欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    CEN TR 16469-2013 Hydrometry - Measurement of the rainfall intensity (liquid precipitation) requirements calibration methods and field measurements《液体比重测定法 降雨强度的测量(液相沉淀) 要求 校准方法和实地.pdf

    • 资源ID:592256       资源大小:2.12MB        全文页数:24页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    CEN TR 16469-2013 Hydrometry - Measurement of the rainfall intensity (liquid precipitation) requirements calibration methods and field measurements《液体比重测定法 降雨强度的测量(液相沉淀) 要求 校准方法和实地.pdf

    1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI Standards PublicationHydrometry Measurement of the rainfall intensity (liquid precipitation): requirements, calibration methods and field measurements PD CEN/TR 16469:2013National forewordThis Publis

    2、hed Document is the UK implementation of CEN/TR 16469:2013. The UK participation in its preparation was entrusted to Technical CommitteeCPI/113, Hydrometry.A list of organizations represented on this committee can be obtained onrequest to its secretary.This publication does not purport to include al

    3、l the necessary provisions of acontract. Users are responsible for its correct application. The British Standards Institution 2013.Published by BSI Standards Limited 2013.ISBN 978 0 580 77503 1 ICS 07.060 Compliance with a British Standard cannot confer immunity from legal obligations.This Published

    4、 Document was published under the authority of the Standards Policy and Strategy Committee on 31 March 2013. Amendments issued since publicationDate Text affectedPUBLISHED DOCUMENTPD CEN/TR 16469:2013TECHNICAL REPORT RAPPORT TECHNIQUE TECHNISCHER BERICHT CEN/TR 16469 January 2013 ICS 07.060 English

    5、Version Hydrometry - Measurement of the rainfall intensity (liquid precipitation): requirements, calibration methods and field measurements Mesurage de lintensit pluviomtrique (prcipitations liquides) : exigences, mthodes dtalonnage et mesures de terrain Hydrometrie - Messung der Regenintensitt (fls

    6、siger Niederschlag): Anforderungen, Kalibrierverfahren und Feldmessungen This Technical Report was approved by CEN on 27 November 2012. It has been drawn up by the Technical Committee CEN/TC 318. CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Repu

    7、blic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and United Kingdom. EUROPEAN

    8、 COMMITTEE FOR STANDARDIZATION COMIT EUROPEN DE NORMALISATION EUROPISCHES KOMITEE FR NORMUNG Management Centre: Avenue Marnix 17, B-1000 Brussels 2013 CEN All rights of exploitation in any form and by any means reserved worldwide for CEN national Members. Ref. No. CEN/TR 16469:2013: EPD CEN/TR 16469

    9、:2013CEN/TR 16469:2013 (E) 2 Contents Page Foreword 3 1 Scope 5 2 Normative references 5 3 Terms and definitions .5 4 Standardization of RI raingauge calibration and field requirements .7 5 Accuracy of rainfall intensity 7 5.1 Fundamentals and requirements .7 5.2 Laboratory calibration method (const

    10、ant flow and step response) .8 5.3 Classification of gauges according to accuracy performances .9 5.4 Field calibration method (calibration verification) .9 5.5 Traceability of the RI measurements 10 6 Field rainfall intensity measurements 10 6.1 References gauges and field intercomparisons 10 6.2 R

    11、elevant operational requirements for field RI measurements . 10 6.3 General requirements for siting and exposure (as indicated by WMO-No. 8, 7thedition) . 11 6.4 International field intercomparisons: role and outcomes 12 Annex A (informative) Laboratory tests . 13 Annex B (informative) Field measure

    12、ments 17 PD CEN/TR 16469:2013CEN/TR 16469:2013 (E) 3 Foreword This document (CEN/TR 16469:2013) has been prepared by Technical Committee CEN/TC 318 “Hydrometry”, the secretariat of which is held by BSI. Attention is drawn to the possibility that some of the elements of this document may be the subje

    13、ct of patent rights. CEN and/or CENELEC shall not be held responsible for identifying any or all such patent rights. The Executive Council of the WMO, noting the working arrangements between the ISO and WMO formally adopted on 16 September 2008, recognised the wide ranging benefits to National Meteo

    14、rological and Hydrological Services and user communities resulting from the implementation of common Standards relevant for meteorology and hydrology and the need to established the benefit/cost implication to WMO Members of elevating an existing Technical Regulation/Manual/Guide to a common Standar

    15、d. The EC finally approved procedures to be followed in proposing common technical standards (Resolution 8, Abridged Final Report of the sixty-first session of the WMO Executive Council). This document is not a European Standard but a Technical Report. It is a document to describe recent findings in

    16、 rainfall intensity (RI) measurements and related accuracy aspects, following the results and outcomes of the most recent international RI gauges intercomparison organised by the World Meteorological Organisation (WMO). The Technical Report also provides informative documentation (in annexes) contai

    17、ning methods for laboratory calibrations, field tests and reference field measurements. In consideration of the requirement for general standardization and homogeneity of precipitation intensity measurements and the need for instruments development to promote worldwide instrument compatibility and i

    18、nteroperability, the WMO Lead Centre on Precipitation Intensity “B. Castelli” (Italy) has been designated by the WMO Commission of Instruments and Methods of Observation (CIMO General Summary of the fifteen Session, Helsinki, Finland, 2 - 8 September 2011). The Lead Centre is intended as a Centre of

    19、 Excellence for instrument development and testing which would be established with the purpose of providing the scientific community with specific guidance and standard procedures about instrument calibration and their achievable uncertainty, performing laboratory and field tests and the intercompar

    20、ison of instruments, and providing research advances and technical developments about the measurement of precipitation intensity and the related data analysis and interpretation. PD CEN/TR 16469:2013CEN/TR 16469:2013 (E) 4 Introduction The need for, and the importance of accurate and reliable rainfa

    21、ll intensity (RI) measurements is ever increasing. This is the result of a number of factors, including the increased recognition of scientific and practical issues related to the assessment of possible climatic trends, the mitigation of natural disasters (e.g. storms and floods), the slowing down o

    22、f desertification and the design of structures (buildings, construction works) and infrastructure (drainage). This has resulted in more rigorous and enhanced quality requirements for RI measurements. The volume of rainfall received by a collector through an orifice of known surface area in a given p

    23、eriod of time has traditionally been adopted as the reference variable, namely the rainfall depth. Under the restrictive hypothesis that rainfall is constant over the accumulation period, a derived variable, “the rainfall rate, or intensity (RI)”, can be calculated. The estimated RI should get close

    24、r to the actual flow of water ultimately reaching the ground as the recording time interval decreases. In view of the very high variability of RI, field measurements at short time scales (e.g. 1 min) are crucial to enable high quality measurement be taken to mitigate the impact of severe events and

    25、save lives, property and infrastructures. As the probability of heavy rainfall events is small, long-term records of RI are required to estimate the frequency of occurrence of very intense rainfall at a given location and time. On completion of the most recent RI gauges intercomparison organised by

    26、the World Meteorological Organisation (WMO), it has been recommended that RI measurements should be covered by International Standards. These standards should be based on the knowledge obtained from those latest WMO intercomparison and other current research and good practice. The adoption of such a

    27、n approach will assist rainfall data collection practitioners to obtain homogeneous and compatible data sets. The procedure adopted for performing calibration tests in the laboratory should become a standard method to be used for assessing the instruments performance. Acceptance tests could be based

    28、 on the adopted laboratory procedures and standards. A classification of instrument performance should also be developed to help users in selecting the most appropriate instrument for their applications. PD CEN/TR 16469:2013CEN/TR 16469:2013 (E) 5 1 Scope This Technical Report describes a method for

    29、 calibrating rainfall intensity (RI) gauges and the measurement requirements to obtain accurate and compatible data sets from hydro-meteorological networks, as a forerunner to the development of full hydro-meteorological data collection standards. This Technical Report deals exclusively with catchin

    30、g-type RI gauges (see Clause 3). It concentrates on the generic calibration, performance checking and estimation of uncertainties for RI gauges. It does not cover specific gauge measurement principles, technical characteristics and technology adopted in the design of RI gauges 2 Normative references

    31、 The following documents, in whole or in part, are normatively referenced in this document and are indispensable for its application. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. EN 137

    32、98, Hydrometry Specification for a reference raingauge pit 3 Terms and definitions For the purposes of this document, the following terms and definitions apply. 3.1 catching raingauge a raingauge which collects precipitation through an orifice, often a funnel, of well-defined size and measure its wa

    33、ter equivalent, volume, mass or weight that has been accumulated in a certain amount of time Note 1 to entry: This type of gauge includes storage, level monitoring, tipping bucket and weighing raingauges. This is the most common type of recording raingauge in use in operational networks at the time

    34、of preparing this Technical Report. 3.2 delay time of the output of a RI measuring gauge delay of the output message of some RI measuring raingauges Note 1 to entry: The internal calculation of the rainfall intensity in some raingauges can cause a delay of the output data message (e.g. 1 minute) whi

    35、ch can easily be shifted automatically to the correct time without any degradation in measurement accuracy. This is typical of software corrected tipping bucket raingauges through embedded electronic chips or interfaces. The delay time should not be confused with the time constant. If real-time outp

    36、ut is not needed, software induced delay times are less critical than longer time constants or any other effects, because delay times can easily be corrected to retrieve the original RI information. SOURCE: Adapted from WMO IOM 2009 3.3 measurand quantity intended to be measured SOURCE: VIM:2008 PD

    37、CEN/TR 16469:2013CEN/TR 16469:2013 (E) 6 3.4 measurement uncertainty non-negative parameter characterizing the dispersion of the quantity values being attributed to a measurand, based on the information used SOURCE: VIM:2008 Note 1 to entry: The parameter may be, for example, a standard deviation ca

    38、lled standard measurement uncertainty (or a specified multiple of it), or the half-width of an interval, having a stated coverage probability. Note 2 to entry: Measurement uncertainty comprises, in general, many components. Some of these may be evaluated by Type A evaluation of measurement uncertain

    39、ty from the statistical distribution of the quantity values from series of measurements and can be characterised by standard deviations. The other components, which may be evaluated by Type B evaluation of measurement uncertainty, can also be characterised by standard deviations, evaluated from prob

    40、ability density functions based on experience or other information: a) Instrumental measurement uncertainty (VIM 2008): component of measurement uncertainty arising from a measuring instrument or measuring system in use. Instrumental measurement uncertainty is obtained through calibration of a measu

    41、ring instrument or measuring system, except for a primary measurement standard for which other means are used. Instrumental uncertainty is used in a Type B evaluation of measurement uncertainty. Information relevant to instrumental measurement uncertainty may be given in the instrument specification

    42、s. b) Achievable measurement uncertainty (WMO no. 8, Part I Annex 1.B): it is intended as the measurement uncertainty achievable in field and/or operational conditions. 3.5 non-catching raingauge raingauge where the rain is not collected in a container/vessel Note 1 to entry: The rainfall intensity

    43、or amount is either determined by a contact-less measurement using optical or radar techniques or by an impact measurement. This type of gauge includes optical disdrometers, impact disdrometers, microwave radar disdrometers, optical/capacitive sensors. 3.6 resolution smallest change in a quantity be

    44、ing measured that causes a perceptible change in the corresponding indication SOURCE: VIM:2008 3.7 step function / heaviside function or unit step function an input signal that switches on at a specified time and stays switched on indefinitely for determining the response (output) of a dynamic instr

    45、ument system 3.8 step response the time-varying response of an instrument system to a step function (heaviside function) 3.9 step response time duration between the instant when an input quantity value of a measuring instrument or measuring system is subjected to an abrupt change between two specifi

    46、ed constant quantity values and the instant when a corresponding indication settles within specified limits around its final steady value SOURCE: VIM:2008 PD CEN/TR 16469:2013CEN/TR 16469:2013 (E) 7 3.10 time constant risetime characterizing the response of a instrument classified as a system of fir

    47、st order response (the way the system responds is approximated by a first order differential equation) Note 1 to entry: It represents the time that the step response of an instrument system takes to reach the (1-1/e)100% 63 % of the final or asymptotic value. 4 Standardization of RI raingauge calibr

    48、ation and field requirements An RI international intercomparison organised by the WMO was conducted in a laboratory and in the field. The results have been published as IOM series (Instruments and Observing Methods), respectively the IOM 84 (RI laboratory intercomparison, 2004-2005) and IOM99 (RI Fi

    49、eld intercomparison, 2007-2009). This concluded that a standardization of RI measurements is recommended, in terms of uncertainty evaluation for laboratory calibration and field measurements in order to improve the measurement accuracy of meteorological network instruments. This should be based on the achievable RI measurement performance (accuracy) rather than on the involved measuring principle or gauge design/technical solutions. The following activities are recommended. a) The WMO procedure, or similar, adopted for performing calibratio


    注意事项

    本文(CEN TR 16469-2013 Hydrometry - Measurement of the rainfall intensity (liquid precipitation) requirements calibration methods and field measurements《液体比重测定法 降雨强度的测量(液相沉淀) 要求 校准方法和实地.pdf)为本站会员(amazingpat195)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开