1、 MIL-PRF-1/1204H 2 July 2004 SUPERSEDING MIL-PRF-1/1204G 29 June 1999 PERFORMANCE SPECIFICATION SHEET ELECTRON TUBE, CATHODE RAY TYPE 1DP1 This specification is approved for use by all Depart- ments and Agencies of the Department of Defense. The requirements for acquiring the electron tube described
2、 herein shall consist of this document and the latest issue of MIL-PRF-1. DESCRIPTION: Miniature 1-inch, electrostatic deflection and focus. PIN CONNECTIONS AND DIMENSIONS. See figure 1. ABSOLUTE RATINGS: Parameter: Unit: Ef V Ec1 V dc Ed V Eb1 V dc Eb2 V dc Rg Meg Zd Meg Rd Meg Alt ft Maximum: Mini
3、mum: 6.9 5.7 0, -100 - 400 - 300 - 1,000 - 2 - 2 - 2 - 60,000 - Test conditions: 6.3 Adjust - Focus 800 - - - - See footnotes at end of table I. GENERAL: First article inspection: Required. 4/ AMSC N/A FSC 5960 INCH-POUND Provided by IHSNot for ResaleNo reproduction or networking permitted without l
4、icense from IHS-,-,-MIL-PRF-1/1204H 2 TABLE I. Testing and inspection. MIL-STD-1311 Limits Inspection Method Notes Conditions Symbol Min Max Unit Conformation inspection, part 1 Voltage breakdown 5201 - - - - - Voltage breakdown (electrostatic types) 5201 - - - - - Bulb, screen, and face- plate qual
5、ity 5106 - - - - - Modulation 5223 - Light = 5 fL Ec - 40 V dc Spot position (electro- static deflection) 5231 - Disp1 - 4 mm Grid cutoff voltage 5241 - Ec1 - -95 V dc Grid No. 1 leakage current 5251 - - - 5 A dc Anode No. 2 leakage current 5251 - - - 15 A dc Gas “cross“ 5206 1/ Light = 5 fL - - - -
6、 Spot displacement (leakage) 5231 - Disp1 - 3 mm Light output 5221 2/ Light 5 - fL Conformance inspection, part 2 Heater current 1301 - If 180 220 mA dc Stray light emission (conventional types) 5216 - Eb2 = 1,000 V dc - - - - Line width A (electrostatic deflection) 5226 - Ik = 50 A dc, 12 lines Wid
7、th - 0.25 mm Line width B (electrostatic deflection) 5226 - Ik = 50 A dc, 12 lines Width - 0.35 mm Electrode current (anode No. 1) 5201 - Ib1 -10 +10 A dc Electrode current (cathode) 5201 - Light = 5 fL Ik - 1 mA Deflection factor 5248 - ID2 DF 350 450 V dc/inch Deflection factor 5248 - 3D4 DF 250 3
8、50 V dc/inch Angle between traces 5101 - - - - - Focusing voltage at cutoff 5246 - Eb1 175 275 V dc Base alignment (electrostatic types) 5101 - ID2 between pin numbers 2 and 3 - - - - Permanence of marking 1105 - - - - - See footnotes on next page. Provided by IHSNot for ResaleNo reproduction or net
9、working permitted without license from IHS-,-,-MIL-PRF-1/1204H 3 TABLE I. Testing and inspection - Continued. MIL-STD-1311 Limits Inspection Method Notes Conditions Symbol Min Max Unit Conformance inspection, part 3 Life test - - Group C; Eb2 = 800 V dc; t = 500 hours minimum; light = 5 fL - - - - L
10、ife test end points: Grid No. 1 leakage current Anode No. 2 leakage current Stray light emission (conventional types) Line width A Line width B Modulation Light output - 5251 5251 5216 5226 5226 5223 5221 - - - - - - 2/ - - - Width Width Ec Light - - - - - - 4 5 15 - 0.50 0.75 50 - A dc A dc - mm mm
11、 V dc fL Cathode illumination 5216 3/ - - - - Barometric pressure, reduced 1002 3/ 54 5 mmHg - - - - Pressure 1141 3/ - - - - Direct-interelectrode capacitance 1331 3/ k to all g1 to all D1 to D2 D3 to D4 D1 to all D2 to all D3 to all D4 to all Ck Cg1 C1D2 C3D4 CD1 CD2 CD3 CD4 - - - - - - - - 2.5 5
12、1.25 1 3 4 3 3 pF pF pF pF pF pF pF pF Vibration 5111 3/ Width - 1.0 mm Shock 5115 3/ - - - - Base strain 1121 3/ - - - - 1/ This test is to be performed at the conclusion of the holding period. 2/ The light output shall be taken using a .500 by .500 inch (12.7 by 12.7 mm) raster of 35 to 105 lines
13、and 60 frames per second. Ik = 500 A dc. 3/ This test shall be performed during the initial production and once each succeeding 12-calendar months in which there is production. An accept on zero defect sampling plan shall be used, with sample of three tubes with an acceptance number of zero. In the
14、event of failure, the test will be made as a part of conformance inspection, part 2, with an acceptance level of 6.5 (see 5/). The regular “12-calendar month“ sampling plan shall be reinstated after three consecutive samples have been accepted. 4/ First article inspection shall consist of performing
15、 all tests listed in this tube specification sheet. The sample size and allowable defects shall be in accordance with MIL-PRF-1, qualification, samples, and acceptance criteria. Three copies of the test report (see MIL-HDBK-831) shall be forwarded to the purchasing activity for evaluation by the pre
16、paring activity. Invitation for bids should provide that the preparing activity reserves the right to waive the requirements for first article samples as to those bidders offering a product which has been previously acquired or tested by the Government, and that bidders offering such products who wi
17、sh to rely on such production or test, must furnish evidence with the bid that prior Government approval is presently appropriate for the pending acquisition. 5/ This specifiction sheet uses accept on zero defect sampling in accordance with MIL-PRF-1, table III. Provided by IHSNot for ResaleNo repro
18、duction or networking permitted without license from IHS-,-,-MIL-PRF-1/1204H 4 NOTE: Useful screen radius. FIGURE 1. Outline drawing of electron tube type 1DP1. Pin No Element 1 2 3 4 5 6 7 8 9 Grid No. 1 Deflector plate D1 Deflector plate D3 Heater Heater cathode Deflector plate D2 Anode No. 2 Anod
19、e No. 1 Deflector plate D4 Dimensions Ltr Inches Millimeters Min Max Min MaxQualification inspection F Base: E9-1 except for pin length Conformance inspection, part 2 A 2.917 3.004 74.09 76.30 B .750 .875 19.05 22.23 C 2.687 2.749 68.25 69.82 D .230 .255 5.84 6.48 E .350 - 8.89 - Provided by IHSNot
20、for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/1204H 5 NOTES Referenced documents. In addition to MIL-PRF-1, this specification sheet sheet references MIL-STD-1311 and MIL-HDBK-831. Changes from previous issue. The margins of this specification are marked wi
21、th vertical lines to indicate where changes from the previous issue were made. This was done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on
22、the entire content irrespective of the marginal notations and relationship to the previous issue. Custodians: Preparing activity: Army - CR DLA - CC Navy - EC Air Force - 11 (Project 5960-3721) DLA - CC Review activities: Navy - AS, CG, MC, OS, SH Air Force - 99 NOTE: The activities listed above wer
23、e interested in this document as of the date of this document. Since organizations and responsibilities can change, you should verify the currency of the information above using the ASSIST Online database at www.dodssp.daps.mil. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-