欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    SANS 10120-5 LF-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section LF E.pdf

    • 资源ID:1028615       资源大小:172.89KB        全文页数:4页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    SANS 10120-5 LF-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section LF E.pdf

    1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA

    2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any

    3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. Clause 1. 1.1 2. 2.1 2.2 3. 3.1 3.1.1 3.1.2 3.2 3.2.1 4. SABS 0120 : Part 5 Section 1,F-1983 Erf connections (water) PART 5 : CONTRACT ADMINISTRATlON SEC

    4、TION LF CONTENTS Page Number START OF CONSTRUCTION . 1 General . 1 IMMEDIATELY AFTER THE AWARD OF THE CONTRACT 1 Access to Properties . 1 Meters . 1 DURING CONSTRUCTION . 1 Methods of Construction . 1 Service connections to AC pipelines 1 InstaJlation of meters I Administration . 1 Meter testing at

    5、manufacturers works 1 QUALITY CONTROL AND OTHER CONSIDERATIONS . 1 June 1983 Approved by the COUNCIL OF Tf1E SOUTH AFRICAN BUREAU OF STANDARDS SABS 0120 : Port 5 Section LF-1983 Erf connections (water) SABS 1200 LF : ERF CONNECTIONS (WATER) NOTE: The clause number(s) given at the beginning or after

    6、the heading of a clause is/are, unless otherwise stated, the numberls) of the relevant clause(s) of SABS 1200 LF. START OF CONSTRUCTION GENERAL. For the purposes of this part of the code, contract administration starts with instructions to the contractor to commence work as set out in Subclause 4.1

    7、of Section 0. IMMEDIATKLY AFTER THE AWARD OF TNE CONTRACT ACCESS TO PROPERTIES (Subclause 5.2.1). The contractor should ensure that the notices provided in terms of Subclause 5.2.1 of SABS 1200 LF are delivered to each occupier/consumer in good time. METERS (Subclause 3.2.2). Where meters are to be

    8、supplied by the employer, the engineer should ensure that they are available well ahead of the date by which they will be required by the contractor. DURING CONSTRUCTION METHODS OF CONSTRUCTION Service Connections to AC pipelines (Subclause 5.2.3.2) When holes are drilled in an AC main before saddle

    9、s and rubber sealing washers are fitted, the contractor should ensure that each hole has enough clearance for the ferrule male end to enter freely after the saddle has been bolted onto the pipe. The hole in the rubber washer should be cleanly punched to allow the same clearance. To tap a connection

    10、lnto a water main under full working pressure1), an indirect tapping may be made by clamping a saddle piece to the AC pipe barrel, through the wall of which a hole may then be drllled. Where the saddle and pipe are tapped together, the correct drill should be used and the ferrule should be screwed i

    11、nto both the saddle and the pipe wall. Each ferrule should be screwed in fully and the connection tested to ensure that the flow through the tapping is full bore under the test conditions specified for the pipe system onto which lt is fitted. Installation of Meters (Subclause 5.5.1). Certain authori

    12、ties prefer to install each meter with one long and one short collar joint to avoid having to spring the pipe to remove the meter. ADMINISTRATION Meter Testing at Manufacturers Works (Subclause 7.3). In addition to being subjected to tests by the - manufacturer, meters are tested for accuracy and ce

    13、rtified (by means of a stamp placed on a lead seal) by an inspecLor appointed in terms of the Trade Metrology Act, 1973 (Act 77 of 1973). QUALITY CONTROL AND OTHER CONSIDERATIONS The relevant recommendations of SABS 0157) should be applied to the construction of erf connections. 1) See potable water connections in Code of practice for the construction of fibre-reinforced cement pipelines published by the South African Fibre-reinforced Cement Manufacturers Association in September 1982. 2) Quallty management systems.


    注意事项

    本文(SANS 10120-5 LF-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section LF E.pdf)为本站会员(twoload295)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开