欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    BS PD 8010-3-2009 Code of practice for pipelines – nPart 3 Steel pipelines on land – nGuide to the application of pipeline risk nassessment to proposed developments nin the vicinig.pdf

    • 资源ID:588653       资源大小:488.88KB        全文页数:64页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    BS PD 8010-3-2009 Code of practice for pipelines – nPart 3 Steel pipelines on land – nGuide to the application of pipeline risk nassessment to proposed developments nin the vicinig.pdf

    1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI British StandardsWB9423_BSI_StandardColCov_noK_AW:BSI FRONT COVERS 5/9/08 12:55 Page 1PUBLISHED DOCUMENTCode of practice for pipelines Part 3: Steel pipelines on land Guide to the application of pipe

    2、line risk assessment to proposed developments in the vicinity of major accident hazard pipelines containing flammables Supplement to PD 80101:2004PD 8010-3:2009This publication is not to be regarded as a British Standard. See Foreword for further information.Licensed Copy: Wang Bin, ISO/EXCHANGE CHI

    3、NA STANDARDS, 12/05/2009 07:30, Uncontrolled Copy, (c) BSIPD 8010-3:2009 PuBliSheD DocumenTPublishing and copyright informationThe BSi copyright notice displayed in this document indicates when the document was last issued. BSi 2008iSBn 978 0 580 61732 4icS 23.040.10, 75.200 The following BSi refere

    4、nces relate to the work on this standard: committee reference PSe/17/2 Draft for comment 07/30138021 DcPublication historyFirst published December 2008Amendments issued since publicationDate Text affected Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 12/05/2009 07:30, Uncontrolled Copy, (c)

    5、 BSIPuBliSheD DocumenT BSI 2008 iPD 8010-3:2009ContentsForeword iiiintroduction 11 Scope 32 normative references 33 Abbreviations 34 Risk assessment of buried pipelines overview 45 Failure of hazardous gas or liquid pipelines 56 individual risk assessment 137 Societal risk assessment 158 Factors aff

    6、ecting risk levels 19AnnexesAnnex A (informative) Summary of hSe methodology for provision of advice on planning developments in the vicinity of major accident hazard pipelines in the uK 28Annex B (informative) Failure frequencies for uK pipelines 33Annex c (informative) example of a site-specific r

    7、isk assessment 47Bibliography 53List of figuresFigure 1 overview of PD 8010-3 2Figure 2 event tree for the failure of a hazardous pipeline 6Figure 3 Risk calculation flowchart for flammable substances 8Figure 4 calculation of pipeline length affecting an individual in the vicinity of a pipeline 14Fi

    8、gure 5 Framework for the tolerability of individual risk 15Figure 6 Societal risk FN criterion line applicable to 1 km of pipeline 17Figure 7 Site-specific pipeline interaction distance 18Figure 8 Reduction in external interference total failure frequency due to design factor 22Figure 9 Reduction in

    9、 external interference total failure frequency due to wall thickness 23Figure 10 Reduction in external interference total failure frequency due to depth of cover 24Figure 11 indicative reduction in external interference total failure frequency due to surveillance frequency (dependent on frequency an

    10、d duration of unauthorized excavations) 24Figure A.1 Planning application process and need for site-specific risk assessment 30Figure B.1 Generic predicted pipeline failure frequencies for third-party interference 35Figure B.2 FFReQ predictions of total external interference failure frequency for uK

    11、oPA pipe cases 39Figure B.3 FFReQ predictions of external interference rupture frequency for uKoPA pipe cases 40Figure B.4 FFReQ predictions for external interference rupture and leak frequencies for specific diameter and wall thickness cases (per 1 000 kmy) 41Figure c.1 Proposed development 47Figur

    12、e c.2 Risk for outside exposure 50Figure c.3 Societal risk FN curves and PD 8010-3 FN criterion line proposed development before and after slabbing 50Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 12/05/2009 07:30, Uncontrolled Copy, (c) BSIPD 8010-3:2009ii BSI 2008PuBliSheD DocumenTList of

    13、tablesTable 1 Range of applicability of reduction factor for design factor, Rdf, and reduction factor due to wall thickness, Rwt23Table 2 Failure frequency reduction factors, Rp, for pipeline protection 25Table A.1 Typical (1 106) and (0.3 106) risk distances for ethylene, spiked crude and natural g

    14、as liquids (nGls) 31Table B.1 Failure rates for uK pipelines based on uKoPA data 33Table B.2 Failure frequency due to external interference vs. diameter 34Table B.3 Failure frequency due to external interference vs. wall thickness 34Table B.4 comparison of external interference failure frequency est

    15、imates for example 1 with FFReQ predictions 36Table B.5 comparison of external interference failure frequency estimates for example 2 with FFReQ predictions 37Table B.6 comparison of external interference failure frequency estimates for example 3 with FFReQ predictions 37Table B.7 uKoPA pipe cases 3

    16、8Table B.8 FFReQ predictions for total external interference failure frequency for pipe cases defined in Table B.7 (per 1 000 kmy) 39Table B.9 FFReQ predictions for external interference rupture frequency for pipe cases defined in Table B.7 (per 1 000 kmy) 40Table B.10 FFReQ predictions for external

    17、 interference rupture and leak frequencies for pipe cases defined in Table B.7 (per 1 000 kmy) 41Table B.11 comparison of external interference failure frequency estimates for example 5 with FFReQ predictions 43Table B.12 critical defect lengths and equivalent hole diameters for uKoPA pipeline cases

    18、 operating at a design factor of 0.72 44Table B.13 Failure frequency due to external corrosion 44Table B.14 material and construction failure frequency vs. wall thickness 45Table B.15 Pipeline rupture failure frequency due to due to ground movement caused by natural landsliding 46Summary of pagesThi

    19、s document comprises a front cover, an inside front cover, pages i to iv, pages 1 to 56, an inside back cover and a back cover.Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 12/05/2009 07:30, Uncontrolled Copy, (c) BSIPuBliSheD DocumenT BSI 2008 iiiPD 8010-3:2009ForewordPublishing informatio

    20、nThis part of PD 8010 was published by BSi and came into effect on 1 January 2009. it was prepared by Subcommittee PSe/17/2, Pipeline transportation systems, under the authority of Technical committee PSe/17, Materials and equipment for petroleum. A list of organizations represented on this committe

    21、e can be obtained on request to its secretary.Relationship with other publicationsPD 8010-3 is a new part of the PD 8010 series, and should be read in conjunction with PD 8010-1. The series comprises:Part 1: Steel pipelines on land;Part 2: Subsea pipelines;Part 3: Steel pipelines on land Guide to th

    22、e application of pipeline risk assessment to proposed developments in the vicinity of major accident hazard pipelines containing flammables Supplement to PD 80101:2004.Information about this documentThis part of PD 8010 includes worked examples and benchmark solutions that can be used as a basis for

    23、 specific studies.Use of this documentAs a code of practice, this part of PD 8010 takes the form of guidance and recommendations. it should not be quoted as if it were a specification and particular care should be taken to ensure that claims of compliance are not misleading.Any user claiming complia

    24、nce with this part of PD 8010 is expected to be able to justify any course of action that deviates from its recommendations.As with any risk assessment, judgement has to be employed by the risk assessor at all stages of the assessment. This part of PD 8010 is intended to support the application of e

    25、xpert judgement. The final responsibility for the risk assessment lies with the assessor, and it is essential that the assessor is able to justify every key assumption made in the assessment and that these assumptions are documented as part of the assessment.Presentational conventionsThe provisions

    26、in this Published Document are presented in roman (i.e. upright) type. its recommendations are expressed in sentences in which the principal auxiliary verb is “should”.Commentary, explanation and general informative material is presented in smaller italic type, and does not constitute a normative el

    27、ement.Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 12/05/2009 07:30, Uncontrolled Copy, (c) BSIPD 8010-3:2009iv BSI 2008PuBliSheD DocumenTContractual and legal considerationsThis publication does not purport to include all the necessary provisions of a contract. users are responsible for i

    28、ts correct application. Compliance with a Published Document cannot confer immunity from legal obligations.Attention is particularly drawn to the Pipelines Safety Regulations 1996 1 and to the requirements for risk assessments in uK health and safety legislation, in particular:the health and Safety

    29、at Work etc Act 1974 2; the management of health consequence modelling; standard assumptions to be applied in the risk assessment methodology for land use planning zones;conducting site-specific risk assessments; risk reduction factors to be applied for mitigation methods; benchmark results for indi

    30、vidual and societal risk levels. This part of PD 8010 provides guidance for the risk assessment of developments in the vicinity of major hazard pipelines containing flammable substances notified under the Pipelines Safety Regulations 1996 1. it does not cover toxic substances which are also notified

    31、 under these Regulations. The guidance is specific to the calculation of safety risks posed to developments in the vicinity of uK major accident hazard pipelines, but the principles of the risk calculation are generally applicable. The use of such risk assessments to determine the acceptability of d

    32、evelopments in accordance with land use planning applied in Great Britain is discussed in Annex A. The guidance does not cover environmental risks. An overview of the document content is given in Figure 1.The guidance in this part of PD 8010 is provided for the benefit of pipeline operators, local p

    33、lanning authorities, developers and any person involved in the risk assessment of developments in the vicinity of existing major accident hazard pipelines. it is based on the established best practice methodology for pipeline risk assessment, and is intended to be applied by competent risk assessmen

    34、t practitioners.For significant developments or infringements the pipeline operator might wish to carry out risk assessment using societal risk analysis for comparison with suitable risk criteria to allow the operator to assess whether the risks remain within acceptable limits. clause 7 describes th

    35、e application of societal risk, and includes a recommended FN criterion line.Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 12/05/2009 07:30, Uncontrolled Copy, (c) BSIPD 8010-3:20092 BSI 2008PuBliSheD DocumenTFigure 1 Overview of PD 8010-3ScopeSafety risks causedby flammablesubstances onlyC

    36、lause 1Consequences:PredictionProbability ofignitionThermal radiationand effectsFailure of a gas or liquidpipelineEvent treePrediction of failurefrequency5.35.45.5Calculation ofrisk and riskcriteriaIndividualSocietalFactors affecting risk levelsFailure frequencyFailure frequency reductionfactorsImpl

    37、ementation of risk mitigationmeasuresSupporting annexes:Summary of HSE methodology for theprovision of land use planning advice in thevicinity of UK MAHPsFailure frequencies for UK pipelinesExample of a site-specific risk assessmentClause 6Clause 7Annex AAnnex B Annex CClause 88.18.2, Annex B8.35.15

    38、.2, 8.2Annex BRisk assessment of buriedpipelinesClause 4Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 12/05/2009 07:30, Uncontrolled Copy, (c) BSIPuBliSheD DocumenT BSI 2008 3PD 8010-3:20091 ScopeThis part of PD 8010 provides a recommended framework for carrying out an assessment of the acu

    39、te safety risks associated with a major accident hazard pipeline (mAhP) containing flammable substances. it provides guidance on the selection of pipeline failure frequencies and the modelling of failure consequences for the prediction of individual and societal risks.The principles of this part of

    40、PD 8010 are based on best practice for the quantified risk analysis of new pipelines and existing pipelines. it is not intended to replace or duplicate existing risk analysis methodology, but is intended to support the application of the methodology and provide recommendations for its use.This part

    41、of PD 8010 is applicable to buried pipelines on land that can be used to carry category D and category e substances that are hazardous by nature, being flammable and therefore liable to cause harm to persons. The guidance does not cover environmental risks.2 Normative referencesThe following referen

    42、ced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies.PD 8010-1:2004, Code of practice for pipelines Part 1: Steel pipelines

    43、on landiGe/TD/1 edition 4:2001, Steel pipelines for high pressure gas transmission1)3 AbbreviationsFor the purposes of this part of PD 8010, the following abbreviations apply.AlARP as low as reasonably practicableFFReQ methodology recommended by uKoPA for prediction of pipeline failure frequencies d

    44、ue to external interferencehSe health and Safety executivelFG liquefied flammable gases, including liquefied petroleum gases (lPG), liquefied natural gas (lnG), and natural gas liquids (nGl)mAhP major accident hazard pipelinemAoP maximum allowable operating pressuremDoB minimum distance to occupied

    45、buildingPoF probability of failureSmYS specified minimum yield strength1)institution of Gas engineers and managers (formerly institution of Gas engineers) (iGe) standards are available from the institution of Gas engineers and managers, charnwood Wing, holywell Park, Ashby Road, loughborough, leices

    46、tershire le11 3Gh.Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 12/05/2009 07:30, Uncontrolled Copy, (c) BSIPD 8010-3:20094 BSI 2008PuBliSheD DocumenTTdu thermal dose unitsTS tensile strengthuKoPA united Kingdom onshore Pipeline operators AssociationVce vapour cloud explosion4 Risk assessme

    47、nt of buried pipelines OverviewThe failure of a pipeline containing a flammable substance (which can be a gas, a liquid, a dense-phase supercritical fluid or a two- or three-phase fluid) has the potential to cause serious damage to the surrounding population, property and the environment. Failure ca

    48、n occur due to a range of potential causes, including accidental damage, corrosion, fatigue and ground movement. The acute safety consequences of such a failure are primarily due to the thermal radiation from an ignited release, whether directly (from the main release) or indirectly (from secondary

    49、fires).Quantified risk assessment applied to a pipeline involves the numerical estimation of risk by calculation resulting from the frequencies and consequences of a complete and representative set of credible accident scenarios.in general terms, a quantified risk assessment of a hazardous gas or liquid pipeline consists of the following stages:gathering data (pipeline and its location, meteorological a) conditions, physical properties of the sub


    注意事项

    本文(BS PD 8010-3-2009 Code of practice for pipelines – nPart 3 Steel pipelines on land – nGuide to the application of pipeline risk nassessment to proposed developments nin the vicinig.pdf)为本站会员(registerpick115)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开