FORD C-8-1999 CHECKING REQUIREMENTS (Version 28).pdf
-
资源ID:744764
资源大小:34.51KB
- 资源格式: PDF
下载积分:10000积分
快捷下载

账号登录下载
微信登录下载
下载资源需要10000积分(如需开发票,请勿充值!)
友情提示
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
|
FORD C-8-1999 CHECKING REQUIREMENTS (Version 28).pdf
1、 FECDS C-8 Engineering CAD & Drafting Standards Ford Proprietary and/or Confidential Information - Do not distribute to others w/o prior written authorization. Version 28 TOC Original Issue: 19960419 Copyright, Ford Motor Company. Latest Re-issue: 19991231C81 Printed copies are uncontrolled.CHECKING
2、 REQUIREMENTS 1 INTRODUCTION 2 DEFINITIONS (Reserved) 3 REQUIREMENTS (Reserved) 3.1 All new and revised drawings must be checked and signed prior to release to insure completeness and conformance to FECDS and relevant procedures. The identity of the person checking the drawing will be added to the CHECKED box as shown in Standard A1. 4 SPECIFICATIONS (Reserved) 5 ADDENDUM (Reserved)