1、 IEEE Guide for the Application of Gas- Insulated Substations 1 kV to 52 kV Sponsored by the Substations Committee IEEE 3 Park Avenue New York, NY 10016-5997 USA 17 February 2012 IEEE Power +1 978 750 8400. Permission to photocopy portions of any individual standard for educational classroom use can
2、 also be obtained through the Copyright Clearance Center. . Introduction This introduction is not part of IEEE Std C37.122.2-2011, IEEE Guide for the Application of Gas-Insulated Substations 1 kV to 52 kV. IEEE Std C37.122TM-1983 IEEE Standard for Gas-Insulated Substations was initiated in the early
3、 1970s when the first gas-insulated substations (GIS) were introduced. Approved in 1983, 1993, and reaffirmed in 2002, it contains standards, recommended practices, and guides. Circumstances beyond the control of the responsible Technical Committees delayed its availability to users until late 1988.
4、 Simultaneous to its publication, the Gas-Insulated Substations Subcommittee of the IEEE Power Engineering Society Substations Committee began work on the necessary update and revision of the document. IEEE Std C37.122.1TMGuide for Gas-Insulated Substations was approved in 1993. That guide focused o
5、n the technical requirements for the design, fabrication, testing, and installation of a GIS in general 52 kV and above. Parameters to be supplied by the purchaser are suggested and technical requirements for the design, fabrication, testing, and installation to be furnished by the manufacturer is e
6、stablished. During the Working Group and Subcommittee deliberations on the update, it was recognized that users would be better served if the original documents IEEE Std C37.122-1993 (a standard) and IEEE Std C37.122.1-1993 (a guide) were supplemented with a guide for equipment rated 1 kV to 52 kV.
7、The third document became IEEE Std C37.122.2TM-2011 IEEE Guide for the Application of Gas-Insulated Substations 1 kV to 52 kV. The three documents can be referred to individually or jointly depending on the purpose of the referral. IEEE Std C37.122.2 is also based on GIS of the same voltage range co
8、vered by IEC 62271-200. Notice to users Laws and regulations Users of IEEE Standards documents should consult all applicable laws and regulations. Compliance with the provisions of any IEEE Standards document does not imply compliance to any applicable regulatory requirements. Implementers of the st
9、andard are responsible for observing or referring to the applicable regulatory requirements. IEEE does not, by the publication of its standards, intend to urge action that is not in compliance with applicable laws, and these documents may not be construed as doing so. Copyrights This document is cop
10、yrighted by the IEEE. It is made available for a wide variety of both public and private uses. These include both use, by reference, in laws and regulations, and use in private self-regulation, standardization, and the promotion of engineering practices and methods. By making this document available
11、 for use and adoption by public authorities and private users, the IEEE does not waive any rights in copyright to this document. Updating of IEEE documents Users of IEEE Standards documents should be aware that these documents may be superseded at any time by the issuance of new editions or may be a
12、mended from time to time through the issuance of amendments, corrigenda, or errata. An official IEEE document at any point in time consists of the current edition of the Copyright 2012 IEEE. All rights reserved. ivCopyright 2012 IEEE. All rights reserved. vdocument together with any amendments, corr
13、igenda, or errata then in effect. In order to determine whether a given document is the current edition and whether it has been amended through the issuance of amendments, corrigenda, or errata, visit the IEEE-SA Website at http:/standards.ieee.org/index.html or contact the IEEE at the address liste
14、d previously. For more information about the IEEE Standards Association or the IEEE standards development process, visit the IEEE-SA Website at http:/standards.ieee.org/index.html. Errata Errata, if any, for this and all other standards can be accessed at the following URL: http:/standards.ieee.org/
15、findstds/errata/index.html. Users are encouraged to check this URL for errata periodically. Interpretations Current interpretations can be accessed at the following URL: http:/standards.ieee.org/findstds/interps/index.html. Patents Attention is called to the possibility that implementation of this s
16、tandard may require use of subject matter covered by patent rights. By publication of this standard, no position is taken by the IEEE with respect to the existence or validity of any patent rights in connection therewith. If a patent holder or patent applicant has filed a statement of assurance via
17、an Accepted Letter of Assurance, then the statement is listed on the IEEE-SA Website http:/standards.ieee.org/about/sasb/patcom/patents.html. Letters of Assurance may indicate whether the Submitter is willing or unwilling to grant licenses under patent rights without compensation or under reasonable
18、 rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination to applicants desiring to obtain such licenses. Essential Patent Claims may exist for which a Letter of Assurance has not been received. The IEEE is not responsible for identifying Essential Patent C
19、laims for which a license may be required, for conducting inquiries into the legal validity or scope of Patents Claims, or determining whether any licensing terms or conditions provided in connection with submission of a Letter of Assurance, if any, or in any licensing agreements are reasonable or n
20、on-discriminatory. Users of this standard are expressly advised that determination of the validity of any patent rights, and the risk of infringement of such rights, is entirely their own responsibility. Further information may be obtained from the IEEE Standards Association. Participants Although a
21、ll Working Groups of the Gas-Insulated Substations Subcommittee contributed to this revision, the prime responsibility belonged to Working Group K3, which proposed this guide. At the time this IEEE guide was completed, the K3 Working Group had the following membership: G. W. Becker, Chair P. Blohm,
22、Vice Chair Arun Arora Peter Blohm Phil Bolin John Brunke Ted Burse Jack Gustin Richard Jones Heinz-Willi Juelicher Hermann Koch Shawn Lav Jeffery Nelson Ted Olsen Arno Wahle The Gas-Insulated Substations Subcommittee of the IEEE Power Engineering Society Substations Committee that prepared and revie
23、wed this guide had the following membership: A. Arora, Chair H. Koch, Past Chair G. Becker, Vice Chair Markus Etter, Secretary Stephen Arnold Bill Bergman Peter Blohm Lutz Boettger Phil Bolin Hugues Bosia Michel Bues Ted Burse Paul Coventry Rick Crowdis Wolfgang Degen Gary Engmann Jack Gustin Mel Ho
24、pkins Richard Jones Heinz-Willi Juelicher Shin-ichi Kobayashi Eresha Lam Shawn Lav Daniel Lauzon Johny Luiz Aram Markarians Thomas McNamara Venkatesh Minisandram Mike Muhlenhaupt Jeffrey Nelson Darin Penner Philippe Ponchon Mansour Pourcyrous Arno Wahle Darren Vogt Allen Xi Copyright 2012 IEEE. All
25、rights reserved. viThe following members of the individual balloting committee voted on this guide. Balloters may have voted for approval, disapproval, or abstention. William J. Ackerman Arun Arora George Becker W. J. Bill Bergman Wallace Binder William Bloethe John H. Brunke Eldridge Byron Arvind K
26、. Chaudhary Randy Clelland Jerry Corkran Robert Damron Gary Donner Michael Dood Dana Dufield Denis Dufournet Edgar Dullni Donald Dunn Douglas Edwards Kenneth Edwards Gary Engmann Markus Etter James Fairris Patrick Fitzgerald Marcel Fortin Mietek Glinkowski Jalal Gohari Edwin Goodwin James Graham Ran
27、dall Groves Charles Hand Steven Hensley Lee Herron Gary Heuston Scott Hietpas R. Jackson Wayne Johnson Andrew Jones Laszlo Kadar Tanuj Khandelwal Yuri Khersonsky J. Koepfinger Jim Kulchisky Saumen Kundu Chung-Yiu Lam Hua Liu Albert Livshitz Greg Luri Jorge Marquez William McBride Gary Michel Georges
28、 Montillet Dennis Neitzel Jeffrey Nelson Michael S. Newman T. Olsen Lorraine Padden Christopher Petrola Anthony Picagli Iulian Profir Michael Roberts Anne-Ma Sahazizian Bartien Sayogo Devki Sharma Gil Shultz James Smith Jerry Smith David Solhtalab John Spare Ralph Stell Gary Stoedter John Toth John
29、Vergis Waldemar Von Miller John Webb Kenneth White James Wikston James Wilson Sandeep Zope When the IEEE-SA Standards Board approved this guide on 7 December 2011, it had the following membership: Richard H. Hulett, Chair John Kulick, Vice Chair Robert M. Grow, Past President Judith Gorman, Secretar
30、y Masayuki Ariyoshi William Bartley Ted Burse Clint Chaplin Wael Diab Jean-Philippe Faure Alexander Gelman Paul Houz Jim Hughes Joseph L. Koepfinger* David J. Law Thomas Lee Hung Ling Oleg Logvinov Ted Olsen Gary Robinson Jon Walter Rosdahl Sam Sciacca Mike Seavey Curtis Siller Phil Winston Howard L
31、. Wolfman Don Wright *Member Emeritus Also included are the following nonvoting IEEE-SA Standards Board liaisons: Satish Aggarwal, NRC Representative Richard DeBlasio, DOE Representative Michael Janezic, NIST Representative Don Messina IEEE Standards Program Manager, Document Development Erin Spiewa
32、k IEEE Standards Program Manager, Document Development Copyright 2012 IEEE. All rights reserved. viiContents 1. Overview 1 1.1 Scope . 1 2. Normative references 1 3. Definitions 3 4. Guidelines for GIS equipment 1 kV up to 52 kV . 4 4.1 Specification 4 4.2 Installation, operation, and maintenance .
33、19 4.3 Testing procedures. 24 4.4 Documentation. 26 Annex A (informative) Switching device duty cycles 27 A.1 Circuit breaker and disconnect switch duty cycles . 27 Annex B (informative) Sequence of operation. 28 B.1 Sequence of operations for typical applications on feeder circuits . 28 B.2 Sequenc
34、e of operations for main bus grounding on sectionalized bus arrangements . 29 Annex C (informative) Bibliography 31 Copyright 2012 IEEE. All rights reserved. viiiIEEE Guide for the Application of Gas-Insulated Substations 1 kV to 52 kV IMPORTANT NOTICE: This standard is not intended to ensure safety
35、, security, health, or environmental protection. Implementers of the standard are responsible for determining appropriate safety, security, environmental, and health practices or regulatory requirements. This IEEE document is made available for use subject to important notices and legal disclaimers.
36、 These notices and disclaimers appear in all publications containing this document and may be found under the heading “Important Notice” or “Important Notices and Disclaimers Concerning IEEE Documents.” They can also be obtained on request from IEEE or viewed at http:/standards.ieee.org/IPR/disclaim
37、ers.html. 1. Overview 1.1 Scope This guide provides information regarding the planning, specification, testing, installation, operation, and maintenance of indoor gas-insulated substations (GIS) and equipment. 2. Normative references The following referenced documents are indispensable for the appli
38、cation of this document (i.e., they must be understood and used, so each referenced document is cited in text and its relationship to this document is explained). For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including an
39、y amendments or corrigenda) applies. ASTM D2472, Standard Specification for Sulfur Hexafluoride.1CIGRE 276, Guide for the preparation of customised “Practical SF6handling instructions.” 1ASTM publications are available from the American Society for Testing and Materials, 100 Barr Harbor Drive, West
40、Conshohocken, PA 19428-2959, USA (http:/www.astm.org/). Copyright 2012 IEEE. All rights reserved. 1IEEE Std C37.122.2-2011 IEEE Guide for the Application of Gas-Insulated Substations 1 kV to 52 kV IEC 60376, Specification and acceptance of new sulfur hexafluoride.2IEC 61243-5, Live workingVoltage de
41、tectorsPart 5: Voltage detecting systems (VDS). IEC 61634, High-voltage switchgear and controlgearUse and handling of sulfur hexafluoride in high-voltage switchgear. IEC 62271-1, High-voltage switchgear and controlgearPart 1: Common specifications. IEC 62271-100, High-voltage switchgear and controlg
42、earPart 100: High-voltage alternating-current circuit-breakers. IEC 62271-102, High-voltage switchgear and controlgearPart 102: Alternating current disconnect switches and earthing switches. IEC 62271-200, High-voltage switchgear and controlgearPart 200: AC metal-enclosed switchgear and controlgear
43、for rated voltages above 1 kV and up to and including 52 kV. IEEE Std 80TM, IEEE Guide for Safety in AC Substation Grounding.3,4IEEE Std 142TM, IEEE Recommended Practice for Grounding of Industrial and Commercial Power Systems (Green Book). IEEE Std 344TM, IEEE Recommended Practice for Seismic Quali
44、fication of Class 1E Equipment for Nuclear Power Generating Stations. IEEE Std 693TM, IEEE Recommended Practices for Seismic Design of Substations. IEEE Std C37.04TM, IEEE Standard Rating Structure for AC High-Voltage Circuit Breakers. IEEE Std C37.06TM, IEEE Standard for AC High-Voltage Circuit Bre
45、akers Rated on a Symmetrical Current BasisPreferred Ratings and Related Required Capabilities for Voltage Above 1000 V. IEEE Std C37.09TM, IEEE Standard Test Procedure for AC High-Voltage Circuit Breakers Rated on a Symmetrical Current Basis. IEEE Std C37.98TM, IEEE Standard for Seismic Testing of R
46、elays. IEEE Std C37.122TM, IEEE Standard for Gas-Insulated Substations. IEEE Std C37.122.1TM, IEEE Guide for Gas-Insulated Substations. IEEE Std C37.20.2TM, IEEE Standard for Metalclad Switchgear. 2IEC publications are available from IEC Sales Department, Case Postale 131, 3 rue de Varembe, CH-1211,
47、 Geneva 20, Switzerland/Suisse. IEC publications are also available in the United States from the Sales Department, American National Standards Institute, 11 West 42nd Street, 13th Floor, New York, NY 10036, USA. 3IEEE publications are available from The Institute of Electrical and Electronics Engin
48、eers, 445 Hoes Lane, P.O. Box 1331, Piscataway, NJ 08855-1331, USA. 4The IEEE standards or products referred to in this clause are trademarks of The Institute of Electrical and Electronics Engineers, Inc. Copyright 2012 IEEE. All rights reserved. 2IEEE Std C37.122.2-2011 IEEE Guide for the Applicati
49、on of Gas-Insulated Substations 1 kV to 52 kV 3. Definitions For the purposes of this document, the following terms and definitions apply. The IEEE Standards Dictionary: Glossary of Terms and Definitions5should be consulted for terms not defined in this clause. assembly (gas-insulated substation GIS): A collection of GIS components that are interconnected and ready for insertion as a subassembly in a GIS, such as a breaker panel shipping assembly. The term is also used to describe a complete GIS. auxiliary circuits: All control, indicating, and measuring cir