欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    SANS 10120-5 AB-1986 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section AB E.pdf

    • 资源ID:1028588       资源大小:178.35KB        全文页数:4页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    SANS 10120-5 AB-1986 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section AB E.pdf

    1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA

    2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any

    3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. snljs olru : tart 5 Section AR-198tr XII ieei- P; off i :F C l ause PART 5 : CONTRACT AIMINISTRATlON SECTION M CONTEXTS START Ult CONSTMICTION 1 General

    4、1 IMMEDIATELY IWTEH TllE IIANUING OVER OY THE SlIE . 1 Nameboards 1 DURING CONSTIWCTION I. Mcthods of Const.ruction . 1 Care of ecpipelrt 1 Administration 1 Telephones . 1 Care of survey equipment . 1 Losses of office furnishings and laboratory and survey equipment . . . . . . . . . . . . . 1 QUALIT

    5、Y CONTHOL AND OTllER CONSIDERATLONS 1 Second Revision March 1986 This section of the code supersedes SARS 01.20 : Part 5 : Section AB-l982 SABS 1200 AB : ENGINEERS OFFICE NOTE The clause number(s) glven at the begnnmg or after the heading of a clause Ware, unless otherwrse stated, the number(s) of t

    6、he relevant clause(s) of SABS 1200 AB START OF CONSTRUCTION GENERAL. For the purposes of this part of the code, contract administration starts with instructions to the contractor to commence work as set out in Subclause 4.1 of the Introduction. IMMEDIATELY AFTER THE HANDING OVER OF THE SITE NAMEBOAR

    7、DS The engineer should provide details for the wording that is to appear on nameboards (See also l 3 2(a) of Secaon AB of Part 3 of the code ) DURING CONSTRUCTION METHODS OF CONSTRUCTION Care of Eauipment. The contractor should ensure that construction methods are such that there is no risk of equip

    8、ment being lost or damaged. (See also 3.2.2 and 3.2 3 below.) ADMINISTRATION Telephones Subclause 4 1 of SABS 1200 AB requires the contractor to apply to the Department of Posts and Telecommuncations for the installatron of telephones for hrmself and for the engrneer thus establshing that the contra

    9、ctor is responsble for payment of accounts to the sad Department and for all dealngs wth that Department However he IS not required to bear the cost of renting the ergmeers telephone or of calls made by the engineer (see Subclause 5 4 of SABS 1200 AB) The engineer should therefore arrange for the em

    10、ployer to refund direct to the contractor the cost of the engineers telephone calls and telephone rental The cost of the contractor S telephone calls and rental are under the control of and are the responsbility of the contractor Care of Survev Fwiprnent (See Subclause 3.2.4 (PSAB 3) of Section AB o

    11、f Part 2 of the code). Although the contractor is required to insure survey instruments against loss or damage and is under an obligation to replace them when they are for any reason removed from the works, the engineer should take proper care of the Instruments, both because he will be inconvenienc

    12、ed while damaged or lost rnstruments are being replaced and the damage or loss investigated, and because WE contract does not prevent the insurance company from suing the engineer for negligence. l osses of Office Furnishinas and laborato and Suwev Eauiment (Subclause 3.2, and Clauses PSAB 2 and 3 i

    13、n Subclauses 3.2.3 and 3.2.4 of Section AB of Part 2 of the code). As the contractor is entitled to demand the replacement of or payment at replacement cost in respect of any items that are not returned to him when the works are completed, the engineer should obtain detaled receipts when the various ittsms are returned. QUALITY CONTROL AND OTHER CONSIDERATIONS The relevant recommendations of SABS 01 57 should be applied l) Quality management systems.


    注意事项

    本文(SANS 10120-5 AB-1986 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section AB E.pdf)为本站会员(confusegate185)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开