1、 TIA-2001.4-E-2 (Addendum to TIA-2001.4-E) October 2011Interoperability Specification (IOS) for cdma2000 Access Network Interfaces-Part 4 (A1, A1p, A2, and A5 Interfaces) NOTICE TIA Engineering Standards and Publications are designed to serve the public interest through eliminating misunderstandings
2、 between manufacturers and purchasers, facilitating interchangeability and improvement of products, and assisting the purchaser in selecting and obtaining with minimum delay the proper product for their particular need. The existence of such Standards and Publications shall not in any respect preclu
3、de any member or non-member of TIA from manufacturing or selling products not conforming to such Standards and Publications. Neither shall the existence of such Standards and Publications preclude their voluntary use by Non-TIA members, either domestically or internationally. Standards and Publicati
4、ons are adopted by TIA in accordance with the American National Standards Institute (ANSI) patent policy. By such action, TIA does not assume any liability to any patent owner, nor does it assume any obligation whatever to parties adopting the Standard or Publication. This Standard does not purport
5、to address all safety problems associated with its use or all applicable regulatory requirements. It is the responsibility of the user of this Standard to establish appropriate safety and health practices and to determine the applicability of regulatory limitations before its use. (From Project No.
6、3-4545.4-RV5-AD2, formulated under the cognizance of the TIA TR-45 Mobile (b) there is no assurance that the Document will be approved by any Committee of TIA or any other body in its present or any other form; (c) the Document may be amended, modified or changed in the standards development or any
7、editing process. The use or practice of contents of this Document may involve the use of intellectual property rights (“IPR”), including pending or issued patents, or copyrights, owned by one or more parties. TIA makes no search or investigation for IPR. When IPR consisting of patents and published
8、pending patent applications are claimed and called to TIAs attention, a statement from the holder thereof is requested, all in accordance with the Manual. TIA takes no position with reference to, and disclaims any obligation to investigate or inquire into, the scope or validity of any claims of IPR.
9、 TIA will neither be a party to discussions of any licensing terms or conditions, which are instead left to the parties involved, nor will TIA opine or judge whether proposed licensing terms or conditions are reasonable or non-discriminatory. TIA does not warrant or represent that procedures or prac
10、tices suggested or provided in the Manual have been complied with as respects the Document or its contents. If the Document contains one or more Normative References to a document published by another organization (“other SSO”) engaged in the formulation, development or publication of standards (whe
11、ther designated as a standard, specification, recommendation or otherwise), whether such reference consists of mandatory, alternate or optional elements (as defined in the TIA Engineering Manual, 4thedition) then (i) TIA disclaims any duty or obligation to search or investigate the records of any ot
12、her SSO for IPR or letters of assurance relating to any such Normative Reference; (ii) TIAs policy of encouragement of voluntary disclosure (see Engineering Manual Section 6.5.1) of Essential Patent(s) and published pending patent applications shall apply; and (iii) Information as to claims of IPR i
13、n the records or publications of the other SSO shall not constitute identification to TIA of a claim of Essential Patent(s) or published pending patent applications. TIA does not enforce or monitor compliance with the contents of the Document. TIA does not certify, inspect, test or otherwise investi
14、gate products, designs or services or any claims of compliance with the contents of the Document. ALL WARRANTIES, EXPRESS OR IMPLIED, ARE DISCLAIMED, INCLUDING WITHOUT LIMITATION, ANY AND ALL WARRANTIES CONCERNING THE ACCURACY OF THE CONTENTS, ITS FITNESS OR APPROPRIATENESS FOR A PARTICULAR PURPOSE
15、OR USE, ITS MERCHANTABILITY AND ITS NONINFRINGEMENT OF ANY THIRD PARTYS INTELLECTUAL PROPERTY RIGHTS. TIA EXPRESSLY DISCLAIMS ANY AND ALL RESPONSIBILITIES FOR THE ACCURACY OF THE CONTENTS AND MAKES NO REPRESENTATIONS OR WARRANTIES REGARDING THE CONTENTS COMPLIANCE WITH ANY APPLICABLE STATUTE, RULE O
16、R REGULATION, OR THE SAFETY OR HEALTH EFFECTS OF THE CONTENTS OR ANY PRODUCT OR SERVICE REFERRED TO IN THE DOCUMENT OR PRODUCED OR RENDERED TO COMPLY WITH THE CONTENTS. TIA SHALL NOT BE LIABLE FOR ANY AND ALL DAMAGES, DIRECT OR INDIRECT, ARISING FROM OR RELATING TO ANY USE OF THE CONTENTS CONTAINED
17、HEREIN, INCLUDING WITHOUT LIMITATION ANY AND ALL INDIRECT, SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES (INCLUDING DAMAGES FOR LOSS OF BUSINESS, LOSS OF PROFITS, LITIGATION, OR THE LIKE), WHETHER BASED UPON BREACH OF CONTRACT, BREACH OF WARRANTY, TORT (INCLUDING NEGLIGENCE), PRODUCT LIABILITY OR OTH
18、ERWISE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. THE FOREGOING NEGATION OF DAMAGES IS A FUNDAMENTAL ELEMENT OF THE USE OF THE CONTENTS HEREOF, AND THESE CONTENTS WOULD NOT BE PUBLISHED BY TIA WITHOUT SUCH LIMITATIONS. Revision History Date Publication Description June 2007 A.S0014-D v1.0
19、For features supported, refer to the Overview 11, section 1.1. August 2009 A.S0014-D v2.0 Updates to support 1x air interface enhancements, EVRC-WB on A2p, EVRC-NW on A2 and A2p and bug fixes. May 2011 A.S0014-D v3.0 Support for callback of an emergency call origination, EVRC-NW capacity operating p
20、oint 0, and bug fixes. TIA-2001.4-E-2 i Table of Contents 1 2 Foreword .xv 3 1.0 Introduction 1 4 1.1 Overview 1 5 1.1.1 Purpose . 1 6 1.1.2 Scope 1 7 1.2 References 2 8 1.2.1 Normative References. 2 9 1.2.2 Informative References . 4 10 1.3 Terminology . 4 11 1.3.1 Acronyms 4 12 1.3.2 Definitions 8
21、 13 1.4 Message Body, Coding, and Ordering of Elements 8 14 1.5 Forward Compatibility Guidelines . 9 15 1.6 Message Processing Guidelines .10 16 1.7 Message Definition Guidelines 11 17 1.8 Message Sending Guidelines .11 18 1.9 MSC BS Functional Partitioning 12 19 2.0 Message Procedures 15 20 2.1 Cal
22、l Processing Message Procedures .15 21 2.1.1 Complete Layer 3 Information 15 22 2.1.1.1 Successful Operation .15 23 2.1.1.2 Failure Operation .15 24 2.1.2 Connection Management (CM) Service Request .15 25 2.1.2.1 Successful Operation .15 26 2.1.2.2 Failure Operation .16 27 2.1.2.3 Abnormal Operation
23、 16 28 2.1.3 Connection Management (CM) Service Request Continuation .16 29 2.1.3.1 Successful Operation .16 30 2.1.3.2 Failure Operation .16 31 2.1.4 Paging Request 17 32 2.1.4.1 Successful Operation .17 33 2.1.4.2 Failure Operation .17 34 2.1.5 Paging Response 17 35 2.1.5.1 Successful Operation .1
24、7 36 2.1.5.2 Failure Operation .18 37 2.1.5.3 Abnormal Operation 18 38 2.1.6 Progress .18 39 2.1.6.1 Successful Operation .18 40 2.1.6.2 Failure Operation .18 41 2.1.7 Assignment Request 18 42 2.1.7.1 Successful Operation .19 43 2.1.7.2 Failure Operation .19 44 2.1.8 Assignment Complete 19 45 2.1.8.
25、1 Successful Operation .19 46 2.1.8.2 Failure Operation .19 47 2.1.9 Assignment Failure 20 48 2.1.9.1 Successful Operation .20 49 2.1.9.2 Failure Operation .20 50 2.1.10 Connect 20 51 2.1.10.1 Successful Operation .20 52 2.1.10.2 Failure Operation .20 53 2.1.11 Service Release 20 54 2.1.11.1 Base St
26、ation Initiated .20 55 TIA-2001.4-E-2 ii 2.1.11.1.1 Successful Operation 20 1 2.1.11.1.2 Failure Operation 21 2 2.1.11.2 MSC Initiated 21 3 2.1.11.2.1 Successful Operation 21 4 2.1.11.2.2 Failure Operation 21 5 2.1.12 Service Release Complete .21 6 2.1.12.1 MSC Initiated 21 7 2.1.12.1.1 Successful O
27、peration 21 8 2.1.12.1.2 Failure Operation 22 9 2.1.12.2 BS Initiated 22 10 2.1.12.2.1 Successful Operation 22 11 2.1.12.2.2 Failure Operation 22 12 2.1.13 Clear Request .22 13 2.1.13.1 Successful Operation .22 14 2.1.13.2 Failure Operation .22 15 2.1.14 Clear Command .22 16 2.1.14.1 Successful Oper
28、ation .23 17 2.1.14.2 Failure Operation .23 18 2.1.15 Clear Complete 23 19 2.1.15.1 Successful Operation .23 20 2.1.15.2 Failure Operation .23 21 2.1.16 Alert With Information 24 22 2.1.16.1 Successful Operation .24 23 2.1.16.2 Failure Operation .24 24 2.1.17 BS Service Request 24 25 2.1.17.1 Succes
29、sful Operation .24 26 2.1.17.2 Failure Operation .24 27 2.1.18 BS Service Response .24 28 2.1.18.1 Successful Operation .25 29 2.1.18.2 Failure Operation .25 30 2.1.19 Additional Service Notification .25 31 2.1.19.1 Successful Operation .25 32 2.1.19.2 Failure Operation .25 33 2.1.20 Additional Serv
30、ice Request .25 34 2.1.20.1 Successful Operation .25 35 2.1.20.2 Failure Operation .26 36 2.1.21 Bearer Update Request 26 37 2.1.21.1 Successful Operation .26 38 2.1.21.2 Failure Operation .26 39 2.1.22 Bearer Update Response 26 40 2.1.22.1 Successful Operation .26 41 2.1.22.2 Failure Operation .26
31、42 2.1.23 Bearer Update Required.26 43 2.1.23.1 Successful Operation .26 44 2.1.23.2 Failure Operation .27 45 2.2 Supplementary Services Message Procedures .27 46 2.2.1 Flash with Information.27 47 2.2.1.1 Successful Operation .27 48 2.2.1.2 Failure Operation .27 49 2.2.2 Flash with Information Ack
32、.28 50 2.2.2.1 Successful Operation .28 51 2.2.2.2 Failure Operation .28 52 2.2.3 Feature Notification .28 53 2.2.3.1 Successful Operation .28 54 2.2.3.2 Failure Operation .28 55 2.2.4 Feature Notification Ack .28 56 TIA-2001.4-E-2 iii 2.2.4.1 Successful Operation .28 1 2.2.4.2 Failure Operation .29
33、 2 2.2.5 PACA Command .29 3 2.2.5.1 Successful Operation .29 4 2.2.5.2 Failure Operation .29 5 2.2.6 PACA Command Ack .29 6 2.2.6.1 Successful Operation .29 7 2.2.6.2 Failure Operation .29 8 2.2.7 PACA Update 29 9 2.2.7.1 Successful Operation .29 10 2.2.7.2 Failure Operation .30 11 2.2.8 PACA Update
34、 Ack 30 12 2.2.8.1 Successful Operation .30 13 2.2.8.2 Failure Operation .30 14 2.2.9 Radio Measurements for Position Request 30 15 2.2.9.1 Successful Operation .31 16 2.2.9.2 Failure Operation .31 17 2.2.10 Radio Measurements for Position Response 31 18 2.2.10.1 Successful Operation .31 19 2.2.10.2
35、 Failure Operation .31 20 2.3 Mobility Management Message Procedures 31 21 2.3.1 Authentication Request 31 22 2.3.1.1 Successful Operation .32 23 2.3.1.2 Failure Operation .32 24 2.3.2 Authentication Response .32 25 2.3.2.1 Successful Operation .32 26 2.3.2.2 Failure Operation .32 27 2.3.3 SSD Updat
36、e Request 32 28 2.3.3.1 Successful Operation .32 29 2.3.3.2 Failure Operation .33 30 2.3.4 SSD Update Response .33 31 2.3.4.1 Successful Operation .33 32 2.3.4.2 Failure Operation .33 33 2.3.5 Base Station Challenge 33 34 2.3.5.1 Successful Operation .33 35 2.3.5.2 Failure Operation .34 36 2.3.6 Bas
37、e Station Challenge Response 34 37 2.3.6.1 Successful Operation .34 38 2.3.6.2 Failure Operation .34 39 2.3.7 Location Updating Request .34 40 2.3.7.1 Successful Operation .34 41 2.3.7.2 Failure Operation .34 42 2.3.8 Location Updating Accept .35 43 2.3.8.1 Successful Operation .35 44 2.3.8.2 Failur
38、e Operation .35 45 2.3.9 Location Updating Reject 35 46 2.3.9.1 Successful Operation .35 47 2.3.9.2 Failure Operation .35 48 2.3.10 Parameter Update Request .35 49 2.3.10.1 Successful Operation .35 50 2.3.10.2 Failure Operation .35 51 2.3.11 Parameter Update Confirm 36 52 2.3.11.1 Successful Operati
39、on .36 53 2.3.11.2 Failure Operation .36 54 2.3.12 Privacy Mode Command .36 55 2.3.12.1 Successful Operation .36 56 TIA-2001.4-E-2 iv 2.3.12.2 Failure Operation .36 1 2.3.13 Privacy Mode Complete 37 2 2.3.13.1 Successful Operation .37 3 2.3.13.2 Failure Operation .37 4 2.3.14 Status Request 37 5 2.3
40、.14.1 Successful Operation .37 6 2.3.14.2 Failure Operation .37 7 2.3.15 Status Response .37 8 2.3.15.1 Successful Operation .38 9 2.3.15.2 Failure Operation .38 10 2.3.16 User Zone Update Request 38 11 2.3.16.1 Successful Operation .38 12 2.3.16.2 Failure Operation .38 13 2.3.17 User Zone Update 38
41、 14 2.3.17.1 Successful Operation .38 15 2.3.17.2 Failure Operation .38 16 2.3.18 User Zone Reject .38 17 2.3.18.1 Successful Operation .38 18 2.3.18.2 Failure Operation .39 19 2.3.19 Registration Request 39 20 2.3.19.1 Successful Operation .39 21 2.3.19.2 Failure Operation .39 22 2.3.20 Mobile Stat
42、ion Registered Notification .39 23 2.3.20.1 Successful Operation .39 24 2.3.20.2 Failure Operation .39 25 2.3.21 BS Authentication Request 39 26 2.3.21.1 Successful Operation .39 27 2.3.21.2 Failure Operation .39 28 2.3.22 BS Authentication Request Ack 40 29 2.3.22.1 Successful Operation .40 30 2.3.
43、22.1 Failure Operation .40 31 2.3.23 BS Security Mode Request 40 32 2.3.23.1 Successful Operation .40 33 2.3.23.2 Failure Operation .40 34 2.3.24 Security Mode Request 40 35 2.3.24.1 Successful Operation .40 36 2.3.24.2 Failure Operation .41 37 2.3.25 Security Mode Response .41 38 2.3.25.1 Successfu
44、l Operation .41 39 2.3.25.2 Failure Operation .41 40 2.3.26 Authentication Report 41 41 2.3.26.1 Successful Operation .41 42 2.3.26.2 Failure Operation .41 43 2.3.27 Authentication Report Response41 44 2.3.27.1 Successful Operation .42 45 2.3.27.2 Failure Operation .42 46 2.3.28 Event Notification 4
45、2 47 2.3.28.1 Successful Operation .42 48 2.3.28.2 Failure Operation .42 49 2.3.29 Event Notification Ack 42 50 2.3.29.1 Successful Operation .42 51 2.3.29.2 Failure Operation .42 52 2.4 Handoff Message Procedures 43 53 2.4.1 Handoff Required 43 54 2.4.1.1 Successful Operation .43 55 2.4.1.2 Failure
46、 Operation .43 56 TIA-2001.4-E-2 v 2.4.2 Handoff Request 43 1 2.4.2.1 Successful Operation .43 2 2.4.2.2 Failure Operation .44 3 2.4.3 Handoff Request Acknowledge .44 4 2.4.3.1 Successful Operation .44 5 2.4.3.2 Failure Operation .45 6 2.4.4 Handoff Command 45 7 2.4.4.1 Successful Operation .45 8 2.
47、4.4.2 Failure Operation .45 9 2.4.5 Handoff Commenced .46 10 2.4.5.1 Successful Operation .46 11 2.4.5.2 Failure Operation .46 12 2.4.6 Handoff Complete .47 13 2.4.6.1 Successful Operation .47 14 2.4.6.2 Failure Operation .47 15 2.4.7 Handoff Required Reject .47 16 2.4.7.1 Successful Operation .47 1
48、7 2.4.7.2 Failure Operation .47 18 2.4.8 Handoff Failure 48 19 2.4.8.1 Successful Operation .48 20 2.4.8.2 Failure Operation .48 21 2.4.9 Handoff Performed 48 22 2.4.9.1 Successful Operation .48 23 2.4.9.2 Failure Operation .48 24 2.5 Facility Management Message Procedures 49 25 2.5.1 Block 49 26 2.
49、5.1.1 Successful Operation .49 27 2.5.1.2 Failure Operation .49 28 2.5.2 Block Acknowledge .49 29 2.5.2.1 Successful Operation .49 30 2.5.2.2 Failure Operation .50 31 2.5.3 Unblock .50 32 2.5.3.1 Successful Operation .50 33 2.5.3.2 Failure Operation .50 34 2.5.4 Unblock Acknowledge 50 35 2.5.4.1 Successful Operation .50 36 2.5.4.2 Failure Operation .50 37 2.5.5 Reset Circuit 51 38 2.5.5.1 Reset Circuit (at the BS) 51 39 2.5.5.1.1 Successful Operation 51 40 2.5.5.1.2 Failure Operation 51 41 2.5.5.2 Reset Circuit (at the circuit-switched MSC) 51 42 2.5.5.2.1 Successful Operation 51 43 2.