欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    VA 27 31 31-2006 VOICE COMMUNICATIONS SWITCHING AND ROUTING EQUIPMENT - EXTENSION.pdf

    • 资源ID:1074988       资源大小:561.45KB        全文页数:58页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    VA 27 31 31-2006 VOICE COMMUNICATIONS SWITCHING AND ROUTING EQUIPMENT - EXTENSION.pdf

    1、10-06M 27 31 31 - 1 SECTION 27 31 31 VOICE COMMUNICATIONS SWITCHING AND ROUTING EQUIPMENT - EXTENSION SPEC WRITER NOTES: 1. Contact Department of Veterans Affairs, Veterans Health Administration (VHA), Telecommunications Support Service (TSSO-005N2), Telephone (301/427-3950) for technical assistance

    2、. 2. Edit between /-/. Delete if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the remaining paragraphs. Defer to VHA TSSO-005N2 for technical assistance and approval concerning all issues. PART 1 - GENERAL 1.1 DESCRIPTION A. This secti

    3、on specifies the furnishing, installing, certification, testing, and guaranty of a complete and operating extension of an existing operating Telephone System, and associated equipment (here-in-after referred to as “the System”) and associated equipment to be installed in the VA / Medical Center /, /

    4、, Out Patient Clinic / /, Nursing Home Care Unit / /, Domiciliary/ /, or _ / here-in-after referred to as “the Facility”. The System shall include, but not be limited to, equipment cabinets, interface enclosures, and relay racks, stand-by battery(s), necessary combiners, traps, and filters; distribu

    5、tion nodes and/or amplifiers; telephone instruments; auxiliary systems; and necessary passive devices such as: protectors, isolators, splitters, couplers, cable “patch”, “punch down”, and cross-connector blocks or devices, cable management items, voice and digital cable distribution system, and asso

    6、ciated hardware. The System shall additionally include, but not be limited to: telecommunication closets (TC); telecommunications outlets (TCO); copper and fiber optic / , and analog Radio Frequency (RF) coaxial / distribution cables, connectors, “patch” cables, and/or “break out” devices. B. The Sy

    7、stem shall be delivered free of engineering, manufacturing, installation, and operating defects. It shall be designed, engineered and installed for ease of operation, maintenance, and testing. C. The term “provide”, as used herein, shall be defined as: designed, engineered, furnished, installed, cer

    8、tified, and tested, by the Contractor. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-06M 27 31 31 - 2 D. The Telephone System is defined as an Emergency Critical Care Communication System by the National Fire Protection Association (NFPA). There

    9、fore, if the System connects to or extends the telephone system, the Systems installation and operation shall adhere to all appropriate National, Government, and/or Local Life Safety and/or Support Codes, which ever are the more stringent for this Facility. At a minimum, the System shall be installe

    10、d according to NFPA, Section 70, National Electrical Code (NEC), Article 517 and Chapter 7; NFPA, Section 99, Health Care Facilities, Chapter 3-4; NFPA, Section 101, Life Safety Code, Chapters 7, 12, and/or 13; Joint Commission on Accreditation of Health Care Organization (JCAHCO), Manual for Health

    11、 Care Facilities, all necessary Life Safety and/or Support guidelines; this specification; and the original equipment manufacturers (OEM) suggested installation design, recommendations, and instructions. The OEM and Contractor shall ensure that all management, sales, engineering, and installation pe

    12、rsonnel have read and understand the requirements of this specification before the System is designed, engineered, delivered, and provided. E. The VA Project Manager (PM) and/or if delegated, Resident Engineer (RE) are the approving authorities for all contractual and mechanical changes to the Syste

    13、m. The Contractor is cautioned to obtain in writing, all approvals for system changes relating to the published contract specifications and drawings, from the PM and/or the RE before proceeding with the change. 1.2 RELATED WORK A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. B. Sectio

    14、n 27 05 11, REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS. C. Section 27 05 33, RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS. D. Section 27 10 00, STRUCTURED CABLING. E. Section 26 27 26, WIRING DEVICES. F. Section 27 05 26, GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS. G. Section 26 41 00, FAC

    15、ILITY LIGHTNING PROTECTION. H. Section 27 15 00, COMMUNICATIONS HORIZONTAL CABLING. I. H-088C3: VA HANDBOOK DESIGN FOR TELEPHONE SYSTEMS /J. Section 27 32 41, TWO-WAY RADIO EQUIPMENT. / /K. Section 27 31 00, VOICE COMMUNICATIONS SWITCHING AND ROUTING EQUIPMENT. / /L. Section 27 51 16, PUBLIC ADDRESS

    16、 AND MASS NOTIFICATION SYSTEMS. / Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-06M 27 31 31 - 3 1.3 APPLICABLE PUBLICATIONS A. The publications listed below form a part of this specification to the extent referenced. The publications are refere

    17、nced in text by basic designation only. Except for a specific date given, the issue in effect (including amendments, addenda, revisions, supplements, and errata) on the date the systems submittal is technically approved by VA, shall be enforced. B. Joint Commission on Accreditation of Health Care Or

    18、ganization (JCAHO): Comprehensive Accreditation Manual for Hospitals - Volumes One and Two. C. National and/or Government Life Safety Code(s):The more stringent of each listed code. D. National Fire Protection Association (NFPA): No. 70 National Electrical Code (NEC) No. 75 Protection of Electronic

    19、Computer/Data Processing Systems No. 77 Recommended Practice on Static Electricity No. 99 Standard for Health Care Facilities No. 101 Life Safety Code No. 1221 Emergency Services Communication Systems E. Underwriters Laboratories, Inc. (UL): 65 Wired Cabinets 96 Lightning Protection Components 96A I

    20、nstallation Requirements for Lightning Protection Systems 467 Grounding and Bonding Equipment 497/497A/497B Protectors for Paired Conductors/ Communications Circuits/Data Communications and Fire Alarm Circuits 884 Underfloor Raceways and Fittings F. ANSI/EIA/TIA PUBLICATIONS: 568B Commercial Buildin

    21、g Telecommunications 569B COMMERCIAL BUILDING STANDARD FOR TELECOMMUNICATIONS PATHWAYS AND SPACES Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-06M 27 31 31 - 4 598C Optical Fiber Cable Color Coding 606A Administration Standard for the Telecommu

    22、nications Infrastructure of Commercial Buildings 607A Grounding and Bonding Requirements for Telecommunications in Commercial Buildings 758 Grounding and Bonding Requirements for Telecommunications in Commercial Buildings G. Lucent Technologies: Document 900-200-318 “Outside Plant Engineering Handbo

    23、ok”. H. International Telecommunication Union Telecommunication Standardization Sector (ITU-T). I. Federal Information Processing Standards (FIPS) Publications. J. Federal Communications Commission (FCC) Publication: Standards for telephone equipment and systems. K. United States Air Force: Technica

    24、l Order 33K-l-lOO - Test Measurement and Diagnostic Equipment (TMDE) Interval Reference Guide. 1.4 QUALITY ASSURANCE A. The authorized representative of the Systems OEM shall be responsible for the design, satisfactory total operation of the System, and its certification. B. The OEM shall meet the m

    25、inimum requirements identified in Paragraph 2.1.A. Additionally, the Contractor shall have had experience with three or more installations of systems of comparable size and complexity with regard to coordinating, engineering, testing, certifying, supervising, training, and documentation. Each of the

    26、se installations shall have been in successful operation for a minimum of three years after final acceptance by the user. These installations shall be provided as a part of the submittal identified in Paragraph 1.5. C. The System Contractor shall submit certified documentation that they have been an

    27、 authorized distributor and service organization for the OEM for a minimum of three (3) years. The System Contractor shall be authorized by the OEM to certify and warranty the installed equipment. In addition, the OEM and System Contractor shall accept complete responsibility for the design installa

    28、tion, certification, and physical support for the System. This documentation, along with the System Contractor and OEM certifications must be provided in writing as a part of the Contractors Technical Submittal. Provided by IHSNot for ResaleNo reproduction or networking permitted without license fro

    29、m IHS-,-,-10-06M 27 31 31 - 5 D. The Contractors Telecommunications Technicians assigned to the System shall be fully trained, qualified, and certified by the OEM on the engineering, installation, and testing of the System. The Contractor shall provide formal written evidence of current OEM certific

    30、ation(s) for the installer(s) as a part of the submittal or to the RE before being allowed to commence work on the System. 1.5 SUBMITTALS A. On-Site Survey: The Contractor shall provide an on-site telephone equipment location, cable pathway, TC, TCO, and interconnection survey with the submittal tha

    31、t is accomplished no later than 18 months prior to the expected completion of the facility. 1. The survey will be accomplished by a physical walk through of the facility and existing locations with the contract drawings (including all approved changes) and existing survey performed by the IRM depart

    32、ment. Differences in locations between the two surveys shall be clearly identified and shall be provided to the RE in writing within 30 days of the completion of the survey. B. Provide submittals in accordance with Specification Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. The RE shal

    33、l retain one copy for review and approval. 1. If the submittal is approved the RE shall retain one copy for Official Records and return three (3) copies to the Contractor. 2. If the submittal is disapproved, three (3) copies will be returned to the Contractor with a written explanation attached indi

    34、cating the areas where the submittal deviated from the System Specifications. The RE shall retain one copy for Official Records. C. Documents: The submittal shall be separated into sections for each subsystem and shall contain the following: 1. Title page to include: a. VA Medical Center. b. Contrac

    35、tors name, address, and telephone (including fax) numbers. c. Date of Submittal. d. VA Project No. 2. List containing a minimum of three (3) locations of installations of similar size and complexity as identified herein. These locations shall contain the following: a. Installation Location and Name.

    36、 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-06M 27 31 31 - 6 b. Owners or users name, address, and telephone numbers (including fax). c. Date of Project Start and Date of Final Acceptance by Owner. d. System Project Number. e. Brief (three pa

    37、ragraphs minimum) description of each systems function, operation, and installation. 3. Narrative: Description of the System as it is expected to be installed. 4. A list of equipment to be furnished. The quantity, make and mode number of each item is required. Select the required equipment items qua

    38、ntities that will satisfy the needs of the System and edit between the / - /. Delete equipment items that are not required, add additional items required, and renumber section as per system design. List format shall be as follows: SPEC WRITER NOTE: Select the required equipment item quantities that

    39、will satisfy the needs of the System and edit between / - /. Delete equipment items that are not required, and renumber the section as per system design. The following is the minimum equipment required by the System: QUANTITY UNIT As required CSU As required Back-up Battery Power Supply As required

    40、AC Power Supply As required Equipment Cabinet(s) As required Environmental Cabinet 1 ea. Lightning Protection System As required Distribution/Interface Cabinets As required Stand Alone Relay Rack As required CCS As required Audio Alarm Panel As required Trouble Annunciator Panel As required Wire Man

    41、agement System/Equipment As required Telephone Instruments As required Cable Distribution System As required System Conduits, Cable Duct, and/or Cable Tray Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-06M 27 31 31 - 7 1 ea. Installation Kit 1 e

    42、a. Separate Spare Part List As required Telephone Paging Adapter (one each required for PA, Radio Paging and sub-systems) As required Time Out Device (one each required for PA, Radio, and Dial Dictation sub-system) 5. Interface cabinet and each distribution cabinet layout drawing, as each is to be i

    43、nstalled. 6. Equipment technical literature detailing the electrical and technical characteristics of each item of equipment to be furnished. 7. Engineering drawings of the System, showing calculated signal levels at the CSU output, each input and output distribution point, proposed telephone outlet

    44、 values, and signal level at each telephone outlet multipin jack. 8. List of test equipment as per paragraph 1.5.E below. 9. A letter certifying that the Contractor understands the requirements of the Samples paragraph 1.5.F below. 10. A letter certifying that the Contractor understands the requirem

    45、ents of Section 3.2 concerning acceptance tests. D. Environmental Requirements: Technical submittals shall confirm the environmental specifications for TC areas occupied by the System. These environmental specifications shall identify the requirements for initial and expanded system configurations f

    46、or: 1. Floor loading for batteries and cabinets. 2. Minimum floor space and ceiling heights. 3. Minimum size of doors for equipment passage. 4. Power requirements: The bidders shall provide the specific voltage, amperage, phases, and quantities of circuits required. 5. Air conditioning, heating, and

    47、 humidity requirements. The Contractor shall identify the ambient temperature and relative humidity operating ranges required to prevent equipment damage. 6. Air conditioning requirements (expressed in BTU per hour, based on adequate dissipation of generated heat to maintain required room and equipm

    48、ent standards). 7. Main backbone, trunk line, riser, and horizontal cable pathways, cable duct, and conduit requirements between each MTC, TC, and TCO. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-06M 27 31 31 - 8 E. Test Equipment List. The Co

    49、ntractor is responsible for furnishing all test equipment required to test the System in accordance with the parameters specified. Unless otherwise stated, the test equipment shall not be considered part of the system. The Contractor shall furnish test equipment of an accuracy better than the parameters to be tested. The test equipment f


    注意事项

    本文(VA 27 31 31-2006 VOICE COMMUNICATIONS SWITCHING AND ROUTING EQUIPMENT - EXTENSION.pdf)为本站会员(diecharacter305)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开