf

    • 资源ID:792519       资源大小:24.25KB        全文页数:2页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    ITU-R QUESTION 2784-2009 Use of operational facilities to meet power flux-density limitation under Article 21 of the Radio Regulations《使用业务设施以满足《无线电规则》第21条规定的功率通量密度限制》.pdf

    1、 QUESTION ITU-R 278/4Use of operational facilities to meet power flux-density limitation under Article 21 of the Radio Regulations (2009) The ITU Radiocommunication Assembly, considering a) that provision 11.31 a) of the Radio Regulations (RR) requires the Radiocommunication Bureau (BR) to examine t

    2、he notified frequency assignments under Article 11 of the RR, inter alia, with respect to its conformity with Article 21 (power-flux-density limits); b) that the BR received in the past and is still receiving submissions from administrations for which the power flux-density examinations show an exce

    3、ss initially varying from 0 to 9 dB, and recently up to 10 dB or more, within a certain range of elevation angles of arrival; c) that after consultation with the notifying administrations the BR was informed that with the application of technical means such as energy dispersal and backoff control th

    4、e power-flux density could be adjusted to the level specified in the RR; d) that, in examining these cases, the BR had given a favourable RR 11.31 a) Finding for the submissions mentioned in b) above when the subject notice contained details of the operational/technical scheme to ensure power flux-d

    5、ensity conformance to the mandatory RR Article 21 limits; e) that the BR, in performing its mandatory tasks relating to the application of the above-mentioned provisions, is concerned with the extent to which the application of such operational measures to the space services could be accepted withou

    6、t hampering other services sharing the same frequency bands; f) that Article 21 contains no power flux-density limits for any frequency bands above 50.2 GHz, and that there are higher frequency bands which have co-primary allocations of broadcasting-satellite and fixed-satellite services (space-to-E

    7、arth) with terrestrial services for which no regulatory sharing mechanisms exist, decides that the following Questions should be studied 1 What are the actual design capabilities of space systems regarding the use of operational facilities such as energy dispersal, back-off control and other techniq

    8、ues for the adjustment of power flux-density levels? _ Replaces former Question ITU-R 235/4. - 2 - 2 What are the maximum limits beyond which the use of such power adjustment facilities are no longer feasible? 3 What are the technical means by which such facilities could be used in a given service a

    9、rea and within a certain range of angles of arrival? 4 How would these operational measures (such as the increase in the back-off to overcome the power flux-density excess) affect the performance of the subject satellite networks in the concerned service area? further decides 1 that the results of the above studies should lead to the formulation of appropriate Reports and/or Recommendations by 2010. Category: S1


    注意事项

    本文(ITU-R QUESTION 2784-2009 Use of operational facilities to meet power flux-density limitation under Article 21 of the Radio Regulations《使用业务设施以满足《无线电规则》第21条规定的功率通量密度限制》.pdf)为本站会员(inwarn120)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开