    REG NASA-LLIS-6696-2012 Lesson Learned - Verify Test Equipment Functionality Before Testing.pdf

    • 资源ID:1019549       资源大小:255.49KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-6696-2012 Lesson Learned - Verify Test Equipment Functionality Before Testing.pdf

    1、Public Lessons Learned Entry: 6696 Lesson Info: Lesson Number: 6696 Lesson Date: 2012-8-28 Submitting Organization: JPL Submitted by: David Oberhettinger Subject: Verify Test Equipment Functionality Before Testing Abstract: A failure in the system-level testing of the MSL Robotic Arm was traced to G

    2、SE wiring that was mis-connected. Because re-test was not feasible, the functionality was verified by analysis. For system-level thermal testing during ATLO, the functionality of all GSE instrumentation should be unequivocally verified prior to closing the chamber doors. Description of Driving Event

    3、: System Thermal Test (STT) of the Mars Science Laboratory (MSL) rover was conducted during Assembly, Test, and Launch Operations (ATLO) at the NASA/Caltech Jet Propulsion Laboratory (JPL) in March 2011. One of the components tested during this system-level, low temperature, low pressure test is the

    4、 percussive drill at the end of the MSL Robotic Arm (RA), located at the front of the rover and used to take rock samples on Mars. This is a complex mechanism, with three cold-sensitive actuators in the drill, another five in the RA, and a total of sixteen in the Sample Acquisition/Sample Processing

    5、 and Handling (SA/SPaH) subsystem. One objective of the STT is to verify at the operational temperature, by means of a Drill Force Transducer, the calibrated force applied by the RA against the drill bit. The force is verified during the test by a load cell (Figure 1) embedded in a ground support eq

    6、uipment (GSE) preload plate (Figure 2) that is integrated into the rover STT GSE (Figure 3). Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Figure 1. Load cell (i.e., single-axis force sensor) embedded in the (GSE) RA Preload Plate Assembly Figure 2

    7、. Fully assembled RA Preload Plate Assembly mounted on the STT support frame (white GSE test fixture) Figure 3. Full view of the MSL rover and the RA Preload Plate Assembly, both mounted on the rover STT support frame (white GSE test fixture) in the test chamber During the test, the RA was commanded

    8、 to apply an increasing preload, in increments of 50 N, to 300 N. However, the load cell embedded in the preload plate did not register an increase in force. (Prior to delivery to ATLO, the load cell had been calibrated and its functionality verified.) The proximate cause of the test failure was the

    9、 incorrect connection of the AC power leads to the amplifier unit supplied with the load cell (Reference (1). This occurred during ATLO integration of the STT electrical ground support equipment (EGSE) hardware, and it resulted in no power being sent to the load cell. The root cause was inadequate i

    10、nstructions and procedures for unit assembly prior to STT. A contributing cause was that the GSE load cell functionality was not adequately verified prior to starting STT. Specifically, a step to verify the load cell was performed after it was integrated into the STT GSE in the test chamber, but the

    11、 data obtained during this verification was erroneously interpreted to conclude that the load cell worked. The verification of the Drill Force Transducer at temperature was accomplished by force measurements, using the deflection of the Drill Bit Box (given its known spring constant) and the gravity

    12、 vector on the drill as the turret rotated. References: 1. “Preload plate single axis force sensor giving erroneous readings during STT,“ JPL Problem/Failure Report No. 48193, March 21, 2011. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Lesson(s)

    13、Learned: Once EGSE has been integrated with flight hardware, the spacecraft has been placed in a thermal-vacuum chamber, and the testing reveals that EGSE was not properly configured to test the functionality of one of the components, it may not be feasible to interrupt system-level testing to corre

    14、ct the test configuration error. For the MSL Drill Force Transducer, verification was accomplished by analysis, but this practice is not generally considered as satisfactory as verification by test. Recommendation(s): For system-level thermal testing during ATLO, it is important to unequivocally ver

    15、ify the functionality of all GSE instrumentation prior to closing the chamber doors. Evidence of Recurrence Control Effectiveness: JPL has referenced this lesson learned as additional rationale and guidance supporting Paragraph 6.12.5.3 (“Engineering Practices: Protection and Security of Flight Hard

    16、ware”) in the Jet Propulsion Laboratory standard “Flight Project Practices, Rev. 7,” JPL DocID 58032, September 30, 2008. Documents Related to Lesson: N/A Mission Directorate(s): Exploration Systems Science Additional Key Phrase(s): Integration and Testing Additional Categories.Ground Equipment Addi

    17、tional Categories.Hardware Additional Categories.Spacecraft Additional Categories.Test & Verification Additional Info: Project: Mars Science Laboratory Approval Info: Approval Date: 2012-09-17 Approval Name: mbell Approval Organization: HQ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-6696-2012 Lesson Learned - Verify Test Equipment Functionality Before Testing.pdf)为本站会员(terrorscript155)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!