欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    AASHTO PP 82-2016 Standard Practice for Emulsified Asphalt Chip Seal Design.pdf

    • 资源ID:417940       资源大小:57.50KB        全文页数:4页
    • 资源格式: PDF        下载积分:2000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要2000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    AASHTO PP 82-2016 Standard Practice for Emulsified Asphalt Chip Seal Design.pdf

    1、Standard Practice for Emulsified Asphalt Chip Seal Design AASHTO Designation: PP 82-16 (2018)1Technical Section: 5b, Bridge and Pavement Preservation Release: Group 1 (April) American Association of State Highway and Transportation Officials 444 North Capitol Street N.W., Suite 249 Washington, D.C.

    2、20001 TS-5b PP 82-1 AASHTO Standard Practice for Emulsified Asphalt Chip Seal Design AASHTO Designation: PP 82-16 (2018)1Technical Section: 5b, Bridge and Pavement Preservation Release: Group 1 (April) 1. SCOPE 1.1. This standard practice determines application quantities for applying aggregate chip

    3、s and emulsified asphalt for chip seals. A chip seal is the application of emulsified asphalt, followed immediately by an application of a single layer of cover aggregate, with the option of including a fog seal to help with chip retention. 2. REFERENCED DOCUMENTS 2.1. AASHTO Standards: MP 27, Mater

    4、ials for Emulsified Asphalt Chip Seals T 19M/T 19, Bulk Density (“Unit Weight”) and Voids in Aggregate T 84, Specific Gravity and Absorption of Fine Aggregate T 85, Specific Gravity and Absorption of Coarse Aggregate 2.2. NCHRP Report: NCHRP Report 680, Manual for Emulsion-Based Chip Seals for Pavem

    5、ent Preservation 3. TERMINOLOGY 3.1. Definitions: 3.1.1. badly pocked, porous, oxidizedsevere raveling of surface with much texture. 3.1.2. flushed-bleedingfree asphalt on the pavement surface with little or no texture. 3.1.3. slightly pocked, porous, oxidizedraveling beginning to show with moderate

    6、 texture. 3.1.4. slightly porous, slightly oxidizedlittle or no free asphalt on the surface with noticeable but low texture. 3.1.5. smooth, non-poroussome free asphalt on the pavement surface, but with some texture. 2018 by the American Association of State Highway and Transportation Officials. All

    7、rights reserved. Duplication is a violation of applicable law.TS-5b PP 82-2 AASHTO 4. SIGNIFICANCE AND USE 4.1. This standard practice may be used to determine the quantities of materials required for the construction of emulsified asphalt chip seals. 5. EMULSIFIED ASPHALT CHIP SEAL DESIGN REQUIREME

    8、NTS 5.1. MaterialsEmulsified asphalt and aggregate used in the design should meet MP 27 and be representative of the materials used for the project. 5.1.1. Aggregate ChipsFabricate a board measuring 3 ft by 11/2ft. Three-quarter-in. thick particle board works well for this item. Attach 1-in. by 2-in

    9、. pine wood strips to the edge of the board to create a raised edge. Weigh the completed board and record the weight in pounds. Place the chips to be used on the project on the board. The quantity will vary depending on the gradation, shape, and crushed content of the chips but should be no less tha

    10、n 5 lb and no greater than 25 lb. Try to fit as many chips on the board within the confines of the edging as possible. The chips should not overlap each other and should be only one stone thick. Push the chips against the edge of the board. Place as many chips as possible onto the board until every

    11、gap is filled. Reweigh the board containing the chips in pounds. Subtract the weight of the empty board from the weight of the board with chips. Multiply this value by 2. This is the quantity of chips to be used on the chip seal in pounds per square yard. Record this quantity as Q. 5.1.2. Emulsified

    12、 AsphaltThe emulsified asphalt quantity is estimated by calculating the amount of asphalt needed to fill the voids between the chips to a specific embedment depth. That relationship is expressed as follows: 5.61 162.4Wed T VGAR += (1) where: A = emulsified asphalt quantity, gal/yd2; 5.61 = constant

    13、for converting the units to gal/yd2e = percent embedment from Figure 1 expressed as a decimal; d = average mat depth, 1.33 Q/W; Q = quantity of chips from the board test, lb/yd2; W = dry loose unit weight of chips, pcf (see T 19M/T 19, Section 12 on shoveling); 62.4 = unit weight of water, pcf G = d

    14、ry bulk specific gravity of chips (see T 84 and T 85); T = traffic correction factor from Table 1; V = pavement surface correction factor; and R = emulsified asphalt residue, expressed as a decimal, e. g., 0.65 = 65 percent. The result of the calculation for Equation 1 is the estimated emulsified as

    15、phalt spray rate. Table 1Traffic Correction Factor, T Chip Seal Class I II III AADT 5000 Traffic Correction Factor, T 1.20 1.15 1.10 1.05 1.00 a aGreater than 5000 AADT has not been evaluated sufficiently to develop a recommended traffic correction factor. 2018 by the American Association of State H

    16、ighway and Transportation Officials. All rights reserved. Duplication is a violation of applicable law.TS-5b PP 82-3 AASHTO Figure 1Aggregate Embedment, percent, e (before Rolling) Table 2Substrate Surface Condition, V Existing Surface Condition Correction Factor, V, gal/yd2Flushed-bleedinga0.06 Smo

    17、oth, non-porousa0.03 Slightly porous, slightly oxidized 0.00 Slightly pocked, porous, oxidizedb+0.03 Badly pocked, porous, oxidizedb+0.06 aA quantitative method using the Ball Penetration Test has also been reported in NCHRP Report 680. bA quantitative method using the Sand Patch Test has also been

    18、reported in NCHRP Report 680. 5.1.3. Extra Chips to Avoid Roller Pick-UpMore aggregate should be spread during chip seal construction with emulsified asphalt than is actually needed to produce a one-stone layer. This extra material is applied to aid in reducing the potential for chips to be picked u

    19、p by pneumatic rollers during construction. The amount of excess material will vary, but should be approximately 5 to 10 percent and never more than 10 percent. Adjustment up or down is necessary based on when the rollers begin to pick up the chips. 5.2. All design work will be carried out using agg

    20、regate either directly from the job site stockpile or equivalent material from the same source and having substantially the same material properties. 6. REPORT 6.1. Report the aggregate spread rate, Q, in pounds per square yard to the nearest 1.0 lb/yd2. 6.2. Report the emulsified asphalt spray rate

    21、, A, in gallons per square yard to the nearest 0.01 gal/yd2. 7. KEYWORDS 7.1. Aggregate; aggregate chips; chip seal; emulsified asphalt. 1This provisional standard was first published in 2016. Average Mat Depth, d, in.Aggregate Embedment,percent504540353025200.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 2018 by the American Association of State Highway and Transportation Officials. All rights reserved. Duplication is a violation of applicable law.


    注意事项

    本文(AASHTO PP 82-2016 Standard Practice for Emulsified Asphalt Chip Seal Design.pdf)为本站会员(unhappyhay135)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开