欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    ISO 16548-2012 Ships and marine technology - Ship design - General guidance on emergency towing procedures《船舶和海洋技术 船舶设计 应急牵引规程通用指南》.pdf

    • 资源ID:1251613       资源大小:2MB        全文页数:38页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    ISO 16548-2012 Ships and marine technology - Ship design - General guidance on emergency towing procedures《船舶和海洋技术 船舶设计 应急牵引规程通用指南》.pdf

    1、 ISO 2012 Ships and marine technology Ship design General guidance on emergency towing procedures Navires et technologie maritime Conception du navire Directives gnrales sur les procdures de remorquage durgence INTERNATIONAL STANDARD ISO 16548 First edition 2012-10-15 Reference number ISO 16548:2012

    2、(E) ISO 16548:2012(E)ii ISO 2012 All rights reserved COPYRIGHT PROTECTED DOCUMENT ISO 2012 All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm, without p

    3、ermission in writing from either ISO at the address below or ISOs member body in the country of the requester. ISO copyright office Case postale 56 CH-1211 Geneva 20 Tel. + 41 22 749 01 11 Fax + 41 22 749 09 47 E-mail copyrightiso.org Web www.iso.org Published in Switzerland ISO 16548:2012(E) ISO 20

    4、12 All rights reserved iii Contents Page Foreword iv 1 Scope . 1 2 Normative references 1 3 T erms and definitions . 1 4 General description . 2 4.1 General . 2 4.2 Limitation during towing operation . 2 4.3 Masters response . 3 4.4 Safety considerations 3 4.5 Towing preparations 3 5 Decision matrix

    5、 for determining towing pattern . 4 Annex A (informative) Towing patterns and decision matrix 5 Annex B (informative) Procedures for connecting towing lines .12 Annex C (informative) Ship specific data 22 Annex D (informative) Organization of tasks .27 Annex E (informative) Current status .29 Biblio

    6、graphy .32 ISO 16548:2012(E) Foreword ISO (the International Organization for Standardization) is a worldwide federation of national standards bodies (ISO member bodies). The work of preparing International Standards is normally carried out through ISO technical committees. Each member body interest

    7、ed in a subject for which a technical committee has been established has the right to be represented on that committee. International organizations, governmental and non-governmental, in liaison with ISO, also take part in the work. ISO collaborates closely with the International Electrotechnical Co

    8、mmission (IEC) on all matters of electrotechnical standardization. International Standards are drafted in accordance with the rules given in the ISO/IEC Directives, Part 2. The main task of technical committees is to prepare International Standards. Draft International Standards adopted by the techn

    9、ical committees are circulated to the member bodies for voting. Publication as an International Standard requires approval by at least 75 % of the member bodies casting a vote. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. ISO s

    10、hall not be held responsible for identifying any or all such patent rights. ISO 16548 was prepared by Technical Committee ISO/TC8, Ships and marine technology, Subcommittee SC8, Ship design.iv ISO 2012 All rights reserved INTERNATIONAL ST ANDARD ISO 16548:2012(E) Ships and marine technology Ship des

    11、ign General guidance on emergency towing procedures 1 Scope This International Standard gives guidance on towing procedures for cargo ships and passenger ships in emergency situations subject to SOLAS Regulation II-1/3-4. Cargo ships which are constructed on or after 1 January 2010 shall be provided

    12、 with a ship-specific emergency towing procedure and all passenger ships shall be provided with a ship-specific emergency towing procedure by 1 January 2010. For cargo ships constructed before 1 January 2010, they shall be provided with ship-specific emergency towing procedure by 1 January 2012 in a

    13、ccordance with SOLAS (Chapter II-1 Reg. 3-4). 2 Normative references The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any a

    14、mendments) applies. SOLAS Regulation II-1/3-4, Emergency towing arrangements and procedures IMO MSC.1/Circ.1255:2008, Guidelines for Owners/Operators on Preparing Emergency Towing Procedures 3 T erms an d definiti ons For the purposes of this document, the following terms and definitions apply. 3.1

    15、towing ship vessel or boat that manoeuvres vessels by pushing or towing them 3.2 towed ship vessel that is towed or pushed by a towing ship 3.3 emergency towing system ETS s y s t e m ( e q u i p m e n t a n d f i t t i n g s ) f o r e m e r g e n c y t o w i n g f o r l i q u i d c a r g o v e s s

    16、e l s b a s e d o n S O L A S Regulation II-1/3-4 EXAMPLE Chafing chain, towing wire, chain stopper, strong fairlead and pick-up gear etc. 3.4 towing line strong rope that is used by a towing ship for pulling a vessel 3.5 messenger rope rope that is located between the heaving rope and the towing li

    17、ne 3.6 heaving rope rope connected to a messenger rope that is thrown to another vessel in order to prepare for towing ISO 2012 All rights reserved 1 ISO 16548:2012(E) 3.7 cha f ing cha in cha f ing ge a r stud link chain that is long enough to ensure that the towing line remains outside the fairlea

    18、d during the towing operation 4 General description 4.1 General This International Standard is prepared for use in emergency towing situations in accordance with SOLAS Regulation II-1/3-4 and related IMO MSC.1/Circ.1255. 4.1.1 The following information is included in this International Standard: a)

    19、Drawings of fore and aft deck showing emergency towing arrangements; b) Inventory of equipment on board that can be used for emergency towing; c) Means and methods of communication; d) Sample procedures to facilitate the preparation for and the conducting of emergency towing; e) Organization of task

    20、s; and f) Communication plan listing all information that is required to be communicated to the towing ship. 4.1.2 A minimum of three copies should be kept on board and located in the following locations: a) The bridge; b) A forecastle space; and c) The ships office or cargo control room. 4.1.3 Owne

    21、rs, operators and crew should take into consideration that the nature of an emergency does not allow time for deliberation. Accordingly, the procedures should be practiced beforehand. 4.2 Limitation during towing operation 4.2.1 Not all ships have the same degree of shipboard equipment, so there may

    22、 be limits to possible towing procedures. Nevertheless, the intention of this International Standard is to predetermine what can be accomplished. 4.2.2 The towing load should not exceed the safe working loads of deck fittings and the allowable working load of that deck structure as shown in Figures

    23、C.1 and C.2. When heavy weather which will significantly increase the towing load is forecasted, special considerations are to be paid to the towing speed, towing line arrangement, and the ships stability. 4.2.3 The loading points on stand-rollers are so high that great bending moments are generally

    24、 transferred to the supporting structures. Consequently, stand-rollers are not to be used in towing line arrangement as far as practicable.2 ISO 2012 All rights reserved ISO 16548:2012(E) 4.3 Masters response 4.3.1 The master of a ship or ship owners representative, when recognizing that the ship is

    25、 in distress and may need towing assistance, should make the initial notification of the incident to the following parties: a) Flag states; b) Nearest Coastal state; and c) Other relevant parties (shipper, insurer, company, authorities, etc.). 4.3.2 The master should complete Tables E.1 through E.4

    26、and prepare to communicate with the towing ship. 4.3.3 All information in Annexes C and D should be delivered to the towing ship. 4.3.4 The master should ensure that towing lines do not become taut until towing lines are tied to the connection system of the towing ship and that everyone on deck has

    27、been notified. 4.3.5 When the power system on board is not available or alternative connection procedures are introduced by the towing ship, the master should try to make the best decision possible considering the ships current status in consultation with the towing ship. 4.3.6 When an alternative p

    28、rocedure is adopted, it should be clearly communicated to all crew. 4.3.7 The master should ensure that survival craft are made ready for use. 4.4 Safety considerations 4.4.1 The Chief Officer on the mooring deck should be in contact with the Bridge at all times. 4.4.2 Everyone on deck should be equ

    29、ipped with personnel life saving appliances and be alert to avoid hazardous situations such as slips, trips, falls, etc. 4.4.3 All crew should be well informed of the work procedures and tasks. 4.4.4 When the towing line becomes strained in tension, all on-deck staff should be evacuated to a safe lo

    30、cation. 4.4.5 The crew should have a good knowledge of equipment stowage locations and their accessibility. Any identified improvements to stowage arrangements should be implemented. 4.4.6 While engaged in towing operations, the minimum number of crew essential to carry out duties are to be on deck,

    31、 and they should never be exposed to a rope or wire under tension or load. Wherever possible, the deck should be cleared of crew while towing. 4.4.7 Regular maintenance of emergency towing equipment is of utmost importance for emergency readiness. 4.5 Towing preparations 4.5.1 The towed ship is to d

    32、isplay the navigation lights, shapes and, if manned, make sound signals required by the International Regulations for Preventing Collisions at Sea, 1972, as amended. Due ISO 2012 All rights reserved 3 ISO 16548:2012(E) consideration should be given to the reliability of the lights and sound signals

    33、and their ability to function for the duration of the voyage. 4.5.2 Prior to sailing, the watertight integrity of the towed ship should be confirmed by an inspection of the closing arrangement for all hatches, valves, air pipes, and other openings through which water might enter. It should also be c

    34、onfirmed that any watertight doors or other closing arrangements within the hull are securely closed and that any portable closing plates are in place. 4.5.3 The securing arrangements and weather protection for the cargo, equipment and store carried on the towed ship should be carefully examined to

    35、ensure that they are adequate for the voyage. 4.5.4 When appropriate, the rudder should be secured in the amidships position and measures should be taken to prevent the propeller shaft from turning. 4.5.5 The towed ship should be at a suitable draught for the intended voyage. 4.5.6 The towed ship sh

    36、ould have adequate intact stability in all the loading and ballast conditions to be used during the voyage. 4.5.7 Life saving appliances in the form of lifejackets and lifebuoys should be provided whenever personnel are likely to be on board the towed ship even if only for short periods of time. Whe

    37、n personnel are expected to remain on board for longer periods of time, life rafts should be provided. Other life saving appliances, including distress signals, fire appliances and radio equipment, including means of communication with the towing ship, should be provided whenever the towed ship is c

    38、ontinually manned. 5 Decision matrix for determining towing pattern The towing pattern should be decided by the ships master, in consultation with the master of towing ship, by using the following decision matrix (see Annexes A and B). The ship should be towed from the bow as far as possible. If it

    39、is not possible to tow from the bow because of grounding, collision, etc., towing from the stern may be selected as an alternative. For determining the towing pattern, the following status and surrounding conditions should be taken into account: a) Ships position; b) Weather and sea conditions; c) S

    40、hort-term marine forecast for the area of the incident; d) Direction and rate of drift; e) Weather forecast for the area of emergency towing operation; f) Distance and estimated time to any possible towing position; g) Availability of propulsion system; and h) Availability of power supply for deck m

    41、achinery.4 ISO 2012 All rights reserved ISO 16548:2012(E) Annex A (informative) Towing patterns and decision matrix A.1 General Typical towing patterns stated either in this Annex or in IMO DE52/INF.2 are applicable. A.2 Towing from bow Figures A.1, A.2 and A.3 show the typical arrangements of a tow

    42、ing line connection for towing from bow. Key 1 bollard 2 towing line 3 towing ship Figure A.1 Pattern F1 ISO 2012 All rights reserved 5 ISO 16548:2012(E) Key 1 bollard 2 towing line 3 delta plate 4 towing ship Figure A.2 Pattern F26 ISO 2012 All rights reserved ISO 16548:2012(E) Key 1 chain stopper

    43、2 chafing chain 3 towing line 4 towing ship Note Use a chafing chain from a chain stopper or Smit bracket (if ETS is fitted). Figure A.3 Pattern F3 A.3 Towing from stern Figures A.4, A.5 and A.6 show the typical arrangements of a towing line connection for towing from stern. ISO 2012 All rights rese

    44、rved 7 ISO 16548:2012(E) Key 1 bollard 2 towing line 3 towing ship Figure A.4 Pattern A18 ISO 2012 All rights reserved ISO 16548:2012(E) Key 1 bollard 2 towing line 3 delta plate 4 towing ship Figure A.5 Pattern A2 ISO 2012 All rights reserved 9 ISO 16548:2012(E) Key 1 strong point 2 towing line 3 t

    45、owing ship Note Use a storage drum and strong point (if ETS is fitted). Figure A.6 Pattern A3 A.4 Decision matrix Tables A.1 and A.2 show the typical decision matrix for towing patterns.10 ISO 2012 All rights reserved ISO 16548:2012(E) T able A .1 D e c i s ion m a trix (i f ETS is not f it t e d )

    46、Condition Towing pattern Status Bow Stern Imminent and immediate dan- ger, e.g. risk of grounding in less than 1 hF1A1 1. Pattern F1 or A1 is to be used provided that the towing force is controlled so as not to exceed the Safe Working Load (SWL) of the deck fittings. 2. If the weather is severely ba

    47、d, the additional towing lines are to be connected between the towed ship and the towing ship. The duration of being towed is longF2A2 1. If possible, the two (2) sets of towing lines are to be used. 2. If possible, a chain is to be used so that the towing force can be controlled so as not to exceed

    48、 the Safe Working Load (SWL) of deck fittings. T able A .2 D e c i s ion m a trix (i f ETS is f it t e d ) Condition Towing pattern Status Bow Stern Imminent and immediate dan- ger, e.g. risk of grounding in less than 1 hF3A3 1. Pattern A3 is the preferred method in this condition, time of deploymen

    49、t is less than 15 min. 2. Pattern F3 is the alternative if the time allowed is 1 h. ISO 2012 All rights reserved 11 ISO 16548:2012(E) Annex B (informative) Procedures for connecting towing lines B.1 General Typical towing procedures stated either in this Annex or in IMO DE52/INF.2 are applicable. This clause describes the towing patterns of F1, F3, A1, and A3. Similar procedures should be adopted for the other patterns. The typical procedures are introduced for connecting towing lines in either th


    注意事项

    本文(ISO 16548-2012 Ships and marine technology - Ship design - General guidance on emergency towing procedures《船舶和海洋技术 船舶设计 应急牵引规程通用指南》.pdf)为本站会员(eveningprove235)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开