    SANS 10120-3 G-1982 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section G Concret.pdf

    • 资源ID:1028521       资源大小:987.68KB        全文页数:12页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    SANS 10120-3 G-1982 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section G Concret.pdf

    1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA

    2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any

    3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SABS 0120 : Part 3 Section G-1982 Concrete (structural) PART 3 : GUIDANCE FOR DESIGN SECTION G CONTENTS Page Number PRE-TENDER CONSZDEWPIONS 1 InvestAgat

    4、ions . 1 Wdter l Aggregates 1 Concrete nix proportions . 1 Administration . 1 Prescribed mix 1 Documentation . 1 Special conditioris of contract . l Expansive alkali-aggregate reaction 1 Concrete exposed to sulphate attack 1 Erawings and berldinq schedule details for reinforcement 2 Tolerances . 2 S

    5、cheduling . 2 Grouting to machine and structural bedplates . 3 DESIGX REQIJIREMEHTS 3 Particulal Problems 3 Concrete subject to alkali-aggregate reaction or sulphate attack . 3 Spacing of bars to be fixed 4 Slab thickness and corlcrete cover 4 Concrete cover over binding wire . 4 Concrete cover incr

    6、eased for exposed aggregate finishes 4 Designated joints and length of main reinforcement . 4 Pipes and coilduits 4 Design of Concrete Mixes . 4 General 4 Degree of control 4 Mix Design Procedure . 6 General 6 Procedure and example for design . 6 APPLICABILITY OF OTHER SAHS CODES 9 TEST PROCEDURES 9

    7、 QUALITY CONTROL AND OTHER CONSIDERATIONS . 9 General 9 Disputes. Mediations. Arbitrations. and Court Cases 9 Scheduled quantities of reinforcicg bars . 9 Flatness o: plane surface 9 Court cases . 9 First Revision August 1982 This section of the code supersedes SABS 0120 : Part 3 : Section G-1982 Ap

    8、proved by the COUNCIL OF TilE SO!JTM AFRICAN BUKEAU OF STANDARDS SABS 0120 : Part 3 Section G-1982 Concrete (structural) SABS l200 G : CONCRETE (STRUCTUXAl.) NOTE: The clause numher(s) given at tlw beginning or after the heading of a clause idare, unless otherwise stated, the nunber(s) of the releva

    9、nt clause(s) of SABS 1200 G. PRE-TENDER COtJSIUEPATIONS TPJVESTIGATIONS Ma:.er (subclause 3.3). If doubt exists as to the suitability of water for concrete making, particularly in remote areas ancl areas where the water is brackish, test the available water during pre-tender irvestigations. In these

    10、 tests, compare the 28-d strength of mortar cubes made with portland cement and the water in question with the strength of similar cubes made with the same cement and water of known purity. The water may be considered fit for use if the average 28-d strength of 3 mortar cubes made with the suspect w

    11、ater is at least 90 % of that of 3 similar cubes made with water of known purity. Aqgregates (Subclause 3.4) Consider, and investigate on the site of the works where necessary, the aggregates that will be most readily and economically available. Utilize the results of such investigations in the proj

    12、ect specification (see 1.1.3, 1.2.1 and 1.3.2 below). Note that Appendix C of SABS 1083) identifies characteristics of certain fine and coarse aggregates that are normally not acceptahlc but are none the less acceptable for use in particular circumstances and are frequently to be preferred on the gr

    13、ounds of economy. Where such aggregates are preferred, say so in the project specification. I.ocal fine aggregates from the Orange River in the Northern Cape and various sources in the Orange Free State are frequently unacceptable tor strength concrete. If such aggregates are unacceptable say so in

    14、the project specification (see 1.2.1 and 1.3.2 below), because the difference in cost between local sand and sand complying with the requirements of SABS 1083) may be significant. Local aggregates which are acceptable are the follcwing: a) Fine aggregate from Port Elizabeth having a fineness modulus

    15、 of between 1.2 and 1,6; b) fine aggregate from Cape Town and environs that is hard sand of shell origin; C) coarse agqregate from the Reef area, consisting of crushed mine rock; d) coarse aggregate from the Pretoria area, consisting of norite. Concrete Nix Proportj%s. - a) Prescribed mix concrete (

    16、Subclause 5.5.1.6). In order to be in a position to specify materials and the mix(es) for prescribed concrete, investigate the availability of materials in the vicinity of the site and, unless satisfactory evidence is available from previ.ous use of the materials and the proposed mix(es), arrange fo

    17、r preliminary tests to be carried out. Arrange also for such tests to be carried out during the progress of the work to check that the specified mix proportions are suitable. (See Subclause 2.1.1 (d) of Section G of Pxt 5 of the code.) b) ? 5) Strength (undue variations in member size, excessive cov

    18、er to reinforcement, and excessive bow in struts are among the deviations which may cause a reduction in strength); c) Fit (when prefabricated units are required to fit together or when machinery is to be installed, the tolerances have to be carefully considered); d) L,egal (structures may not encro

    19、ach on neighbouring property). Bow, camber, twist, and squareness_ (Subclause 6.2.3(d). Tolerances for bow, carcber, twist, and squareness are usually specified where prefabricated components are required to fit together. If necessary, make reference to SABS 0155). Scheduling Reinforcing bars: Measu

    20、rement and rates (Subclauses 8.1.2.1 - 8.1.2.3ia) a) The recent rapid escalation and the expected future rises in the price of reinforcing steel have resulted in such a disproportionate difference in the prices per ton of steel bars of different sizes (diameter or side,.as relevant) that pricing on

    21、the basis of the four groups of sizes formerly used is no longer fair t.o either the employcr or the contractor. On the other hand, except in the case of bridges, difficulty is generally experienced in providing reasonably accurate detailed schedules of reinfor 8Ye;e for structures that have not bee

    22、n detailed completely at the tender stage and, in terns of the GCC , employer can expect to receive claims when the final quantity of steel of any particular size or group of sizes differs greatly from that scheduled. 13) TO ensure that the most reasonable prices are obtained and to minimize the ris

    23、k of disputes, schedu.le reinforcement as shown in Section G of Part 4 of the code (ensuring that the quantities scheduled comply with the notes given on the right-hand side of the typical schedule), and insert a special condition of contract in the contract document,such as one of the following: 1)

    24、 Special Condition of Contract, to be read with 1;cc4) (in contracts other than SA Transport Services: contracts) : Clause 52. Amend Subclause (l), aluations of variations, to read as follows: “52(1) Except in the case of quantities of reinforcing steel that are stated in the Schedule of Quantities

    25、to be “Extra-over the basic Contract Price for 25 mm reinforcing steel, and to be provisional in terms oE the Special Conditions of Contract“, the Engineer shall detormine the amount (if any) to be added to or deducted from the sum named in the Tender in respect of any extra or additional work done

    26、or work omitted by his order. All such work shall be valued at. the rates set out in the Contract if in the opinion of the Engineer the same shall be applicable. If the Contract shall not contain any rates applicable to the extra or additional work, then the Engineer in agreement with the Contractor

    27、 shall fix such prices so far as possible consistent with the rates set out in the Contract as in the circumstances he shall think reasonable and proper.“ Amend Subclause (2), Authority of Engineer to fix rates, to read as follows: “(2) Provided that if the nature or amount of any omission, addition

    28、, increase or decrease in quantity, whether ordered or arising under Subclause 5l(2) relative to the nature or amount of the whole Contract or part thereof, shall be such that it results in a change iri method or scale of operation, process of construction or source of supply, such as in the opinion

    29、 of the Engineer renders the rate or price contained in the Contract for any item of the Works by reason of such omission, addition, increase or decrease of quantity unreasonable or inapplicable, the Engineer i.n agreement with the Contractor shall fix such other rate or-price so far as possible con

    30、sistent wi.th the rates or prices set out in the Contract as in the circumstances he shall think reasonable and proper. Provided also that no increase of the Contract Price under Subclause (1) of this Clause or variation. of rate or price under Subclause (2) of this Clause shall be made unless, as s

    31、oon as is practicak)le, and in the case of extra or additional work before the commencement of the work or as soon thereafter as is practicable, notice shall have been given in writing a) by the Contractor to the Engineer of hi.s intention to claim extra payment or a varied rate or b) by the Enginee

    32、r to the Contractor of his intention to vary a rate or price as the case may be. Provided also that no increase of the Contract Price under Subclause (1) of this Clause or variation of any rate or price under Subclause (2) of this Clause shall be made where the quantities of reinforcing steel measur

    33、ed in the Works vary from those stated in the Schedule of Quantities uzder items scheduled as “Extra-over the basic Contract Price for 25 mm reinforcing steel and to be provisional in terms of the Special Conditions of Contract“, regardless of the magnitude of the variation of such quantities.“ -W-

    34、3) Accuracy in building. 4) General conditions of contract; see footnote to Subclause 1.3.1 of Section A. SABS 0120 : Part 3 Section G-1982 Concrete (structural) 2) Special Condition of Contract far SA Transport Services contract5) : Clause 31.2. Amend Clause 31.2, Dlfffr-ce in final measured3:antit

    35、y more than 20%, to read. as follows: “Except that, regardless of the magnitude of the variation of quantities, no adjustment of the scheduled rate will be made in the case of quantities of reinforcing steel that are stated in the Schedule of Quantities to be “Extra-over the basic contract price for

    36、 25 mm reinforcing steel and provisional in terms of the Special Conditions of Contract“, where the final measured quantity of any scheduled item differs from the estimated quantity by more than twenty (20) per cent, either the Enylneer or the Contractor may request an adjustment of the scheduled ra

    37、te for the particular item and, where the quantities are increased, in respect only of that portion of the final measured quantity which falls outside the limits of the twenty (20) per cent difference. The Engineer will submit full details with his recommendatior: to the Chief Civil Engineers deputy

    38、.“ Welded mesh reinforcement (Subclause 8.1.2.2(b). Where the project involves large quantities of welded mesh, include in the reinforcement schedule lists of the numbers of sheets required, and set out sheets of standard and non-standard sizes separately. Grouting to Machine and Struct.urc71 Bedpla

    39、tes (Subclause 5.5.13). Where grouting to machine and - - -p structural bedplates is required, include suitable project specification clauses based on the example given in Subclause 3.2.14 of Section G of Part 2 of the code and the examples given in Subclause 3.1.13 and the recommendations given in

    40、Subclause 3.2.24 of Section G of Part 5 of the code. DESIGN REQUIREMENTS PARTJCIJLAR PROBLEMS Concrete Subject to Alkali-Aggregate Reaction or Sulphate Attack Alkali-aggregate reaction. See 1.3.2 above. - - Concrete exposed to sulphate attack. When selecting a w/c rati.0 for design purposes in circu

    41、mstances where the concrete will be exposed to sulphate attack, make provision in the design for it to be protected by adopting the applicable of the measures set out in 1.3.3 above and in Table 1 (bearing in mind the NOTE (a)-(e) below and extrapolating for higher degrees of concentration). TABLE 1

    42、 : MAXlMUM WATER/CEI“.EN RATIOS FOR CONCRETE EXPOSED TO SULPHATE ATTACK Concentration of sulphate as SO 3 Degree of sulphate concen- tration Irl soil In ground water Maximum w/c ratio, by mass Recormended type of cement Total SO 3 % by mass SO in 2:1 3 water extract, 9/e Ordinary portland or portlan

    43、d blast- furnace cement Less than 0,2 Less than 30 Ordinary portland or portland blast- furnace cement 0,2 and up to and including 0,5 30 and up to and including 120 Sulphate-resisting portland cement More than 120 and up to and including 250 More than 0,5 and up to and including 1.0 Sulphate-resist

    44、ing portland cement More than 1.0 and up to and includirg 2.0 More than 3,l and up to and including 5.6 More than 250 and up to and including 500 Sulphate-resisting portland cement Sulphate-resisting portland cement plus adequate pro- tective coatings Over 2,O Over 5,6 Over 500 5) E5 Conditions of c

    45、ontract, published by the SA Transport Services. SABS 0120 : Part 3 Section G-1982 Concrcte !structural) PIOTE a) Determine the concentration of sulphate as SO3, using SABS Method 850. b) Table l applies wily to concrete made with aggregates from natural sources placed in near-neutral ground water o

    46、f pH G-pfi 9, containing naturally occurring sulphates but not contaminants such as amoniurn salts. Do not select ordinhry portland cement for concrete to be placed in acidic conditions (pH 6 or less). Sulphate-resisting portland cement is sliyhtly more acid-resistant than ordinary portland cement b

    47、ut no experience of lirge-scale use in these conditions is currently available. Supersulphated cement (which is currently not manufactured in the Republic: of South Africa) has proved to give an acceptable life in rnincral acids of pli as iow as 3,5, provided that the concrete is dense and has a w/c

    48、 ratio of 0,4 or less. C) The w/c ratios given tor Degree 2 are the maxima recommended by the manufacturers. For SO3 contents near the upper limit of Derjree 2, lower w/c ratios are recommended. cl) Where the total. SO3 concentration (Column 2) exceeds 0.5 %, a 2:l water extract from the soil may re

    49、sult in d lower site classi.fication if much of the sulphate is present as low-solubility calcium sulphate. C) Where the concrete i:. subject to severe stresses or is exposed to water, e.g. thin sections, sections under. hydrostatic pressure on one side only, sections partly immersed, give consideration to a decrea2.e in tile w/c ratio recommended and, if necessary, increase the cement content to ensure the degree of workability needed for full compaction and thus minimum pcrrneability. Spacinq of Bars to be Fixcd (Subclause 5.1.2). Note that the maximum


    注意事项

    本文(SANS 10120-3 G-1982 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section G Concret.pdf)为本站会员(孙刚)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开