欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    DLA MIL-PRF-1 878 G-2012 ELECTRON TUBE POWER TYPE 250TH.pdf

    • 资源ID:692111       资源大小:60.87KB        全文页数:5页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    DLA MIL-PRF-1 878 G-2012 ELECTRON TUBE POWER TYPE 250TH.pdf

    1、 MIL-PRF-1/878G 27 March 2012 SUPERSEDING MIL-PRF-1/878F 7 January 2000 PERFORMANCE SPECIFICATION SHEET ELECTRON TUBE, POWER TYPE 250TH * This specification is approved for use by all Departments and Agencies of the Department of Defense. The requirements for acquiring the electron tube described he

    2、rein shall consist of this document and the latest issue of MIL-PRF-1. DESCRIPTION: Triode. See figure 1. Weight: 10 ounces nominal (283.5 grams). Mounting position: Vertical. ABSOLUTE RATINGS: C Telegraphy. Parameter: Unit: F MHz Ef V Eb kV dc Ec V dc Ib mA dc Ic mA dc Pp W Maximum: Minimum: 40 - 5

    3、.25 4.75 3.0 - -210 - 330 - 75.0 - 250 - Test conditions: - 5.0 V ac 2.5 Adjust 100 - - See footnotes at end of table I. _ GENERAL: Qualification: Not required. Holding period: (MIL-STD-1311): 1/ This specification sheet uses accept on zero defect sampling in accordance with MIL-PRF-1, table III. _

    4、* Tube type 250TL has been deleted from this tube specification sheet. Use EIA Type 250TL. AMSC N/A FSC 5960 INCH-POUND Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/878G 2 TABLE I. Testing and inspection. Inspection Method Conditions Sym

    5、bol Limits Unit MIL-STD-1311 Min Max Conformance inspection, part 1 Filament current 1301 If 9.7 11.2 A ac Total grid current 1266 Ic - -15 A dc Electrode voltage (grid) 1261 Ec -27.0 -39.0 V dc Primary grid emission 1266 Ef = 5.5 V ac; Ic = 175 mA dc; t = 15 Isg - -500 A dc Peak emission 1231 eb =

    6、ec = 2,500 v is 5.0 - a Conformance inspection, part 2 Amplification factor 1316 Mu 31.0 41.0 - Power oscillation 1236 Eb = 3,000 V dc; Ib = 300 mA dc; F = 8 MHz Po 540 - W Direct-interelectrode capacitance 1331 Cgp Cin Cout 2.2 3.7 - 3.0 5.1 0.6 pF pF pF See footnotes at end of table. Provided by I

    7、HSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/878G 3 TABLE I. Testing and inspection - Continued. Inspection Method Conditions Symbol Limits Unit MIL-STD-1311 Min Max Conformance inspection, part 3 Life test - Group C; power oscillation; t = 500 hours

    8、 - - - - Life-test end points: Peak emission Primary grid emission - 1231 1266 is Isg 3.5 - - -500 a A dc Low-frequency vibration 1031 No voltages 2/ - - - - Bump 1036 Angle = 20 2/ - - - - Low-frequency vibration and bump end points: Total grid current Electrode voltage (grid) - 1266 1261 Ic Ec - -

    9、27.0 -15 -39.0 A dc V dc 1/ In addition to the 24-hour holding period, 10 percent of the tubes in any production lot shall be held for a period of 72 hours. If more than 2 percent of the tubes fail to meet the total grid current test, the tubes represented by this sample shall be subject to recall a

    10、nd all tubes shall be held for a period of 72 hours. 2/ This test shall be performed yearly, with sampling as follows: n1 = 4 c1 = 0 where c2 represents the total failures for the first and second samples combined. n2 = 4 c2 = 0; In case of failure, the test shall become a conformance inspection, pa

    11、rt 2 test for three successive successful submissions, at which time the test may revert to the yearly basis. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/878G 4 NOTES: 1. This test shall be performed yearly, with sampling as follows: n1

    12、 = 4 c1 = 0 where c2 represents the total failures for the first and second samples combined. n2 = 4 c2 = 0; In case of failure, the test shall become a conformance inspection, part 2 test for three successive successful submissions, at which time the test may revert to the yearly basis. 2. On finis

    13、hed tube, add .060 inch (1.52 mm) maximum for solder. FIGURE 1. Outline drawing of electron tube type 250TH. Dimensions Ltr Inches Millimeters Notes Min Max Min Max Conformance inspection, part 2 A 9.625 10.125 244.48 257.18 B - 3.813 - 96.85 D 5.688 6.188 144.48 157.18 F 1.563 1.938 39.70 49.23 J .

    14、312 - 7.92 - Conformance inspection (periodic check) part 3 1 C 9.375 9.875 238.13 250.83 E - 1.867 - 47.42 H - .082 - 2.08 K .065 .071 1.65 1.80 P .250 .320 6.35 8.13 2 Q - .109 - 2.77 V - 2.500 - 63.50 X .328 - 8.33 - Z .350 .365 8.89 9.27 AA .185 .189 4.70 4.80 AB 80 100 Reference dimensions G 1.

    15、225 31.12 2 L 1.938 49.23 M 2.719 69.06 2 N .031 0.79 R .688 17.48 S .344 8.74 T .344 8.74 U .688 17.48 W .563 14.30 Y .500 12.70 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/878G 5 Referenced documents. In addition to MIL-PRF-1, this sp

    16、ecification sheet references MIL-STD-1311. The margins of this specification are marked with vertical lines to indicate where changes from the previous issue were made. This was done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bid

    17、ders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous issue. Custodians: Preparing activity: Army - CR DLA - CC Navy - EC Air Force - 85 (Project 5960-2012-012) DLA - C

    18、C Review activities: Army - AR Navy - AS, CG, MC, OS, SH Air Force - 19, 99 NOTE: The activities listed above were interested in this document as of the date of this document. Since organizations and responsibilities can change, you should verify the currency of the information above using the ASSIST Online database at https:/assist.daps.dla.mil/. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(DLA MIL-PRF-1 878 G-2012 ELECTRON TUBE POWER TYPE 250TH.pdf)为本站会员(brainfellow396)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开