1、BS EN 1253-3:2016Gullies for buildingsPart 3: Evaluation of conformityIncorporating corrigendum February 2017BSI Standards PublicationWB11885_BSI_StandardCovs_2013_AW.indd 1 15/05/2013 15:06BS EN 1253-3:2016 BRITISH STANDARDNational forewordThis British Standard is the UK implementation of EN 1253-3
2、:2016. It supersedes BS EN 1253-3:1999 which is withdrawn.The UK participation in its preparation was entrusted by Technical Committee B/505, Wastewater engineering to SubcommitteeA list of organizations represented on this subcommittee can be obtained on request to its secretary.This publication do
3、es not purport to include all the necessary provisions of a contract. Users are responsible for its correct application. The British Standards Institution 2017.Published by BSI Standards Limited 2017ISBN 978 0 580 97504 2 ICS 91.140.80 Compliance with a British Standard cannot confer immunity from l
4、egal obligations.This British Standard was published under the authority of the Standards Policy and Strategy Committee on 31 May 2016.Amendments/corrigenda issued since publicationDate T e x t a f f e c t e d28 February 2017 Implementation of CEN/CENELEC CorrectionNotice 8 June 2016: Correction mad
5、e to Table A.2B/505/11, Waste Fittings For Sanitary Appliances.BS EN 1253-3:2016EUROPEAN STANDARD NORME EUROPENNE EUROPISCHE NORM EN 1253-3 May 2016 ICS 91.140.80 Supersedes EN 1253-3:1999English Version Gullies for buildings - Part 3: Evaluation of conformity Avaloirs et siphons pour btiments - Par
6、tie 3: valuation de la conformit Ablufe fr Gebude - Teil 3: Bewertung der Konformitt This European Standard was approved by CEN on 14 February 2016. CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status o
7、f a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC Management Centre or to any CEN member. This European Standard exists in three official versions (English, French, German
8、). A version in any other language made by translation under the responsibility of a CEN member into its own language and notified to the CEN-CENELEC Management Centre has the same status as the official versions. CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Croatia,
9、Cyprus, Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and United
10、 Kingdom. EUROPEAN COMMITTEE FOR STANDARDIZATION COMIT EUROPEN DE NORMALISATION EUROPISCHES KOMITEE FR NORMUNG CEN-CENELEC Management Centre: Avenue Marnix 17, B-1000 Brussels 2016 CEN All rights of exploitation in any form and by any means reserved worldwide for CEN national Members. Ref. No. EN 12
11、53-3:2016 EBS EN 1253-3:2016EN 1253-3:2016 (E) 2 Contents Page European foreword . 3 1 Scope 4 2 Normative references 4 3 Terms and definitions . 4 4 Evaluation of conformity 4 4.1 General 4 4.2 Type testing . 4 4.3 Factory production control . 4 Annex A (informative) Control by third party (third p
12、arty control) . 8 A.1 General 8 A.2 Procedure of the third party control 8 A.3 Report by the third party . 9 A.4 Retesting 10 A.5 Non-conforming products . 10 Bibliography . 11 BS EN 1253-3:2016EN 1253-3:2016 (E) 3 European foreword This document (EN 1253-3:2016) has been prepared by Technical Commi
13、ttee CEN/TC 165 “Waste water engineering”, the secretariat of which is held by DIN. This European Standard shall be given the status of a national standard, either by publication of an identical text or by endorsement, at the latest by November 2016, and conflicting national standards shall be withd
14、rawn at the latest by November 2016. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. CEN and/or CENELEC shall not be held responsible for identifying any or all such patent rights. This document supersedes EN 1253-3:1999. This is
15、the third part in EN 1253, a series of standards relating to different types of floor gullies, roof drains and access covers for drainage systems inside buildings. The EN 1253 series under the main title Gullies for buildings actually consists of the following parts: Part 1: Trapped floor gullies wi
16、th a depth water seal of at least 50 mm; Part 2: Roof drains and floor gullies without trap; Part 3: Evaluation of conformity; Part 4: Access covers; Part 5: Gullies with light liquids closure. Since the latest edition of EN 1253-3 the most significant technical changes are the following: a) introdu
17、ction of the new standards on trapped floor gullies with a depth of water seal of at least 50 mm (EN 1253-1) and roof drains and floor gullies without trap (EN 1253-2); b) amendment of items to be inspected as well as modification of frequency of control for specific requirements. According to the C
18、EN/CENELEC Internal Regulations, the national standards organizations of the following countries are bound to implement this European Standard: Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hung
19、ary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom. BS EN 1253-3:2016EN 1253-3:2016 (E) 4 1 Scope This European Standard specifies the requirements for evalu
20、ation of conformity for floor gullies, roof drains and access covers for buildings to ensure conformity of these products with EN 12531, EN 1253-2 and EN 12534. 2 Normative references The following documents, in whole or in part, are normatively referenced in this document and are indispensable for
21、its application. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. EN 12531:2015, Gullies for buildings Part 1: Trapped floor gullies with a depth water seal of at least 50 mm EN 1253-2:2015
22、, Gullies for buildings Part 2: Roof drains and floor gullies without trap EN 12534:2016, Gullies for buildings Part 4: Access covers 3 Terms and definitions For the purposes of this document, the terms and definitions given in EN 1253-1, EN 1253-2 and EN 12534 apply. 4 Evaluation of conformity 4.1
23、General Products manufactured in accordance with EN 12531, EN 12532 and EN 12534 will be subjected to the evaluation of conformity procedure as follows: a) type testing; b) factory production control. The control by a third party is recommended. If third party control is carried out, this should be
24、done in accordance with Annex A. The actual practice of third party control in the different countries may be maintained as long as the third party control in this standard retains its recommended character. 4.2 Type testing Complete drawings of the products shall be available. Three production spec
25、imens shall be tested in accordance with EN 1253-1, EN 12532 and EN 12534 and shall comply with all the relevant requirements of EN 12531, EN 1253-2 and EN 12534. This procedure also applies if the design is subsequently amended structurally or if the material is changed. All subsequent amendments,
26、whether structural or not, shall have the approval of the certification body, if required. 4.3 Factory production control The purpose of the factory production control is to constantly ensure that current production of floor gullies, roof drains and access covers is in conformity with the technical
27、requirements of EN 12531, EN 1253-2, and EN 12534. BS EN 1253-3:2016EN 1253-3:2016 (E) 5 Suitable staff and independence of quality control of production are indispensable prerequisites. The facilities necessary for factory production control include the measuring and test equipment for the tests in
28、 accordance with EN 1253-1, EN 12532 and EN 12534. The factory production control shall at least cover the specific items listed in Tables 1, 2 and 3. The documentation shall include all steps of production from the incoming raw materials to the final product leaving the factory. The factory product
29、ion control may be organized in accordance with EN ISO 9001. The manufacturer shall have at his disposal: an organization scheme with defined responsibilities; skilled personnel; all the necessary production facilities; all the necessary testing facilities. Furthermore, the manufacturer shall establ
30、ish and maintain a quality plan in which process and final inspections are listed. Apart from the inspection aspect, the quality plan shall also contain the method and frequency of inspection and the documentation. Tables 1, 2 and 3 give a model scheme of factory production control and list a minimu
31、m of specific items to be covered. Finally, the manufacturer shall establish and maintain written procedures for: document control; control of non-conforming products, their storage, handling and marking; dealing with complaints from customers; calibration and control of measuring and testing equipm
32、ent. BS EN 1253-3:2016EN 1253-3:2016 (E) 6 Table 1 Factory production control for trapped floor gullies with a depth water seal of at least 50 mm in accordance with EN 12531:2015 Items to be inspected Requirements Test methods Frequency of control Appearance 4.1.2 Visual inspection - At start of pro
33、duction - Each production batchaDimensions 4.1.1 Measurement - At start of production - Each production batcha4.1.5 5.3.1 At start of production 4.1.3 Measurement At start of production 4.2.1 5.4.1 At start of production Materials 4.4 Manufacturers certification of compliance Each consignment Skirt
34、membrane affixed to the gully 4.7.3.4 5.7.3 - At start of production - Random sampling in series production Marking Clause 7 Visual inspection Random sampling in series production Classification by loading strength 4.7.1 5.6 Each production batchaaThe size of a production batch and the number of spe
35、cimens to be taken from the batch depend on the type of products, the material and the manufacturing process. Table 2 Factory production control for roof drains and floor gullies without trap in accordance with EN 12532:2015 Items to be inspected Requirements Test methods Frequency of control Appear
36、ance 4.1.2 Visual inspection - At start of production - Each production batchaDimensions 4.1.1 Measurement - At start of production - Each production batcha4.1.3 Measurement At start of production Materials 4.3 Manufacturers certification of compliance Each consignment Skirt membrane affixed to the
37、gully 4.7.1 5.4.2 - At start of production - Random sampling in series production Marking Clause 7 Visual inspection Random sampling in series production Classification by loading strength 4.5.1 5.3 Each production batchaaThe size of a production batch and the number of specimens to be taken from th
38、e batch depend on the type of products, the material and the manufacturing process. BS EN 1253-3:2016EN 1253-3:2016 (E) 7 Table 3 Factory production control for access covers in accordance with EN 12534:2016 Items to be inspected Requirements Test methods Frequency of control Appearance 6.2 Visual i
39、nspection - At start of production - Each production batchaDimensions 6.3 Measurement - At start of production - Each production batchaMaterials Clause 5 Manufacturers certification of compliance Each consignment Marking Clause 8 Visual inspection Random sampling in series production Classification
40、by loading strength Clause 4 7.1 Each production batchaaThe size of a production batch and the number of specimens to be taken from the batch depend on the type of products, the material and the manufacturing process. BS EN 1253-3:2016EN 1253-3:2016 (E) 8 Annex A (informative) Control by third party
41、 (third party control) A.1 General The purpose of the third party control is to demonstrate the ability of the manufacturer to manufacture products which continuously meet the requirements of EN 12531, EN 1253-2 and EN 12534 and to give independent certification to these products. A.2 Procedure of t
42、he third party control Third party control consists of: approval of type testing; general evaluation of the production and testing facilities as well as suitability of staff; controlling and approval of the system and of the results of the factory production control; independent testing of finished
43、products, covering at least the aspects listed in Tables A.1, A.2 and A.3. Table A.1 Third party control on trapped floor gullies with a depth water seal of at least 50 mm in accordance with EN 12531:2015 Items to be inspected Requirements Test methods Samples to be examined at each visit of inspect
44、or Appearance 4.1.2 Visual inspection At least two specimens with different nominal sizes (DN) of three different typesaof gullies Dimensions 4.1.1 Measurement 4.1.5 5.3.1 4.1.3 Measurement 4.2.1 5.4.1 Materials 4.4 Control of manufacturers certificates of compliance Skirt membrane affixed to the gu
45、lly 4.7.3.4 5.7.3 Marking Clause 7 Visual inspection Classification by loading strength 4.7.1 5.6 aTrapped floor gullies are of the same type, when they have the same design and construction characteristics and when they are of the same material, however they may have different features. BS EN 1253-
46、3:2016EN 1253-3:2016 (E) 9 Table A.2 Third party control for roof drains and floor gullies without trap in accordance with EN 12532:2015 Items to be inspected Requirements Test methods Samples to be examined at each visit of inspector Appearance 4.1.2 Visual inspection At least two specimens with di
47、fferent nominal sizes (DN) of three different typesaof roof drains and floor gullies without trap Dimensions 4.1.1 Measurement 4.1.3 Measurement Materials 4.3 Control of manufacturers certificates of compliance Skirt membrane affixed to the gully 4.7.1 5.4.2 Marking Clause 7 Visual inspection Classi
48、fication by loading strength 4.5.1 5.3 aRoof drains and floor gullies without trap are of the same type, when they have the same design and construction characteristics and when they are of the same material, however they may have different features. Table A.3 Third party control on access covers in
49、 accordance with EN 12534:2016 Items to be inspected Requirements Test methods Samples to be examined at each visit of inspector Appearance 6.2 Visual inspection At least two specimens with different clear openings of three different typesaof access covers, if available Dimensions 6.3 Measurement Materials Clause 5 Control of manufacturers certificates of compliance Marking Clause 8 Visual inspection Classification by loading strength Clause 4 7.1 aAccess covers are of the same type, when they