欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-6477-2012 Lessons Learned - Impediments to Implementing Earned Value Management.pdf

    • 资源ID:1019540       资源大小:92.05KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-6477-2012 Lessons Learned - Impediments to Implementing Earned Value Management.pdf

    1、Public Lessons Learned Entry: 6477 Lesson Info: Lesson Number: 6477 Lesson Date: 2011-11-15 Submitting Organization: JPL Submitted by: David Oberhettinger Subject: Impediments to Implementing Earned Value Management Abstract: During a pilot exercise intended to advance the practice of EVM at NASA, t

    2、he pilot project facilitators observed resistance from the projects towards making the project and institutional changes needed for effective implementation of the EVM process. Implementing initiatives like EVM across the NASA Centers may require a formal change management initiative to overcome org

    3、anizational inertia, cultural resistance, and a lack of local support, readiness, and buy-in. Description of Driving Event: Although NASA projects with funding of over $20 million are required to use Earned Value Management (EVM) techniques to measure and assess project performance (Reference (1), E

    4、VM systems and processes are not well established throughout NASA. The NASA EVM Capability Project was established by the NASA Office of Chief Engineer (OCE) to develop and pilot an agency-wide, in-house, EVM capability that will meet NASAs project management requirements and ensure compliance with

    5、the federal Office of Management and Budget (OMB) mandates. The NASA Program Management Council (PMC) approved the NASA EVM Capability Project on December 16, 2009. There are three primary objectives of the EVM project: 1. Establish a NASA EVM process, along with the supporting documentation, that c

    6、an be used as a model for all NASA projects that must implement EVM. 2. Demonstrate the NASA-wide EVM capability process on two projects (1) the Extravehicular Activity (EVA) Systems Project and (2) the Ice, Clouds, and Land Elevation Satellite II (ICESat-2) Project. The purpose of these two EVM pil

    7、ot exercises is to test and modify the process as needed to ensure the most effective implementation of a NASA-wide EVM capability. Sponsored by the Exploration Systems Mission Directorate (ESMD) and managed by NASA Johnson Space Center, the EVA Systems Project seeks to protect humans while operatin

    8、g outside the pressurized spacecraft environment and while exploring other planetary bodies. Sponsored by the Science Mission Directorate (SMD) and managed by NASA Goddard Space Flight Center, ICESat-2 is the second generation of the orbiting laser altimeter ICESat scheduled for launch in early 2016

    9、. 3. Enhance NASA management insight into project performance by employing an effective EVM capability. Where a NASA Center has adopted a culture of less structured project control, the requirement to implement an EVM process may spur institutional resistance. Unfamiliarity with EVM tools, procedure

    10、s, and products may lead to a perception that the associated project planning and management workload will not bring commensurate benefits to the project. Because adopting a scheduling methodology compatible with EVM meant that some ICESat-2 project processes had to change, organizational inertia wa

    11、s a factor resisting the changes (Reference (2). While conducting the EVM pilot exercise for both the EVA Systems and ICESat-2 projects, the EVM Capability Team organizers observed resistance from the project teams towards making the project and institutional changes needed for effective implementat

    12、ion of the EVM process. One possible cause of the resistance was that the NASA Center line organizations employed business processes that differed from those of the EVA and ICESat-2 project organizations, and these different business approaches raised impediments and friction. While the ICESat-2, Ma

    13、gnetospheric Multiscale (MMS), and Mars Atmosphere and Volatile Evolution Mission (MAVEN) projects were frequently referenced to provide representative examples of EVM processes and products, these projects had quite differing EVM and project management practices. Also, Center management was unaware

    14、 that the ICESat-2 project had not adopted Center-approved planning rates and factors. The JPL member on the EVM Capability Team recognized this cultural resistance to establishing processes conducive to EVM implementation, as the resistance echoed the early JPL project response to EVM process initi

    15、atives. References: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1. “NASA Program and Project Management Processes and Requirements,” NPR 7120.5D, March 6, 2007, Paragraph 3.1(c). 2. Jerald Kerby, NASA Earned Value Management (EVM) Capability Proj

    16、ect, EVM Steering Committee Presentation, August 15, 2011. Lesson(s) Learned: Major strategic initiatives like EVM often encounter implementation problems because the organization underestimates the scope and complexity of the intended process changes. Implementing initiatives like EVM across the NA

    17、SA Centers may require a formal change management initiative to overcome organizational inertia, cultural resistance, and a lack of local support, readiness, and buy-in. Strong support from senior Center management is essential. Recommendation(s): Before commencing implementation of major strategic

    18、initiatives like EVM, NASA should formulate a change management strategy, including such elements as a: Change management plan that incorporates a structured change management methodology. (Note that acceptance of a change management plan by senior Center management may help assure project buy-in of

    19、 a change that has been imposed externally upon the Center.) Change management planning checklist for use by the implementing authority to assure that all activities needed to implement the change (e.g., identifying resources, training project personnel, testing the completed change) have been addre

    20、ssed. Communication plan. Recognition and rewards plan. Evidence of Recurrence Control Effectiveness: The JPL-led pilot study was performed on a set of NASA Center-managed projects. The NASA Centers will be documenting and refining their EVM processes to preclude EVM process defects like those revea

    21、led by the pilot study. Documents Related to Lesson: N/A Mission Directorate(s): Aeronautics Research Exploration Systems Science Additional Key Phrase(s): Program Management.Business processes Additional Categories.Program and Project Management Additional Info: Project: Ice, Clouds, and Land Eleva

    22、tion Satellite II (ICESat-2) and EVA Systems Project Approval Info: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Approval Date: 2012-03-22 Approval Name: mbell Approval Organization: HQ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-6477-2012 Lessons Learned - Impediments to Implementing Earned Value Management.pdf)为本站会员(tireattitude366)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开