1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SABS 0120 : Part 4 Section DA-1982 Earthworks (small works) (As amended 7988) PART 4 : TYPICAL SCHEDULES OF QUANTITIES SECTION DA CONTENTS Clause Page Nu
4、mber SCHEDULE SECTION : EARTHWORKS (SMALL WORKS) . 1 First Revision March 1982 Reprint 1988 Incorporating Amendment No. 1: 8 June 1988 This section of the code supersedes SABS 0120 : Part 4 : Section DA-1979 Approved by the COUNCIL OF THE SOUTH AFRICAN BUREAU OF STANDARDS ISBN 0-626-08066-5 SABS 012
5、0 : Part 4 Sect ion DA-1982 Earthworks (small works) Amendment No. 1 : 8 June 1988 SABS 1200 DA : EARTHWORKS (SMALL WORKS) NOTE: See Clause 5 of the Introduction. I tem No. Payment refers SABS 1200 C 8.2.1 8.2.2 1200 DA 8.3.1 8.3.2 8.3.2 5.3.3 5.3.4 3.3.6 S . . Short Description SECTION : EARTHWORKS
6、 (SMALL WORKS) CLEARING clear site incl. remove trees up to 1 m girth to approved areas off Site Remove trees with girth: over and up to 1,O m 2,O m EXCAVATION Remove topsoil to nominal depth 150 mm, stockpile and maintain Excavate in all materials and back- fill or place embankment for: Reservo i r
7、 Extra-over item .2.1 for excavation in: Intermediate material Hard rock material Excavate for founds in all materials and place in embankment for: c01 imn foot i ngs Wal l founds Extra-over items .4.1 and .4.2 for excavation in: Intermediate material Hard rock material Overhaul (Prov.) Wted overhaul (b) Long overhaul IMPORT MATERIAL To complete embankment : from borrow pits FINfSHlNGS Topsoiling Local vegetation See also Section D) Unit ha No. No. m* m3 m3 m3 m3 m= m m3 m3 n3. km m3 m2 m Quantity Rate Amount ISBN 0-626-08066-5 sabs pta