欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    ABS 73 NOTICE 1-2016 GUIDE FOR HULL CONDITION MONITORING SYSTEMS 2015.pdf

    • 资源ID:400947       资源大小:31.21KB        全文页数:2页
    • 资源格式: PDF        下载积分:2000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要2000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    ABS 73 NOTICE 1-2016 GUIDE FOR HULL CONDITION MONITORING SYSTEMS 2015.pdf

    1、 GUIDE FOR HULL CONDITION MONITORING SYSTEMS 2015 15 DECEMBER 2015 NOTICE NO. 1 March 2016 The following changes become EFFECTIVE AS OF 1 MARCH 2016. (See http:/www.eagle.org for the consolidated version of the Guide for Hull Condition Monitoring Systems, 2015, with all Notices and Corrigenda incorp

    2、orated.) Notes - The date in the parentheses means the date that the Rule becomes effective for new construction based on the contract date for construction. (See 1-1-4/3.3 of the ABS Rules for Conditions of Classification (Part 1).) SECTION 2 SYSTEM TYPE REQUIREMENTS 2 HM2 Stress Monitoring 2.2 Hul

    3、l Girder Stress (Revise Subparagraph 2/2.2.3, as follows.) 2.2.3 Sensors (1 March 2016) Measurements of hull girder stresses are generally made with a number of long base strain gauges distributed along the length of the vessel and around its girth. Strain gauges for monitoring Hull Girder stresses

    4、are to be located as close as possible to locations at which the loading manual and loading instrument give bending moment results. Where the gauges cannot be sited at these locations, the method for correlating the strain gauge output to the loading manual and loading instrument locations is to be

    5、submitted for review and included in the operating manual. Where strain gauges are located in areas subject to multiple load mechanisms, means are to be provided for separating out the different stress components. For those gauges located in areas subject to shear lag, compensation is to be made for

    6、 determining the primary hull girder stresses without shear lag. Measurement signals are to be processed and displayed on the bridge for monitoring hull girder loading, and whipping and springing for fatigue damage and extreme loading. The minimum required number and approximate position of the stra

    7、in gauges are indicated below. 2.2.3(a) Tankers, Bulk Carriers and General Cargo Ships: 2 at midships (one port, one starboard on deck) 1 at 25% of the length from the bow (on deck) 1 at 25% of the length from the stern (on deck) ABSGUIDE FOR HULL CONDITION MONITORING SYSTEMS .2015 1 Notice No. 1 Ma

    8、rch 2016 2.2.3(b) Container Ships: 2 at midships (one port, one starboard on deck) 1 at 25% of the length from the bow (on deck) additional strain gauges can be provided at the discretion of the Owner or system supplier. Vessels equipped with strain gauges for hull girder stress monitoring in compliance with 2/2.2.1 to 2/2.2.3 can be assigned an optional notation HS, followed by the number of gauges used. For example, HS4 indicates four strain gauges are installed for the hull girder stress monitoring. 2 ABSGUIDE FOR HULL CONDITION MONITORING SYSTEMS .2015


    注意事项

    本文(ABS 73 NOTICE 1-2016 GUIDE FOR HULL CONDITION MONITORING SYSTEMS 2015.pdf)为本站会员(bonesoil321)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开