欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    BS EN 61810-2-1-2011 Electromechanical elementary relays Reliability Procedure for the verification of B10 values《基础机电继电器 可靠性 B10值的确认规程 》.pdf

    • 资源ID:577843       资源大小:1.15MB        全文页数:22页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    BS EN 61810-2-1-2011 Electromechanical elementary relays Reliability Procedure for the verification of B10 values《基础机电继电器 可靠性 B10值的确认规程 》.pdf

    1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI Standards PublicationElectromechanical elementary relaysPart 2-1: Reliability Procedure for the verification of B10 valuesBS EN 61810-2-1:2011Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 22

    2、/08/2011 07:24, Uncontrolled Copy, (c) BSINational forewordThis British Standard is the UK implementation of EN 61810-2-1:2011. It is identical to IEC 61810-2-1:2011.The UK participation in its preparation was entrusted to Technical Committee EPL/94, General purpose relays and reed contact units.A l

    3、ist of organizations represented on this committee can be obtained on request to its secretary.This publication does not purport to include all the necessary provisions of a contract. Users are responsible for its correct application. BSI 2011ISBN 978 0 580 73984 2 ICS 29.120.70Compliance with a Bri

    4、tish Standard cannot confer immunity from legal obligations.This British Standard was published under the authority of the Standards Policy and Strategy Committee on 30 June 2011.Amendments issued since publicationAmd. No. Date Text affectedBRITISH STANDARDBS EN 61810-2-1:2011Licensed Copy: Wang Bin

    5、, ISO/EXCHANGE CHINA STANDARDS, 22/08/2011 07:24, Uncontrolled Copy, (c) BSIEUROPEAN STANDARD EN 61810-2-1 NORME EUROPENNE EUROPISCHE NORM April 2011 CENELEC European Committee for Electrotechnical Standardization Comit Europen de Normalisation Electrotechnique Europisches Komitee fr Elektrotechnisc

    6、he Normung Management Centre: Avenue Marnix 17, B - 1000 Brussels 2011 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members. Ref. No. EN 61810-2-1:2011 E ICS 29.120.70 English version Electromechanical elementary relays - Part 2-1: Reliability - Pr

    7、ocedure for the verification of B10 values (IEC 61810-2-1:2011) Relais lectromcaniques lmentaires - Partie 2-1: Fiabilit - Procdure de vrification des valeurs de B10 (CEI 61810-2-1:2011) Elektromechanische Elementarrelais - Teil 2-1: Funktionsfhigkeit (Zuverlssigkeit) - Verfahren zum Nachweis der B1

    8、0-Werte (IEC 61810-2-1:2011) This European Standard was approved by CENELEC on 2011-04-01. CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-da

    9、te lists and bibliographical references concerning such national standards may be obtained on application to the Central Secretariat or to any CENELEC member. This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under

    10、 the responsibility of a CENELEC member into its own language and notified to the Central Secretariat has the same status as the official versions. CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic, Denmark, Estonia, Finla

    11、nd, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland and the United Kingdom. BS EN 61810-2-1:2011Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 2

    12、2/08/2011 07:24, Uncontrolled Copy, (c) BSIEN 61810-2-1:2011 - 2 - Foreword The text of document 94/317/FDIS, future edition 1 of IEC 61810-2-1, prepared by IEC TC 94, All-or-nothing electrical relays, was submitted to the IEC-CENELEC parallel vote and was approved by CENELEC as EN 61810-2-1 on 2011

    13、-04-01. This standard is to be used in conjunction with EN 61810-2:2011. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. CEN and CENELEC shall not be held responsible for identifying any or all such patent rights. The following da

    14、tes were fixed: latest date by which the EN has to be implemented at national level by publication of an identical national standard or by endorsement (dop) 2012-01-01 latest date by which the national standards conflicting with the EN have to be withdrawn (dow) 2014-04-01 Annex ZA has been added by

    15、 CENELEC. _ Endorsement notice The text of the International Standard IEC 61810-2-1:2011 was approved by CENELEC as a European Standard without any modification. _ BS EN 61810-2-1:2011Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 22/08/2011 07:24, Uncontrolled Copy, (c) BSI- 3 - EN 61810-2-

    16、1:2011 Annex ZA (normative) Normative references to international publications with their corresponding European publications The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the l

    17、atest edition of the referenced document (including any amendments) applies. NOTE When an international publication has been modified by common modifications, indicated by (mod), the relevant EN/HD applies. Publication Year Title EN/HD Year IEC 61810-1 2008 Electromechanical elementary relays - Part

    18、 1: General requirements EN 61810-1 2008 IEC 61810-2 2011 Electromechanical elementary relays - Part 2: Reliability EN 61810-2 2011 IEC 62061 2005 Safety of machinery - Functional safety of safety-related electrical, electronic and programmable electronic control systems EN 62061 + corr. February 20

    19、05 2010 ISO 13849-1 2006 Safety of machinery - Safety-related parts of control systems - Part 1: General principles for design EN ISO 13849-1 2008 BS EN 61810-2-1:2011Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 22/08/2011 07:24, Uncontrolled Copy, (c) BSI 2 61810-2-1 IEC:2011 CONTENTS INT

    20、RODUCTION . 5 1 Scope . . 6 2 Normative references . 6 3 Terms and definitions . 6 4 Verification of B107 4.1 General . 7 4.2 Requirements . 7 4.2.1 Test specimens 7 4.2.2 Test circuit 7 4.2.3 Contact loads . 7 4.2.4 Environmental conditions 7 4.2.5 Operating conditions 8 4.2.6 Failure criteria 8 4.

    21、3 Performance of the tests . 8 4.3.1 Conformity test . 8 4.3.2 Periodic test . 8 5 Evaluation and verification of B10d9 5.1 General . 9 5.2 Requirements . . 10 5.2.1 Test specimens . 10 5.2.2 Test circuit . 10 5.2.3 Contact loads . 10 5.2.4 Environmental conditions 10 5.2.5 Operating conditions 10 5

    22、.2.6 Failure criteria 10 5.3 Performance of the tests . 11 5.3.1 Conformity test . 11 5.3.2 Periodic test . 11 Annex A (informative) Example illustrating the assessment of malfunctions for B10devaluation 15 Bibliography . 17 Figure 1 Schematic flowchart 13 Figure 2 Schematic flowchart for relays whe

    23、re dangerous failures have to be assessed . 14 Table A.1 Example with number of cycles at which malfunctions have been recorded . . 15 BS EN 61810-2-1:2011Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 22/08/2011 07:24, Uncontrolled Copy, (c) BSI61810-2-1 IEC:2011 5 INTRODUCTION Based on the

    24、 general provisions of IEC 61810-2, this standard specifies reliability test procedures for electromechanical elementary relays where enhanced requirements for the verification of reliability apply. An initial conformity test is passed and then confirmed by periodic tests with specified periodicity.

    25、 This standard describes how figures for B10(the mean number of cycles until 10 % of the relays have failed) are derived from these life tests performed with representative relay samples. In particular when electromechanical elementary relays are intended to be incorporated in safety-related control

    26、 systems of machinery in accordance with IEC 62061 and ISO 13849-1, the mean time to dangerous failure (MTTFd) is a measure that can be taken into account when assessing the probability of dangerous failure of the safety function concerned. Although a component failure cannot be defined as “dangerou

    27、s” unless the detailed application is known, it is common to consider a failure mode that is likely to result in danger in a typical application of the component, and to refer to this failure mode as a “dangerous failure”. The MTTFdthen becomes the expectation of the mean time to failure in this “da

    28、ngerous“ mode. For the calculation of MTTFdfor electromechanical relays the data provided by the manufacturer for B10dcan be used (see C.4 of ISO 13849-1:2006). Electromechanical elementary relays with forcibly guided (mechanically linked) contacts offer the possibility of a high diagnostic coverage

    29、 according to 4.5.3 of ISO 13849-1:2006. NOTE Requirements for such relays are given in EN 50205. BS EN 61810-2-1:2011Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 22/08/2011 07:24, Uncontrolled Copy, (c) BSI 6 61810-2-1 IEC:2011 ELECTROMECHANICAL ELEMENTARY RELAYS Part 2-1: Reliability Pro

    30、cedure for the verification of B10values 1 Scope This part of IEC 61810 specifies reliability test procedures for electromechanical elementary relays when enhanced requirements for the verification of reliability apply. Particular provisions are given for relays incorporated in safety-related contro

    31、l systems of machinery in accordance with IEC 62061 and ISO 13849-1. For such relays B10values for dangerous failures (B10dvalues) are derived from the tests specified in this standard. This International Standard is only intended to be used in conjunction with IEC 61810-2. 2 Normative references Th

    32、e following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. IEC 61810-1:2008, Electromechanical elementary rela

    33、ys Part 1: General requirements IEC 61810-2:2011, Electromechanical elementary relays Part 2: Reliability IEC 62061:2005, Safety of machinery Functional safety of safety-related electrical, electronic and programmable electronic control systems ISO 13849-1:2006, Safety of machinery Safety-related pa

    34、rts of control systems Part 1: General principles for design 3 Terms and definitions For the purposes of this document, the terms and definitions given in the IEC 61810-2, as well as the following apply. 3.1 dangerous failure failure which has the potential to put the safety-related part of a contro

    35、l system in a hazardous or fail-to-function state ISO 13849-1:2006, 3.1.5, modified 3.2 conformity test test of a sample of relays made to a given design to verify that these relays comply with the specified requirements 3.3 periodic test test carried out periodically on a sample of relays drawn fro

    36、m running production BS EN 61810-2-1:2011Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 22/08/2011 07:24, Uncontrolled Copy, (c) BSI61810-2-1 IEC:2011 7 NOTE The results from periodic tests are used to verify that the level of technical performance is maintained. 4 Verification of B104.1 Gen

    37、eral This clause specifies requirements where the reliability of the relay has to be assessed and verified. This procedure is applicable to relays where wearout mechanisms prevail. NOTE 1 For relays where random failures prevail, provisions are under consideration. NOTE 2 For relays intended to be u

    38、sed in safety-related control systems of machinery, the provisions of Clause 5 are applicable. The following failure modes can occur: failure to open of a relay contact; failure to close of a relay contact; unintended bridging of a changeover contact; insulation failure of the relay. From a conformi

    39、ty test, a value for B10is obtained that indicates the probability of the occurrence of a relay failure. The value for B10is given in numbers of cycles. NOTE 3 With the knowledge of the frequency of operation (cycling rate) of the relay within a specific application the number of cycles can be trans

    40、formed into respective times. Verification that this B10value is applicable to relays from the series production shall be carried out by periodic tests. An overview of this procedure is given in Figure 1. 4.2 Requirements 4.2.1 Test specimens The test shall be carried out with 10 relays in accordanc

    41、e with IEC 61810-2. 4.2.2 Test circuit The test circuit described in Annex C of IEC 61810-1:2008 shall be used, unless otherwise specified by the manufacturer and explicitly indicated in the test report. When feasible, one of the circuits in accordance with Annex D of IEC 61810-1:2008 is to be used.

    42、 4.2.3 Contact loads The contact loads shall be specified by the manufacturer and indicated in the test report. It is recommended to select appropriate resistive loads according to 5.7 of IEC 61810-1:2008 or inductive loads according to Annex B of IEC 61810-1:2008. 4.2.4 Environmental conditions The

    43、 conditions of Table 1 of IEC 61810-1:2008 apply. However, an extended ambient temperature range of 18 C to 40 C is permitted. BS EN 61810-2-1:2011Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 22/08/2011 07:24, Uncontrolled Copy, (c) BSI 8 61810-2-1 IEC:2011 4.2.5 Operating conditions The p

    44、rovisions of 5.3 of IEC 61810-2:2011 apply. Unless otherwise specified by the manufacturer, each cycle of the coil energization shall be 1 s ON and 9 s OFF. The test is performed without coil suppression, unless explicitly specified. 4.2.6 Failure criteria Generally the test is to be continued until

    45、 all test specimens have failed. When the test is truncated at a specific number of cycles, all relays that have not yet failed are considered to fail at that number of cycles (worst case assumption). However, at least 7 of the tested relays shall fail physically. For the assessment of recorded malf

    46、unctions severity B according to Clause 6 of IEC 61810-2:2011 applies. The dielectric test is performed: between coil and contacts; between adjacent contacts; across open contacts. NOTE A contact that fails to open cannot be tested for compliance with the requirements for open contacts. The verifica

    47、tion of insulation requirements according to Clause 11 of IEC 61810-1:2008 (with 75 % of the initial voltage for the dielectric test specified under 10.3 of IEC 61810-1:2008) may be performed in either of the following ways: a) during the test, the dielectric test is performed periodically at given

    48、numbers of cycles. When the relay does not pass the dielectric test, the number of cycles for the previous dielectric test that has been passed is considered as the cycles to failure value for this individual relay; b) in the case that no periodical monitoring according to item a) is performed, the

    49、dielectric test shall be made when a relay under test fails due to a functional contact failure (see 4.1). If the relay does not comply with the dielectric test, the whole test is not passed. The same applies when the test is truncated at a certain number of cycles. 4.3 Performance of the tests 4.3.1 Conformity test The conformity test is carried out with a sample of 10 relays. Each failure shall be recorded. The B10value is evaluated based on the procedure given in IE


    注意事项

    本文(BS EN 61810-2-1-2011 Electromechanical elementary relays Reliability Procedure for the verification of B10 values《基础机电继电器 可靠性 B10值的确认规程 》.pdf)为本站会员(tireattitude366)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开